Line 1,227: Line 1,227:
 
|-
 
|-
 
| align="center" | 187
 
| align="center" | 187
| '''<Action Item>''' |  
+
| '''<Action Item>''' | Wiki page updates: Cochairs address cross group pages
| '''<Owner>:'''  |  
+
| '''<Owner>:'''  | Jeff McGeath
 
| '''<Participants>''' |  
 
| '''<Participants>''' |  
| '''<Due Date>'''  |  
+
| '''<Due Date>'''  | October 21, 2014
| '''<Status>''' |OPEN
+
| '''<Status>''' |CLOSED
| '''<Comments>:'''  |  
+
| '''<Comments>:'''  | April 4, 2014: WGs address their specific wiki pages.  Announce at PC and TC calls and add to respective Action Item lists.  August 6, 2014:  Set date to August 20.  October 1, 2014:  Getting in alignment with other domains.  All domains are to contain certain content.  Wiki pages need to be brought up to date.  Monroe updated the OID page, the date page is current, a number need updated.  Tag appropriate pages for coordinated work.  Will add an agenda item to Co-Chair to review a page per meeting.  Change date to F2F.'''  October 15, 2014:  Close here and add to co-chair agenda.'''
  
 
|-
 
|-

Revision as of 11:57, 15 October 2014

Closed Items 60 - 69

Number Action Owner Participants Due Date Status Comments


60 Update TF Todd, Ken John Rhoads 2011.12.31 Closed Previous history is available on this Wiki (see history tab).

The update will include PIB, SPD. Todd will ask the IHE Cochairs if the format must be changed to the new format or can be left as is. A format change to the TF is anticipated. This would place the boiler plate into volume 0. Manny to develop the essential elements of the Integration Statements and check to see if the requirement for PCD-01 from the DOR to the DOF is clearly written. Robert is leading a group addressing the issues with PAM ITI-30 and 31. Paul noted that web services will provide additional benefits such as security. The profile updates to HL7 v 2.6 will be folded in. Dec. 9, 2009: Change date to Dec. 18. John Garguilo noted Bikram’s observation about OBR field lengths. He recommended discussion and decision, perhaps using RE for those not used. Paul noted that there will be CPs coming out of coordination with Continua. Feb. 24, 2010: Updating TF is in progress, addressing non-controversial items. A draft of Volume 2 will be available shortly. Volume 3, delayed, will contain much of what was in Volume 2. CPs for Continua harmonization will be incorporated before the revised TF is issued for ballot. June 30, 2010: Change date to Sept. 15. September 22, 2010: Todd is working on TF Volume 3 which will include what was Volume 2 Appendix D. Manny to ask Todd for a potential date. April 6, 2010: Change due date to April 27 and note open ballot. John Rhoads noted that one more CP regarding OBX-18 may come in response to the ballot. Then a new TI version will be developed with items not yet ready for FT. May 2011 F2F, reviewed by TC June 1: FT will be balloted by June 15 and Ken, John will edit Volumes 1 and 2 for next iteration in the future. August 17, 2011: Volumes 1 and 2 have been published in Final Text. Todd is working on volume 3. Todd is also working on a CP to clarify the security wording. Close, open new with cycle. Leads: Ken, John Rhoads, Todd.

62 Incorporate Bar Coding into ADT implementations; which domain is responsible? Todd Co-chairs 2009.07.01 Closed Please see summary of June 3 for history http://wiki.ihe.net/index.php?title=PCD_TC_2009-06-03_Webex#Discussion. John Rhoads reviewed the topic as discussed at the DCC. Ken and Todd took this to the DCC approximately 6 months ago. The DCC suggested PCD take the lead and coordinate the various IHE Domain. John indicated this was the same approach the DCC took again recently. Todd noted that Khalid is developing an approach for DPI and asked that John take this back to the DCC and he agreed to do so. Paul asked if bar codes (which are available in different standards) are the only identifier of interest. Others could include the patient’s photo. Todd suggested the PC draft a brief profile proposal that could be used to recruit ITI, Radiology and possibly PCC to join the effort. John asked Khalid if he would lead this effort and Khalid agreed to give this some thought. Paul noted that PCD-01 permits multiple patient identifiers. Change date to July 1.

October 28, 2009: Bar coding can be folded into patient ID (#84). Close.

66 HL7 IHE-PCD Integration (Message) Profiles (i.e., Message Workbench [MWB] profiles) John Garguilo Al Engelbert, Todd Cooper, Robert Flanders. OPEN Closed Previous history is available on this Wiki (see history tab).

Gary volunteered to develop and maintain MWB profiles for three profiles, including tables (data type and others); initial versions are available and can be enhanced for future (cycles) use. Gary is maintaining MWB profiles and NIST bases/develops their message context validation files based on the MWB HL7 profiles. Volunteers are requested to help on the other profiles (ACM PCD-04 through 08). For ACM, Monroe indicated that only PCD-04 is currently stable. Gary will work on PCD-04 as well. Manny will talk with Nick regarding IDCO (for PCD-09). Gary noted that the MWB tool permits building the message, while that is not available in the NIST tools. John Garguilo noted that the MWB also provides the capability to execute (or simulate) a sending/receiving system for testing. NIST is working on building Test Agents to achieve similar functionality and John will provide updates as the Agents are written in software. September 22, 2010: John Garguilo will ask members to take responsibility for maintaining the profiles and keep the latest version on the ftp site. Companies will be able to constrain these further. Gary will lead an effort to coordinate this. Manny indicated that the MWB and Peter Rontey’s tutorial are posted on the ftp site. If any changes are required members should send Manny an email. Peter has limited time available because his responsibilities have changed. He may have room in an upcoming tutorial but is not offering tutorials regularly. April 6, 2010: John Garguilo suggested that this will be less of an issue with further development of NIST tools. John Garguilo will take the lead and attempt to gather the latest versions. He noted that Peter Rontey is unable to maintain the tool, but it may still be useful as a system to test against until the NIST tool provides that service. Al noted that another use for the MWB is to have a local system. John Rhoads suggested that it also provides useful reports. HL7 continues to recognize the MWB as a tool. Al asked if the NIST tool will produce an XML conformance profile. The NIST tools will accept XML profiles and might provide the conformance profile to use in the MWB. This will permit the MWB profiles to be updated in synch with NIST updates. John Rhoads suggested that GForge be used for version control. Date changed to May 31. August 17, 2011: Change date to Open. January 3, 2012: There was a consensus that: With the availability of NIST’s interactive tool and NIST making the XML files (“performance profiles”) available, this Action Item will no longer be needed. John Garguilo suggested closing this item and opening a new Action Item for Performance Profiles that would be used with tools such as SPY, MWB. Al suggested that the NIST tool is sufficient. Robert indicated that the XML files, the MWB and the NIST tool are helpful. A new item will be added, with Robert and John Garguilo responsible.

