PCD Virtual Connectathon Testing 2009
This page provides the Patient Care Device domain a place to
- list and describe the tests that are required for each actor and participant
- an ability to find and document partners and test schedule
Tests Required of Each Profile and Actor
Please refer to the table in each Pre-Connectathon test document for identification of the tests.
Scheduling and arrangements for testing are made by the developers.
Systems that cannot conduct tests over the Internet should test with emailed messages and the MWB or other tool and record results as if the test was conducted over the Internet, noting that this was a simulation in the last column of the Results Table.
Companies and Systems Supporting the Actors
Test Results
Sending System Developer Name Receiving System Developer Name Pre-Conn Test No. Date Successful Simulated or Internet Comments