Difference between revisions of "PCD Virtual Connectathon Testing 2009"

From IHE Wiki
Jump to navigation Jump to search
m (→‎Partners and Schedules: Establish section)
m (→‎Test Results: continue to establish)
Line 39: Line 39:
 
| '''<Simulated or Internet>:'''  |
 
| '''<Simulated or Internet>:'''  |
 
| '''<Comments>:'''  |  
 
| '''<Comments>:'''  |  
 +
 
|-
 
|-
| align="center" | 62
+
| align="center" |  
| '''<Action Item>''' |Incorporate Bar Coding into ADT implementations; which domain is responsible?
+
| '''<Sending System>''' |  
| '''<Owner>:'''  |Todd
+
| '''<Developer Name>:'''  |  
| '''<Participants>''' | Co-chairs
+
| '''<Receiving System>''' |  
| '''<Due Date>'''  | 2009.01.21
+
| '''<Developer Name>'''  |
| '''<Status>''' |OPEN
+
| '''<Pre-Conn Test No.>''' |
| '''<Comments>:'''  | Can consistency be achieved for bar coding across vendors, domains? Todd has been in contact with HIBCC. Todd will add to Future Topics Agenda of Domain Cochairs.
+
| '''<Date Successful>:'''  |
 +
| '''<Simulated or Internet>:'''  |
 +
| '''<Comments>:'''  |
 +
 
 +
|-
 +
| align="center" |
 +
| '''<Sending System>''' |
 +
| '''<Developer Name>:'''  |  
 +
| '''<Receiving System>''' |
 +
| '''<Developer Name>'''  |
 +
| '''<Pre-Conn Test No.>''' |
 +
| '''<Date Successful>:'''  |
 +
| '''<Simulated or Internet>:'''  |
 +
| '''<Comments>:'''  |
 +
 
 +
|-
 +
| align="center" |
 +
| '''<Sending System>''' |
 +
| '''<Developer Name>:'''  |
 +
| '''<Receiving System>''' |
 +
| '''<Developer Name>'''  |
 +
| '''<Pre-Conn Test No.>''' |
 +
| '''<Date Successful>:'''  |
 +
| '''<Simulated or Internet>:''' |
 +
| '''<Comments>:'''  |
  
 
== Links ==
 
== Links ==

Revision as of 19:54, 25 January 2009

This page provides the Patient Care Device domain a place to

  • list and describe the tests that are required for each actor and participant
  • an ability to find and document partners and test schedule

Tests Required of Each Profile and Actor

Please refer to the table in each Pre-Connectathon test document for identification of the tests.

Scheduling and arrangements for testing are made by the developers.

Systems that cannot conduct tests over the Internet should test with emailed messages and the MWB or other tool and record results as if the test was conducted over the Internet, noting that this was a simulation in the last column of the Results Table.

Companies and Systems Supporting the Actors

Test Results

Sending System Developer Name Receiving System Developer Name Pre-Conn Test No. Date Successful Simulated or Internet Comments

Links

PCD Pre-Connectathon Testing 2009

PCD Showcase 2009 Scenario

PCD Home

PCD Connectathon&Showcase WG 2008-9