67 Integration Profile Registration (w/ OID Defs) John Garguilo Al Engelbert, John Rhoads, Todd Cooper, Robert Flanders. 2010.09.29 Close Previous history is available on this Wiki (see history tab). Note that once the final TF Vols are produce in early 2010, verify that the OIDs registered with IHE are still correct. April 6, 2010: Close. PCD has OIDs now. Al Engelbert asked if the OID will change as a profile changes. John Garguilo responded that another element, .x, will be added and reflect the version. OIDs are tracked on a Wiki page.

Once the PCD Technical Framework (Vols I and II) comment period ends (early September 2010) and the final versions are available (Trial Implementation Version), OIDs for the IHE-PCD Integration Profile transactions can be registered with Steve Moore at IHE. Todd set up Google Group and Wiki Page to establish a baseline. See [[1]]


Closed Items 70 - 79

Number Action Owner Participants Due Date Status Comments
77 Preparing a Proposal to HL7 for Pharmacy WG (new name) Gary Meyer Jeff Rinda, Al Engelbert 2010.03.31 Close Jeff noted this is not a critical issue, but the pharmacy group needs to address the issue. Gary is monitoring the Pharmacy WG. They are focused on community practice. Gary suggested that about a third of this work will be useful for institutional practice. Ruth noted that HITSP is working on the ordering process. NCPCP is working on an HL7 2.5 messaging process. This work is US focused and may become an issue internationally. They may not be interested in addressing this in this cycle (Atlanta the week of Sept. 21). Dec. 9, 2009: Change date to Feb. 20. June 30, 2010: Close as completed.
79 Change Proposal Tutorial 2009.07.01 CLOSE Provide a tutorial on filing Change Proposals. These have been suggested and need CPs: ACM: clarify coding of multiple aspects of an alarm; Infusion Pump: clarify coding. John Rhoads / Todd Cooper to contact those developing CPs to ensure the process is understood and properly managed.


Closed Items 80 - 89

Number Action Owner Participants Due Date Status Comments
82 PCD OIDs & URNs (Also see # 153) Todd, John Rhoads John Garguilo July 30, 2014 CLOSED For history see history tab.

There is an IHE PCD OID page. The IHE Domain Coordination Committee has had a very active discussion re. the management of OIDs within IHE. OIDs will be available when needed. Dec. 9, 2009: Robert reported no news; change to Feb. 4. August 31, 2010: John Garguilo edited action item 67 which needs to follow the management principles established for this action item - 82. See OID page: [[2]]. April 6, 2011: Refers to IHE GForge. The next step is to document its usage. Change date to May 31. August 17, 2011: Change date to Oct. 18. Feb. 8, 2012: Change date to April 23. July 23. 2012: John Garguilo has updated the Wiki page. He noted that some are finding their way into the TF. Some documents have two OIDs to address the need for a hierarchical structure. Sept. 5, 2012: John Garguilo plans to update this in time for the F2F. Nov. 12, 2012: Change date to Dec. 31, 2012. Jan. 9, 2012: John Garguilo asked that members review the PCD OID page (linked from www.ihe.net). He noted that NIST will continue to be more rigorous in testing that OIDs are used in messages. John Garguilo and John Rhoads to update the TF with OID references. He will bring this up at the HL7/IEEE meeting next week. Change date to April 17. Spring 2013 F2F: Michael (West) and John Garguilo to review OID Management documents. Sept. 4, 2013: This and other Action Items will be addressed in the F2F. Change due date to Oct. 9. January 15, 2014: Still open, not much going on. Change due date to March 26 June 11, 2014: Have an OID tree, Monroe used it. Need to ensure proper OIDs used in tests. Need to officially register a root OID on IHE wiki page from ISO and build tree structure with parent number. Move to July 30. July 16, 2014: Tree exists, can build on it. CLOSE

83 MOUs Sandy Ken 2010.05.03 Closed Follow up MOU status with CIMIT, ASTM. Ken reported that Julian presented this to the ASTM. John Garguilo reported they had a meeting with the FDA and updated them on NIST tools and their work with PCD. June 30, 2010: Move to PC.
84 Patient Identity and PCD Messages Todd, Khalid, Gary 2009.07.01 Close How best to accomplish this tie will be addressed in the white paper for further development as a supplement to PIB (Todd). Coordination with IEEE (-20103 CCOM) and ICE-PAC will be accomplished Jan. Draft a patient association brief profile proposal (Khalid). The A04 registration message is not the commonly used message, while A01 is used by hospitals at admission (Gary). Gary will review this issue and it will be factored into the CPs for publication and testing in the 2010 Connectathon. Also see 62. Note related discussions in the Infusion Pump WG.Dec. 9, 2009" Close; folded into detailed profile proposal.
86 Test Tools John Garguilo, Rob Snellick Manny 2009.07.15 Close NIST will explore a registry for MWB files (Rob). Manny to request PCD Connectathon WG to post MWB files. Change date to June 17, add John Garguilo to the effort. NIST is open to providing incremental releases of "test artifacts" (which include MWB profiles). Need to determine when such information is desired to be available for viewing/browsing. This information would be part of the Testing Infrastructure as part of a public repository. Can we establish a date to make this available by? Members were asked to send Garguilo any MWB files that should be considered when developing registered profiles. Dec. 9, 2009: Close; NIST will add stable profiles to their registry. Combine with #66.
87 IDCO Nick 2009.07.01 CLOSED For history see history tab and previous meetings.

Nick Steblay reviewed the public comments received on IDCO. Use case clarification/modification will be addressed in response to Manny’s comment suggesting that a flag be set to indicate clinician review (validation). With regard to identification of the pacemaker, there is a unique identifier for the device that includes vendor, model and in some instances the serial number. Paul noted that the interrogator should be identified for traceability, and use EUI-64. Nick responded that device vendors do not send this now, and this would be an issue. It was agreed that this will be resolved in the future. John Garguilo indicated the WG is currently addressing RTM issues. IDCO leadership will be invited to report at the next TC meeting.

