Difference between revisions of "Pharm Tech Minutes 2011.10.27"

From IHE Wiki
Jump to navigation Jump to search
Line 125: Line 125:
  
 
Most urgent thing to decide.
 
Most urgent thing to decide.
 +
F2F meeting in the US or just delegates at the US Connectathon ?
 +
Grouping PHARM with PCC on HIMSS (because no product or showcase available for the moment)?
 +
Approach NCPDP for the Community pharmacy part at HL7 WG ?
 +
Will HMW have opportunities on the US market ? need advertising.
 +
 +
Most of the members of the group will not be able to come at a f2f meeting based in Chicago.
 +
Tom de Jong will perhaps be able to join : HL7 WG (in San Antonio) dates are close to US connectathon dates.
 +
Option 1 : f2f meeting in Chicago ==> 1 abstention / 9 against / 0 approval
 +
Option 2 : f2f meeting in Europe  ==> 1 abstention / 0 against / 9 approval
 +
 +
Charles, Vassil ...: prepare a list of ideas that make sense for marketing and presentation of IHE Pharmacy
 +
 +
'''Place'''
 +
 +
* In February : match with the ITI / QRPH / PCC meeting '''in Paris ?'''
 +
 +
Find one overlapping day ? In parallel ? Diner ?
 +
 +
Difficult it's Monday 6 to Friday 10 February, the whole week.
 +
 +
* Somewhere else ?
 +
 +
Porto ?
 +
Venice ?
 +
 +
Decision at the next Tcon
  
 
==      Status overview ==
 
==      Status overview ==

Revision as of 18:50, 1 November 2011

Attendees

  • Brandstätter, Jürgen (CodeWerk Software Services and Development GmbH, co-chair IHE)
  • De Jong, Tom (Nova Pro)
  • Demarmels, Marco (Lake Griffin, LLC)
  • Géraud, Thierry (CareFusion)
  • Hafner, Viktor (Linden Apotheke)
  • Letellier, Simon (EAHP, secretary)
  • Parisot, Charles (GE)
  • Peytchev, Vassil (Epic)
  • Rica, Charles (ASIP Santé)
  • Robberecht, Marc (Agfa Healthcare)
  • Rodrigues, Orlando (Glintt - Heatlhcare Solutions, S.A)
  • Tzimis, Leonidas (EAHP)
  • Zalunardo, Luca (Arsenal.IT)

F2F meeting Paris, Oct 4./5., 2011

Approval of minutes

Day 1 : IHE Pharmacy F2F Meeting
Day 2 : IHE Pharmacy & HL7 Pharmacy Joint Meeting

Workitems will be restarted based on the use cases (particular supplies for patients). Prepare workitems for the next cycle.

are added to the minutes on Vassil's proposal, to explain the agreement approved, following the presentation of the white paper for the realization, based on this, of work items for the next cycle.

With this addition, minutes are approved unanimously.

Summary on major decisions

  • 3 Whites Papers:
1) exceptional uses cases,
2) medication - documentation profile and
3) hospital medication supply chain
  • CP ballot for TF maintenance

Schedule for season 2011/2012 (Jürgen)

Draft schedule 2011-2012 version 2

Work items

  • add the usual cycle
  • getting a brief/detail proposal working through use-cases in volume 1 Information and then the details of the transactions , the content profiles working on volume 2 part and then carry enough time for each one.
  • So that's how the dates hasn't change from the original proposal.

Just they have original tasks for each date.

Review

started from the back

With the deadline : august 31th 2012 to have updated profiles on the IHE website.

Send to IHE secretary 2 weeks before : 15th august

In fact, August 15th is the real deadline.

Before that all the (New) Work Items and the CPs are balloted and reviewed for Final Text.

2 weeks is the minimum time allowed to editors to integrate the CPs into the profiles.

The last Tcon of this cycle will be on August 15th. A dedicated Tcon is really better than email discussions to check all remarks.

  • Ballot phase : 30 days minimum.

It mean : start the ballot on July 14th. Not too bad to proceed during holiday time, The suggestion is to use July for the ballot, with no many TCon during this period.

Looking on the CPs will be done extensively before. So for all of us, who are involved in the process, it will be no problem to give the vote.

We can have one or more ballots. Multiple ballots :

Will it be possible to start a CPs ballot in June 28th ?
And New work items ballot in July ?

Allow more time in august to review and integrate the CPs. Start the Ballot as soon as it's ready.

  • Phase of the substantial works (Feb/June)

Start after the Feb 15th Tcon. The editors show up. Plan one Tcon in the middle to have a review. Need significant time available for this Tcon to go in deep in the technical topics, and make decisions. Need to be well prepared by each editor. That mean, Write questions ready in advance. One month later , it's a Tcon in the same manner. And then, there is the F2F meeting, traditionally at the Connectathon, in May. Quite late, but still works on the CPs.

  • Planning Phase

Officially start November 1st with the call for proposals. Ended November 30th, but maybe it will be extended. At the Dec. 15th Tcon, First review of received Work Items. Usually based on use cases, planning criteria. Discussion on the needs, on who will benefit of each proposal. On second review i'll be more technical : white paper ? profile ? new actors ? Final approval in February.

The separation of planning criteria and technical criteria is very useful to help focus the understanding of everybody of what is going to be done, and help when a thing is approved to really be able to start pretty much right away and keep working on work items.

  • F2F in the USA ?

Most urgent thing to decide. F2F meeting in the US or just delegates at the US Connectathon ? Grouping PHARM with PCC on HIMSS (because no product or showcase available for the moment)? Approach NCPDP for the Community pharmacy part at HL7 WG ? Will HMW have opportunities on the US market ? need advertising.

Most of the members of the group will not be able to come at a f2f meeting based in Chicago. Tom de Jong will perhaps be able to join : HL7 WG (in San Antonio) dates are close to US connectathon dates. Option 1 : f2f meeting in Chicago ==> 1 abstention / 9 against / 0 approval Option 2 : f2f meeting in Europe ==> 1 abstention / 0 against / 9 approval

Charles, Vassil ...: prepare a list of ideas that make sense for marketing and presentation of IHE Pharmacy

Place

  • In February : match with the ITI / QRPH / PCC meeting in Paris ?

Find one overlapping day ? In parallel ? Diner ?

Difficult it's Monday 6 to Friday 10 February, the whole week.

  • Somewhere else ?

Porto ? Venice ?

Decision at the next Tcon

Status overview

Change proposals

CP ballot #1 – Status (Jürgen)

CP for CMPD to incorporate XDW (Luca, Arianna, Jürgen)

Workflow-in-CMPD (See slides attached)
Workflow in CMPD with PADV
Questions to be discussed:
Basic workflow (see slides attached)
  • Is it ok?
  • Shall it be required mandatory as the “minimum workflow” in the profile?
Shall there be one workflow document per prescription or one per prescription item?
Shall we use “in progress” states or leave all tasks as “born completed”?
ATTENTION
There will be a subsequent TCon just on this topic at Monday, Oct 31., 2011, 16:00 – 17:30 (Paris time)

Whitepapers

Medication Documentation (Marco, Ana, Jose)

Use-case: Community – Hospital, Step 1 (Orlando, Leonidas)

HMW Exceptional cases, Step 1 (Marc, Leonidas)

CMPD Exceptional cases, Step 1 (Jürgen, Viktor)

Supply chain (Simon)

Work items

Perfusion administration / PCD Alignment (Marc, Vassil, Jürgen)

PHARM_HMW – PCD PIV-IPEC Mapping
Infusion in HMW

Glossary work item (Marco)