88 Cycle 4 Supplement Status Ken, Todd 2009.07.01 Close John Rhoads, Monroe, Paul offered to review the WCM document. Cycle 4 Supplement Status - Anticipated release dates are: IDCO - June 1; PIV - June 1; RTM - June 1; WCM - September 1. White Papers: DPI and MEM will be available this summer. PIV: Recent WG F2F: Todd briefly summarized the meeting. Those interested are referred to the Wiki page (see agenda list above). He noted it was a very productive meeting. RTM update: Paul found 40 errors and as a result is looking at automating the process for identifying them. He noted the harmonized table is looking good. Work continues on RTM ventilator terms. The RTM update should be available for TC ballot in about 10 days.

CPs: A number of change proposals are in development. He suggested that the PIV WG review these as soon as possible. Dec. 2, 2009: Close.

89 Verify process for “public comment” period Todd, John Rhoads 2010.03.31 Close For history see history tab.

Address common procedure for all domains where the domain keeps the submitting organization informed of progress. Verify process for “public comment” period, esp. for CPs; verify it is properly and appropriately applied to the RTM updates; publish to TC (esp. CP editors Jeff Rinda & Rugh Berge). John Rhoads has reviewed the ITI procedure and provided a modified version for the PCD. Substantial discussion followed and John will update the diagram. Paul asked if there is an appeal process to resolve conflicts. Todd will research the appeal process. 2010.03.17: Ioana has submitted a revision of the process for consideration. June 30, 2010: Close as completed.

Closed Items 90 - 99

Number Action Owner Participants Due Date Status Comments
90 Brief Profile Proposals As Noted See WGs 2009.10.05 Close
  • Summary as of Sept. 9:
- RTLS - Ken will write up Brief Profile Proposal
- MEM - Steve will write up Brief Profile Proposal
- ACM to Enterprise - Monroe will write up Brief Profile Proposal for Extending ACM to Enterprise
- Point of Care ID Management - Khalid, Todd will write up Brief Profile Proposal
- Multi-Parameter Clinical Decision Support Data Integration, Communication and Analysis (MPCDSICA)
- Location Tracking
- Middleware Metrics (Brief Proposal)
- QBD - Query for Bulk Data
Brief Profile Proposals due the 25th, for PCD, ITI. Next week’s PCD PC meeting will include a review of the proposals received.
  • Initial discussion will be held in advance of F2F. Dec. 9, 2009: Close.
91 Making the LOA optional 2009 Dec. 2 Close From F2F: Making the LOA optional without any detail is problematic. The group asked about: what is the rationale for Item 2 and why is section E optional? Patent Disclosure Wiki Page = IHE should modify page to provide link to the disclosure and to segment the page by profile and actor. Take to DCC. Dec. 9, 2009: Close; activity is at Board level.
92 Grouped Actors Manny 2010.05.03 Close F2F: Did Kudu registration permit signing up for DOR as a grouped actor? Dec. 9, 2009: Pending discussion at DCC. June 30, 2010: Close as addressed by removing this as potentially available to PIB. PIB will become a suggestion or reference to PAM, PDQ that are separate and distinct ITI profiles.
93 Managing Document Versions John Rhoads June 25, 2014 CLOSED F2F: research the use of GForge. Feb. 24, 2010: John Rhoads to discuss with Steve Moore. June 30, 2010: John R has received approval to use GForge. Change date to Sept. 30, 2010. April 6, 2011: The next step is to document its usage. Change date to May 31. August 17, 2011: Change date to Oct. 18. Feb. 8, 2012: Change date to April 23. Sept. 5, 2012: John Rhoads will post documentation. Paul suggested a Rosetta for document versions. John Garguilo suggested that groupings of events, terminology might be addressed with OIDs. Paul suggested that a VMD can refer to a strict containment tree, and OIDs for VMDs are available from IEEE if needed. Change date to October 19 and add to F2F agenda. Nov. 12, 2012: Change date to Dec. 31, 2012. Jan. 9, 2013: John Rhoads is working on version control. Change date to April 17. Sept. 4, 2013: John Rhoads suggested coordinating with OID definitions. Change due date to Oct. 9. Nov. 5, 2013 IHE PCD needs a better way to control documents other than placing the most recent version on the FTP site. Todd was going to ask Jungers where IHE was with their investigation of @Git. John R suggested a group form to gather our requirements. January 15, 2014: At IHE publication, will write up a policy procedure. Change due date to Feb 19. Ongoing. Change date to June 25. July 16, 2014: Tree exists, can build on it. CLOSE


94 TF Gaps to Fill Ruth 2009 Nov. 18 Close Ruth will check status of ITI HL7 ACK text for PCD-03. Feb. 24, 2010: Manny to ask Ruth for update.June 30, 2010: Close.
95 ADT Binding for Pumps Ruth, Gary 2009.Nov. 18 Close F2F: See Thursday, Discussion Item 6; added Oct. 14. Close; will be in detailed profile proposal.
96 Add ITI-31 (PAM PCD) to the TF Robert, John Rhoads 2010.03.31 Close November 18: Robert raised the need for ITI-31 for PCD; this will be added to the TF. Robert working on CP. June 30, 2010: Close in favor of Patient Device Association addressing this issue. Open new item to obtain all ADT support required. PAM, PDQ, PEC.

Open new item for PDA with possible interim document.


97

QoS and a QoD (quality of data) issues need to be addressed within the alarm/alert communications

Monroe, Ken

2010.08.30 Closed

Initiated F2F May 3, 2010 afternoon, item 2: (a) build the ability to identify these issues and (b) implement a response. An alert and/or log should be sent/noted when it is needed. May 26, 2010: Monroe has begun work. Initial proposal on how to proceed June 30. June 30, 2010: Change date. April 6, 2010: Close with reference to 60601-8 and its reference to end-to-end delay.

98

Open source solution to archiving persistent data

Ken, Vaughan Zakian 2010.06.30 Closed

Initiated F2F May 3, 2010: Ken and Vaughan will address an open source solution to archiving persistent data. May 26, 2010: Ken will contact Vaughan and report back the end of June. April 6, 2010: Close.

99

Review 2010, Develop 2011 Test Cases

Manny John Garguilo 2010.09.25 Closed

Initiated F2F May 3, 2010: Manny will schedule review of existing test cases and then extensions and new test cases [Complete]. Manny will add device identification and chain of data to the list of potential changes to testing [Comlete]. May 26, 2010: Summer, with a plan in a couple of weeks. June 30, 2010: Reviews have begun, changed due date to end of Aug. Tuesday sessions held [and completed] for DEC, PIV, ACM, and IDCO test case review. Test cases are being revised and reviewed a second time during first 3 weeks of Sept. 2010 April 6, 2011: noted this was closed Oct. 4, 2010.


Closed Items 100 - 109

Number Action Owner Participants Due Date Status Comments
100

CPs: PCD-01, PCD-02, ACM, ACK, ITI-31, RTM, other

2010.06.02 Close

Initiated F2F May: CPs will be submitted, after revisions if necessary. All were supported by those present. Pump WG will address at least two. Monroe will revise ACM TI. Manny to ask John Donnelly to seek vendors to test, implement at Showcase. May 26, 2010: Manny to get CPs out when available. Recruit needed vendors - move to PC. June 30, 2010: Close. Vendor recruiting to be a PC responsibility.

101

Selection of WCTP by ACM

Monroe 2010.06.30 Closed

Initiated F2F May 5, 2010: Todd will seek the MOU for ACM's WCTP.org issue. May 26, 2010: Monroe indicated that WCTP will be used and a CP will be prepared by the WG and submitted to the TC. Todd asked if this will be an option or the single approach. Monroe indicated that both this and SMTP should be accepted and WCTP will be promoted. Todd noted that wired vs. wireless needs to be addressed in the future. CP for ballot and TI available June 30. June 30, 2010: Manny to ping Steve Moore about SMTP and WCTP and learn if it is necessary to lose SMTP. Open Action Item for WCTP MOU (PC). Manny to contact Monroe re ballot for WCTP (TC). The question of whether this is a revised supplement or a CP is to be made by the ACM WG. Monroe and Ken will lead the effort. April 6, 2010: Was closed Sept. 1, 2010.

102

Numeric Array (NA) data type

2010.06.02 Closed

Initiated F2F May 6, 2010: Seek restoration of the Numeric Array (NA) data type. May 26, 2010: Wait to discuss with John Rhoads. Todd noted that HL7 v.7 should go to ballot shortly. The alarm trigger is included. NA could be included in v.2.8. Monroe asked if the TI version of ACM should assume positive ballot on v.7. This should be discussed at the next TC meeting. June 30, 2010: Close because John Garguilo believes this data type can be used. April 6, 2010: Was closed earlier.


103

DPI/ICE-PAC Project

2010.05.26 Close

Initiated F2F May 7, 2010: Define the next steps and enroll vendors to develop this in time for the Connectathon and Showcase. This would include: a technical report, and possibly technical documents such draft supplements for DPI or other. This would be a demonstration testing for a New Directions wall. Philips and Draeger expressed interest. Draft a project plan targeting (a) specification development over the summer, (b) prototyping in the fall / early winter, (c) demonstration testing event, (d) public demonstration during HIMSS '11 (end of February in Orlando). Jon B. offered to recruit vendors & organize. May 26, 2010: Add Todd. Todd developed a Google Group. Rapid Device Configuration (RDC) is the project name. The intent of the item has been met. Close.

104

CDA (HL 7 v.3)

2010.05.26 Close

Initiated F2F May 7, 2010: They will set up meetings and Wiki pages. John Rhoads will poll participants to set a meeting time. May 26: 19.Todd reported that this was discussed in detail in Rio. John will take this forward. The GAS WG (anesthesia) is also working in this area, with effort on a CDA report. Close.

105

Obtain all ADT support required for Connectathon, Showcase

Manny Cochairs August 4, 2010. Closed June 30: Include PAM, PDQ, PEC. April 6, 2010: Close as implemented.
106

PCIM

May 31, 2011. Closed

June 30: Possibly to include interim document. April 6, 2010: Change name to PCI from PDA. Change date. May 2011 F2F, reviewed by TC June 1: Manny and the cochairs of the WG will establish meeting times and Webex support for the PCIM WG. Doodle survey is out. Close as underway.

107 NIST Extensions John Garguilo Sandra Martinez December 8, 2010 CLOSED Wednesday, Oct. 20: NIST Test Agent extension work for all Integration Profiles will be discussed with each WG. Nov 2010, Sandra resolved issues via email with Integration Profile WGs.
108 Prioritize Escalated Alarms Monroe Pattillo ACM WG 2012.04.23 CLOSE Wednesday, Oct. 20: ACM - AC will prioritize alarm and communication when messages are escalated. ACM will add a requirement to notify the person receiving an escalated message that the alarm has been escalated and has an associated delay from the initial alarm. The AC may make decisions on how to prioritize and escalate the message. This may have implications for the AM and perhaps AR. April 6, 2010: Change date to May 31. Feb. 8, 2012: Change date to Change date to April 23. Todd suggested setting a day aside before the F2F. Manny to ballot the F2F dates – Tues-Fri vs Mon-Tues and devote Monday to the alarm work (ACM WG). July 25, 2012: The AR has the ability to raise the priority in the PCD-04 and that will be forwarded in the PCD-06. The updated TI has addressed this. CLOSE as completed.
109 Messages Without Patient Demographics John Rhoads Pump WG Aug 6, 2014 CLOSED Wednesday, Oct. 20: Pumps (and other devices) sending device data in absence of patient demographics. (PIV initiated, to be discussed in Nov. 17th TC meeting). April 6, 2010: Jeff summarized the issue as whether PCD-01 requires patient identity. John Rhoads noted that this is related to PCIM and raises questions about archived data. Change lead to John Rhoads and date to May 4. August 17, 2011: Change date to Oct. 18. Feb. 8, 2012: Change date to April 23, will relate to PCIM. John Rhoads suggested that benefits, risks and risk mitigation should be provided. Change date to October 19 and add to F2F agenda. Manny to let Jeff know. Nov. 12, 2012: John Rhoads to propose a risk management section addressing this issue, considering enterprise, archiving and other elements. This will be balloted. Change responsibility to John Rhoads. Change date to Mar. 13, 2013. Jan. 9, 2013: John Rhoads will put a draft CP on the F2F agenda. Change due date to Oct. 9. January 15, 2014: Change date to April 1, 2014 June 11, 2014: May be contained in Patient ID profile. Change to June 25. July 16, 2014: Tied to PCIM work, reflected in technical framework documents. Change date to Aug 6 September 3, 2014: TF document now allows this exception; the fields have been changed – CLOSE


Closed Items 110-119

Number Action Owner Participants Due Date Status Comments
110
111
112
113 Containment Issue John Rhoads John Garguilo October 18, 2011 Close May 2011 F2F, reviewed by TC June 1: John Rhoads will lead further discussion of the Containment Issue. Due after next HL7 meeting, September 21. August 17, 2011: Change date to Oct. 18. Feb. 8, 2012: This relates to the underlying model and RTM, will be part of volume 3. Close as addressed in volume 3.


114


115 Pump WG CPs Brad Pump WG June 15, 2011 Closed May 2011 F2F, reviewed by TC June 1: Manny asked the Pump WG to consider a CP to add the final step of user approval to initiate infusion to the technical documentation. This was discussed last week in the WG meeting and withdrawn as out of scope. Brad is making some changes to the CPs in development and they will then be balloted. The CPs will be balloted together, soon. August 17, 2011: Close as completed.


116 IDCO CPs Tom, Nick IDCO WG June 29, 2011 CLOSE May 2011 F2F, reviewed by TC June 1: Tom and Nick will move the CPs to have them available for ballot no later than the end of June. Feb. 8, 2012: John Garguilo reported that there are discrepancies between what was tested and what was published. July 25, 2012: Complete. CLOSE


117 IDCO Time Stamp WP Tom, Nick IDCO WG, Paul Nov 6, 2013 CLOSED May 2011 F2F, reviewed by TC June 1: Paul will work with IDCO on the time stamp WP. June 29 for status report. Feb. 8, 2012: Discussion reflected the difficulties and limitations, but there is a desire that IDCO address this. Sept. 5, 2012: Change date to April 1, 2013. Jan. 9, 2013: Manny to ping Paul. Oct. 2, 2013: Change date to Oct. 9. Oct 23: Paul Sc - have good faith UTC mapping. IDCO plans to attend 2015 Connectathon. Manny asked Paul to have IDCO submit a CP to indicate CT compliance. Closed Oct 23
118
119 Newborn Hearing Terminology NOTE: this had been 111; discovered that there were two with this number 8/17/11 Nitin Kunte Paul Schluter, John Garguilo January 5, 2011 Closed Tuesday, Dec. 7, 2010: Discussion to include proposed new terminology in a systematic and consistent way via the RTM Integration Profile. April 6, 2011: Close as implemented.


Closed Items 120-129

Number Action Owner Participants Due Date Status Comments
120
121 ACM ADQ-DDA CP Monroe Pattillo ___ CLOSE F2F Oct. 2011: Submit a CP around the absence of an AA actor and the option to use the proposed ADQ-DDA actor in place of AA. July 25, 2012: This is the actor for archiving data because the archiver actor was removed. John Rhoads suggested this can be a cross reference to another profile. CLOSE as addressed in ADQ.
122 Wiki Page for Local Information John Garguilo September 30, 2012 Close F2F Oct. 2011: Add IHE-PCD Wiki page which provides local information - to include 'local' Trigger Events (labels starting with ^Z01). This page should also include other local IHE-PCD information such as local value sets, error codes, etc. Recommendation was to add this information to the existing OID page for IHE-PCD. Cochairs 11/15/11: Change date to Dec. 9. July 23. 2012: This is for Connectathon usage and for Local Tables that will be in a profile. Change due date to September 30. John Rhoads has added a reference section on the PCD Wiki page to link to these pages. This handy element at http://wiki.ihe.net/index.php?title=Category:PCD_Reference_Pages is available now. Nov. 12, 2012: Completed at October F2F. Close.
123 IPEC Trigger Event and MDCx terms John Garguilo, Jeff Rinda, Todd Cooper John Garguilo, Jeff Rinda, Pump WG July 10, 2013 CLOSED F2F Oct. 2011: IPEC Devise and add a scheme for Trigger Event (while waiting for a future HL7 version [e.g., 2.8, 2.9]. (1) Recommendation to add to OID Wiki page, perhaps with other IHE-PCD local value sets, trigger events, error codes, etc. (Garguilo). (2) (Rinda and team) - capture MDCX terms in what is needed by IEEE - to speed processing/vetting without prolonged waiting. Cochairs 11/15/11: Change date to Dec. 9. July 23. 2012: Change date to September 30. Nov. 12, 2012: Terms have been identified and more will be added. Add Todd as lead. Change date to December 31, 2012. Jan. 9, 2013: Manny to ping Todd. June 18: Would this be a potential F2F topic? Manny to ask Todd. Change date to July 10. Nov 6, 2013: Ck with Todd on MDCx – codes in? If so, close. Trigger – put on a roadmap for April f2f. ACM has it's own trigger. Close when Todd confirms. Change date to Nov 20, 2013. January 15, 2014: Everything but trigger events complete. Closed


124 WCM Recast Ken Fuchs John Rhoads ___ CLOSE F2F Oct. 2011: Restructure Document, consider an Actor Option (note: Option has to do w/ profile - e.g., Waveform option for DEC), add changes identified by the test effort (pointed out in Sandra's slides). If possible, demonstrate this work as part of HIMSS '12 'New Directions area' or within a PCD story - possibility to demo/proof of concept WCM at Connectathon and/or Virtual Connectathon. Manny will investigate new directions area at HIMSS12 (see PC action items). Provide a spreadsheet providing list of waveforms, and research waveform types (John Rhoads). Cochairs 11/15/11: Ken suggested that the use of OBR may address several issues by providing context, providing WCM with a structure similar to ACM. July 25, 2012: Addressed in the Mahwah summit (see notes). CLOSE as complete.


125
126 RTM/RTMMS: Address Missing Descriptions Paul, John Garguilo 10101a Open CLOSED F2F Oct. 2011: Consider a 'project' or plan of how to identify descriptors in IEEE/missing - start with a search in RTMMS? Figure out, develop a roadmap plan and resource plan of how to resolve what is not complete or missing. (A) List of terms - but no other fields (not as trivial as one might think…); (B) Looking down the descriptor field, it's non-normative - and thus thin (start w/ a search). Question from Todd, item assigned to Jan Wittenber with help from Sandra? July 23. 2012: Pending notification from IEEE. Change date to August 22. November 7, 2012: IEEE has agreed to the inclusion of IEEE terms in the tables. Pending IEEE to provide official announcement making this available through RTMMS by the end of November. Change Descriptor to “Descriptions”. Jan. 9, 2013: no due date; open. June 19, 2013: New vent terms completed, 57 others and pump terms in process for 10101a. Add 10101a to the participants. July 10, 2013: Paul Schluter announced today’s meeting will address the recent ISO meeting and acceptance of the ventilator terminology. The WG is working on 10101a including infusion pump terms. There will be an opportunity for last minute additions before submission. Nov 6, 2013: Will be in place by Jan. Close



127 DCM (Detailed Clinical Model for Devices) Ioana __ Closed F2F Oct. 2011: Develop/provide a publication in a form that will be given to IHE-PCD. Cochairs Nov. 22, 2011: Moved to TC Tracking; not an Action Item.
128 Harmonization of Security Considerations Todd __ CLOSE F2F Oct. 2011: Finalize and submit CP - across profiles regarding harmonization of security considerations text. Request more detailed scope from Todd. August 8, 2012: Close as Complete.
129 TF Volume 2 to Include Examples Todd Al Engelbert, Robert Flanders __ CLOSE F2F Oct. 2011: Consider a change to TF Vol II to include examples of containment sequencing. August 8, 2012: Close as Complete.


130

Closed Items 130-139

Number Action Owner Participants Due Date Status Comments


130 TF Vol. 2 Issue John Rhoads Nov. 30, 2011 Closed F2F Oct. 2011: Explore how to (or if) volume 2 needs to explicitly reflect that consumer actors need to gracefully process unknown (but properly formed) data. In other words if a DOC receives WCM OBX’s and doesn’t know how to process them it should continue on and not bomb out. Cochairs Nov. 15, 2011: Moved to TC. August 8, 2012: Close as Complete.
131 Update Technical Framework Ken Fuchs, John Rhoads, Todd Cooper April? Closed January 4, 2012: Update the Final Text after the 2012 N A Connectathon. Completion in time for Public Comment period, publication in time for the 2013 Connectathon process. August 8, 2012: Close as Complete.


132 Conformance Profiles (XML) John Garguilo Robert Flanders October 6, 2013 CLOSED January 4, 2012: Develop Performance Profiles that would be used with tools such as SPY, MWB. August 8, 2012: Conformance Profiles: Name should be Conformance Profiles. John Garguilo indicated that this will provide a more exact language making it easier for implementation and testing, removing ambiguity. He will lead discussion at the F2F, with XML or other source. Change due date to Oct. 16. 'Nov. 7, 2012: Change name to Conformance Profiles; Change date to Jan. 30, 2013. July 10, 2013: John Rhoads summarized the project indicating this is very important. Change the date to the October F2F. Nov 6, 2013: Tooling addresses this need. John G Talked about resources in tutorial – all available. Review next tc, likely close. Change date to Nov 20, 2013. january 15, 2014: Completed, closed


133 - was PC Action Item 138 TF Vol. 2 Issue John Rhoads Nov. 30, 2011 CLOSE F2F Oct. 2011: Explore how to (or if) volume 2 needs to explicitly reflect that consumer actors need to gracefully process unknown (but properly formed) data. In other words if a DOC receives WCM OBX’s and doesn’t know how to process them it should continue on and not bomb out. Cochairs Nov. 15, 2011: Move to TC.
134 DCM Steve Merritt, Manny Furst Close F2F May 16, 2012: Paul suggested that Use Cases help promote participation. He suggested adding elements to PCD-01 as a content module for MEM. Consider a "new directions" demonstration of MEM at HIMSS12 and use it to recruit CMMS and RTLS vendors. Manny to lead recruiting of vendors. Nov. 12, 2012: Move to the PC and notify them: Develop a prioritized list and a group to promote the effort.
135 ACM Recruiting Monroe Monroe, Rob Wilder Nov. 28, 2012 CLOSED F2F May 17, 2012: Bob Porterfield, Monroe and Rob will actively recruit ACs and phone companies. Manny to remind them. August 8, 2012: ACM Recruiting: Monroe is working with a vendor to interest them in ACM. This will be a new market for the company. Nov. 7, 2012: Add Rob Wilder and change date to Nov. 28, 2012. July 10, 2013: Monroe reported that we are in need of AC actors and will welcome additional AM actors. Change date to the October F2F. Nov 6, 2013: Monroe and Jeff discussed. Move out of action item and into roadmap. Closed


136 OPEN
137 PIV: User Approval to Initiate Infusion CLOSED F2F May 18, 2012: Brad to ask the Pump WG to consider a CP to add to the technical documentation: the final step is user approval to initiate infusion. June 20, 2012: Paul suggested making this optional as a workflow item to be considered for documentation. July 10, 2013: Al reviewed this as a potential addition requiring the clinician to review the program before initiating the infusion. John Rhoads suggested that this be incorporated in the TF with a CP. Paul Schluter suggested that in an environment with close clinical supervision there may not be a need for the clinician to “push the button”, such as for an anesthesiologist in the OR or in a closed loop system. He suggested a standardized display which provides safety. Oct 24, 2013, TC and Pump WG deterined that this is no longer an issue (ITEM CLOSED)


138 Containment John Rhoads Close F2F May 18, 2012: John Rhoads will lead further discussion of the device, alarm, event Containment issue. June 20, 2012: This is in process. August 8, 2012: Close as complete (accomplished in Volume 2).
139 HL7 v.2.8 Change Monroe October 16, 2012 Closed HL7 v.2.8 Change. August 8, 2012: Monroe reported that HL7 has a ballot that changes a field from CWE to original text. This has implications for ACM. Nov. 7, 2012: Will proceed with existing this cycle. If the standard changes ACM will adjust. Close.



Closed Items 140-149

No. Action Item Owner Participants Due Open/Closed Description/Update
140 OPEN
141 OPEN
142 Create a template for Security and Privacy John Rhoads, John Garguilo, Todd, Axel? March 1, 2013 Closed Oct. F2F 2012: Create a template for Profile Authors for Security and Privacy (as part of a resource page) – John Rhoads noted that this would be PCD specific (as there are differing views from other domains). July 10, 2013: Closed as complete.
143 OPEN


144 Rosetta Events and Alarms Paul, Monroe 1/26/2013 Closed Oct. F2F 2012: Capture 11073 semantics for events and alarms and their phases and content models. July 10, 2013: Close as underway
145 Anatomy of an Event or Alarm Paul, Monroe 12/30/2012 Closed Oct. F2F 2012: Provide Paul feedback on his Event and Alarm Identifiers proposal. Paul created two examples -to compare two approaches of events sent as a phase vs. event, “numeric” and “named” alarm. July 10, 2013: Close as underway


146 VA Participation in Connectathon, Showcase Greg, Ioana Manny July 24, 2013 CLOSED Oct. F2F 2012: Manny will identify people for the VA to talk with. They are looking at 2014; prepare for this. July 10, 2013: Manny to ping Ioana. Nov 20, 2014: VA working on participation. Close
147 Edit IPEC Todd July 2014 CLOSED Oct. F2F 2012: Todd described the ability of IPEC to inform Event Communication and the Device Specialization Infusion Pump. Todd will edit the IPEC TI version to include the approved CPs and provide it to Mary to publish. Nov 20, 2014: Will need to check with Todd Cooper (Paul Sherman will contact) - Paul contacted Todd; Some IPEC work went out as a CP, but Todd is unsure if this is part of it; he will check his notes. Change date to Dec 3, 2013. Feb 19, 2014: Ping Todd for comment or plan. change date to March 5, 2014. June 25, 2014: Todd sent some information to John Garguilo. May be obsolete. John will contact Todd to confirm work is done. Change date to July TC meeting. July 16, 2014: Many recent updates to IPEC, issues addressed. CLOSE
148 Document ACM in an Implementation Guide Steve Merritt, Monroe April 2014 CLOSED Oct. F2F 2012: Not yet in TF FT. PCD-05 still in. Coordination with Pump WG produced change in PCD-05 to R42 from R41. Other elements have been updated as well. Document in the user's guide from the purchaser's perspective. July 10, 2013: Monroe noted that HIMSS published the Interoperability for Dummies Guide and that IHE and PCD needs to promote to purchasing managers. Nov 20, 2013: Need to get info to purchasing staff, Change due date to April 2014Feb 19, 2014: Presentation at AAMI for purchasing. Change title to Update cookbook to include ACM implementation and move to PC CLOSED.


149 POI NIST Tests Ioana, John Garguilo 11/16/2012 CLOSED Oct. F2F 2012: Ioana described questions for the participating systems regarding implementation questions. John Garguilo proposed four simple tests. John and Ioana to establish this cycle's tests. August 21, 2013: Test updated and loaded in tooling. Close as completed


Closed Items 150-159

No. Action Item Owner Participants Due Open/Closed Description/Update
150 OPEN
151 Supportive Testing Manny 11/9/2012 CLOSED Oct. F2F 2012: Follow up with Jim St Clair re supportive testing. August 21, 2013: Change due date to August 28, 2013 Nov 20, 2013: Close.
152 Improve FTP Site John Rhoads Plannng Committee July 2014 CLOSED for TC Oct. F2F 2012: Develop document indicating where new documents should go on the ftp site. Consider finding a way to improve navigation to old documents. John Rhoads indicated there’s a Wiki page providing guidance. August 21, 2013: Change due date to Sept 4, 2013. Feb 19, 2014: Change date to April F2F June 25, 2014: Jeff McGeath has it in a visual format, requested PC meeting time. Move to PC Action Items and put on agenda.
153 OID Concept Definition (Also see #82) John Garguilo John Rhoads April 2014 CLOSED Dec. 5, 2012: OID structure (and Wiki page): Transaction vs. Interaction levels. Should the OID be defined to the Interaction Level? Where should this be documented (e.g., TF volume 2)? August 21, 2013: Reviewed, leave open Feb 19, 2014: have OID structure, haven't registered the tree. Change date to April F2F June 25, 2014: OID root registered through ISO. Wiki page OIDs will be registered. John Rhoads – once root is registered, ISO delegates subs to registrant. Wiki publication likely works as registration. Scope is likely within IHE. Nothing else may need done. John Garguilo will note on Wiki that this is a controlled site, need access to edit. Close.



154 CPs Resulting From the Connectathon John Garguilo John Rhoads April 17, 2013 CLOSED Feb. 20, 2013: Develop CPs resulting from the Connectathon process. John Garguilo encouraged review of supplements that may be included in the TF. He recommended setting a portion of the F2F aside for discussion of the CPs. CPs should be available early in the cycles. August 21, 2013: Closed
155 Propose Automating Connectathon Documentation Richard Lane Darryl Mellot April 17, 2013 CLOSED Feb. 20, 2013: Documentation should be automated; cutting and pasting into Gazelle and the NIST tool was time consuming and potentially error prone. He noted that this would also contribute to the certification process. John Rhoads suggested that PCD discuss the technical issues in depth and prepare a recommendation for the Connectathon leadership. Monroe added that not all messages will be HL7 (e.g., WTCP and IEEE) so the solution should take this into account. August 21, 2013: Change due date to Sept 4, 2013 Item completed with Gazelle proxy service. Close


156 Change ACM to Alert Communication Management Monroe May 22, 2013 CLOSED Spring 2013 F2F: CP to change the names, etc. of the ACM profile to Alert Communication Management with the messages intended for human response (various priorities) to include physiological and technical alarms and advisories (cf alarms) consistent with 11073. May 1: Will be completed this week with pie chart replacing Venn diagram.August 21, 2013 - closed


157 OPEN
158 OPEN


159 OPEN


Closed Items 160-169

No. Action Item Owner Participants Due Open/Closed Description/Update
160 CPs from F2F: Discuss and Ballot CP Editors See Email to Editors CLOSED Spring 2013 F2F:
(1) Header ACK Submitted by Chris: John Rhoads offered to research the source of the existing requirement in PCD-01. This will be added to a TC agenda and processed accordingly. PCD will seek consistency with PCD-03’s use of ACKs.
(2) Time Zone: Bob and Monroe will prepare the CP to require Time Zone when a time stamp is provided.
(3) Support PCA Device programming in PIV.
(4) Support programming an infusion rate or dose change in PIV.

August 21, 2013: Change to agenda item for fall face to face. July 16, 2014: Items 3 and 4 done, 2 overcome by events, 1 has had a couple of CPs to address. CLOSE.

161 Connectathon Loss of Connectivity Test Manny PCD Connectathon and Showcase WG August 6, 2013 CLOSED Spring 2013 F2F: Manny will add the aluminum foil test (optional) in this cycle. August 21, 2013: Change due date to Sep 4, 2013 July 23, 2014: issue resolved, CLOSE
162 Data Capture Indicator Manny May 22, 2013 CLOSED Spring 2013 F2F: Ask the EHR vendors about the current state of affairs. Manny to poll EHR and Interface vendors to learn what is in place. Lab data is likely processed with this in mind. This is not an immediate priority item for solution. August 21, 2013: Change due date to Sept 4, 2013 July 23, 2014: Paul Sherman will ping Manny, uncertain of meaning. Close
163 Error Codes Jeff Rinda, Todd ? CLOSED Spring 2013 F2F: Should Profiles Include Error Codes? Refer to Pump WG (Jeff and Todd) to ask if there is a reason to retain the existing codes or to handle other than MSA, as alarms. May 1: The general solution will be captured in Rosetta; pump specific items in the ACK referred to the Pump WG in the existing implementation. The Pump WG may wish to add alerts. The goal is consistency and unification between all, using the same values for alarms, alerts. August 21, 2013: Leave open no changes Error test table is on ftp, this may have been an effort to expand to other profiles. Al; recommend relabeling for more than pumps. Monroe – this is mostly part of ACM, except for error noticification, close it. Close
164 Increase Testing Rigor Manny, Paul Sherman PCD Connectathon and Showcase WG August 6, 2013 CLOSED Spring 2013 F2F: Richard Lane noted we don’t test all mandatory items in a profile. Connectathon test should indicate what optional and mandatory elements are tested. West Health is working to automate testing, logging and that will make more time available and provide other benefits. This could be applied to the Virtual Connectathon as well. The Virtual Connectathon is optional and even the Pre-Connectathon (NIST) testing was on the honor system. John Rhoads added that Virtual Connectathons multiple times a year would be beneficial and that traceability to the profile (i.e., this part of the test is based upon this part of the profile) is desirable. August 21, 2013: Change due date to October 2, 2013 Seems more philosophical than an actual action item. Monroe; too broad, close and create a new action item for specific items. Burden is on NIST tools. Close
165 Traceability of NIST test tool and the TF/Profile John Garguilo May 22, 2013 CLOSED Spring 2013 F2F: Research the traceability between the NIST test tool and the TF/Profile.July 23, 2014: Monroe; a major effort for PCD to apply to all tests. Jeff McGeath; a continuous improvement effort, do we need this as a reminder? Not specific. Change ownership to John Garguilo for comment and closure. July 23, 2014: Per John, process underway - close
166 Enhancing Pre-Connectathon Testing Richard and John Garguilo May 10, 2013 CLOSED Spring 2013 F2F: Various components.July 23, 2014; Have John G update and close. July 23, Per John, Pre-C testing being improved, ongoing process, close
167 Versioning and Archiving Jeff McGeath, Paul Sherman OPEN
168 Documentation and Testing of Additional Risks Todd, John Rhoads May 10, 2013 CLOSED Spring 2013 F2F: Monroe recommended that the broader issue of managing risks other than Cybersecurity be brought to the DCC. John Rhoads added that the discussion include reference to risk analysis. Todd indicated that the ITI Security Cookbook is the place where risk management is addressed. There is a clause providing a location to address issues other than security and suggested that John Moerke would be a useful resource. He added that a separate section in the TF would be appropriate. Todd and John Rhoads will initiate a discussion with John Moerke at the Atlanta meeting. July 23, 2014: Does not need to be a TC action item Close
169 Improving Integration Statements Todd, Steve Merritt Aug 6, 2014 CLOSED Spring 2013 F2F: Seek to increase requirements for the IHE DCC lntegration Statement to include mandatory fields; and to address various levels of testing and utilization (e.g., certification). The product registry may lead to a listing of commercially available systems. May 1: Ask Steve to kick off proposal preparation and form tiger team. Richard Lane: Need to consider having participant’s indicate their successful testing of ‘Optional’ or ‘Conditional’ test cases during the Connectathon. This would help support future certification. More importantly, it may assist future purchasers of IHE compliant products in determining if the product is capable of meeting their actual functionality and feature needs. John Rhoads recommended the TC prepare a specific proposal for the DCC. Steve Merritt will be added to initiate the effort. Certification and other elements are involved in the resolution if the IS is to provide all that may be desired. July 23, 2014: Monroe will discuss certification and commercial products at next DCC call. Postpone until after next DCC call. Change date to Aug 6. Sept 24, 2014: Discussed at DCC. iscussed at DCC. We can continue with our list, but include a link to IHE's general list. Change date to F2F. Close in TC and move to PC


Closed Items 170-179

No. Action Item Owner Participants Due Open/Closed Description/Update
170 OPEN
171 OPEN
172 Update Domain CoChair Committee 2014 calendar Manny Furst CLOSED IHE 2014 Publication Schedule; PCD to update Domain CoChair Committee 2014 calendar August 6, 2014: All due dates met to current date. CLOSE
173 Stakeholder Survey Barrett Barrett, Manny CLOSED Stakeholder Survey; Barrett will finalize and send the PC and TC for final review. August 6, 2014: Still applicable? Move to Planning, ping Barrett, Monroe will own. Due date Oct 15. CLOSED for TC
174 OPEN
175 OPEN
176 FHIR device profile Manny PC and TC Oct 10, 2013 CLOSED TC will edit profile support ballot at F2F, submit for vote, and get it out. Manny will send to field (Wed) for balloting Thursday. Ballot finalized sent and apporoved
177 Location Services trial implementation Monroe CLOSED Develop Location Services trial implementation (draft, ballot, etc.), that could focus on equipment and people. August 6, 2014: Completed, Close.
178 OPEN


179 OPEN


Closed Items 180-189

No. Action Item Owner Participants Due Open/Closed Description/Update
180 PCD vignette for Innovation Center Monroe John Paganini, PCD June 11, 2014 CLOSED April 4, 2014: Monroe to contact Elliot. May 14, 2014: John G. will ask Elliot what Innovation Center vignettes are wanted. PCD vignette expectations need to be understood. Results from Innovation Center discussions will influence. Possible discussion with Cleveland Clinic. Add John Paganini and PCD as participants. Elliot could speak to expectations. May be broken into multiple action items later. Close here and move to PC Action Item. Change due date to June 11.
181 Increase notification of intellectual property policy Paul Sherman Manny June 18, 2014 CLOSED April 4, 2014: Paul will contact HIMSS staff. June 14. 2014: Manny took it up with Chris Carr, no response; will try again. Several components to help ensure participants are aware. Change due date to June 18. August 6, 2014 this is primarily a Planning issue. Close here and move to Planning, Change date to September.
182 OPEN
183 OPEN


184 OPEN
185 White paper on PCIM-DEC series to address unknown/no patient challenges John Rhoads October 22, 2014 CLOSED April 4, 2014: August 6, 2014: Work underway, plan to deliver a version at fall F2F. Set due date to Oct 22. Close, passed to PCIM WG.
186 OPEN
187 Wiki page updates: Cochairs address cross group pages Jeff McGeath October 21, 2014 CLOSED April 4, 2014: WGs address their specific wiki pages. Announce at PC and TC calls and add to respective Action Item lists. August 6, 2014: Set date to August 20. October 1, 2014: Getting in alignment with other domains. All domains are to contain certain content. Wiki pages need to be brought up to date. Monroe updated the OID page, the date page is current, a number need updated. Tag appropriate pages for coordinated work. Will add an agenda item to Co-Chair to review a page per meeting. Change date to F2F. October 15, 2014: Close here and add to co-chair agenda.
188 CP to require EUI-64 for production systems Jeff McGeath CLOSED April 4, 2014: Also include comments that a system under test can use a EUI-64 or a URN. Get rid of references to DNS (hostnames). August 6, 2014: Believe this has been addressed in Volume 2 documentation Closed.