PCD Technical Committee Action Items

From IHE Wiki
Revision as of 19:10, 10 July 2010 by Efurst (talk | contribs) (→‎Items 80-89: move 87, 89 to closed page)
Jump to navigation Jump to search

See also PCD Technical Committee Closed Action Items page.

To see changes between current and last(or any earlier) versions of the action item list, click the history tab at the top of the page, select versions to compare and click compare command.

Significant recent changes, other than dates, will be in bold.

Items 60 - 69

Number Action Owner Participants Due Date Status Comments
60 Update TF Todd, Ken John Rhoads 2010.09.15 OPEN Previous history is available on this Wiki (see history tab).

The update will include PIB, SPD. Todd will ask the IHE Cochairs if the format must be changed to the new format or can be left as is. A format change to the TF is anticipated. This would place the boiler plate into volume 0. Manny to develop the essential elements of the Integration Statements and check to see if the requirement for PCD-01 from the DOR to the DOF is clearly written. Robert is leading a group addressing the issues with PAM ITI-30 and 31. Paul noted that web services will provide additional benefits such as security. The profile updates to HL7 v 2.6 will be folded in. Dec. 9, 2009: Change date to Dec. 18. John Garguilo noted Bikram’s observation about OBR field lengths. He recommended discussion and decision, perhaps using RE for those not used. Paul noted that there will be CPs coming out of coordination with Continua. Feb. 24, 2010: Updating TF is in progress, addressing non-controversial items. A draft of Volume 2 will be available shortly. Volume 3, delayed, will contain much of what was in Volume 2. CPs for Continua harmonization will be incorporated before the revised TF is issued for ballot. June 30, 2010: Change date to Sept. 15.

66.1 Integration Profile Registration (w/ OID Defs) John Garguilo Al Engelbert, Todd Cooper, Robert Flanders. 2010.07.31 OPEN Previous history is available on this Wiki (see history tab).

PCD likely won’t finalize the application until the TF has been updated and following the public comment period. Todd set up Google Group and Wiki Page to establish a baseline. The PCD will work with NIST for validation. It is anticipated that the other PCD transactions shall be registered after PCD-01 is complete. John Garguilo has requested that companies post their profiles at: PCD Year 3 Pre-Connectathon Testing FTP Site. Profiles will be maintained on ftp site. NIST can maintain these under the profile directories. Gary volunteered to develop and maintain MWB profiles for three profiles, including tables (data type and others) are available for future use. Volunteers were requested for the other profiles (ACM PCD-04 through 08). Monroe indicated that only PCD-04 would be stable now. Gary will pick up PCD-04 as well. Manny will talk with Nick regarding IDCO.Gary is maintaining MWB profiles and NIST is developing their profiles. Gary noted that the MWB permits building the message, while that is not available in the NIST tools. John Garguilo noted that the MWB also provides a receiving system for testing. June 30, 2010: John Garguilo will develop a process for branching from the OID and it will become part of NIST Tooling, with each profile having a leaf. Changed date.

66.2 Implementation Conformance Profile Support John Garguilo Al Engelbert, Todd Cooper, Robert Flanders. 2010.07.31 OPEN Previous history is available on this Wiki (see history tab).

PCD likely won’t finalize the application until the TF has been updated and following the public comment period. Todd set up Google Group and Wiki Page to establish a baseline. The PCD will work with NIST for validation. It is anticipated that the other PCD transactions shall be registered after PCD-01 is complete. John Garguilo has requested that companies post their profiles at: PCD Year 3 Pre-Connectathon Testing FTP Site. Profiles will be maintained on ftp site. NIST can maintain these under the profile directories. Gary volunteered to develop and maintain MWB profiles for three profiles, including tables (data type and others) are available for future use. Volunteers were requested for the other profiles (ACM PCD-04 through 08). Monroe indicated that only PCD-04 would be stable now. Gary will pick up PCD-04 as well. Manny will talk with Nick regarding IDCO.Gary is maintaining MWB profiles and NIST is developing their profiles. Gary noted that the MWB permits building the message, while that is not available in the NIST tools. June 30, 2010: John Garguilo noted that the MWB also provides a receiving system for testing. Changed date.

Items 70-79

Number Action Owner Participants Due Date Status Comments


Items 80-89

Number Action Owner Participants Due Date Status Comments


82 PCD OIDs & URNs Todd, John Rhoads 2010.02.04 OPEN For history see history tab.

There is an IHE PCD OID page. The IHE Domain Coordination Committee has had a very active discussion re. the management of OIDs within IHE. OIDs will be available when needed. Dec. 9, 2009: Robert reported no news; change to Feb. 4.June 30, 2010: John Garguilo will integrate 66.1 and 82.

83 MOUs Sandy Ken 2010.05.03 OPEN Follow up MOU status with CIMIT, ASTM. Ken reported that Julian presented this to the ASTM. John Garguilo reported they had a meeting with the FDA and updated them on NIST tools and their work with PCD. June 30, 2010: Move to PC.

Items 90-99

Number Action Owner Participants Due Date Status Comments


92 Grouped Actors Manny 2010.05.03 Close F2F: Did Kudu registration permit signing up for DOR as a grouped actor? Dec. 9, 2009: Pending discussion at DCC. June 30, 2010: Close as addressed by removing this as potentially available to PIB. PIB will become a suggestion or reference to PAM, PDQ that are separate and distinct ITI profiles.
93 Managing Document Versions John Rhoads 2010.09.30 OPEN F2F: research the use of GForge. Feb. 24, 2010: John Rhoads to discuss with Steve Moore. June 30, 2010: John R has received approval to use GForge. Change date to Sept. 30, 2010.
94 TF Gaps to Fill Ruth 2009 Nov. 18 OPEN Ruth will check status of ITI HL7 ACK text for PCD-03. Feb. 24, 2010: Manny to ask Ruth for update.June 30, 2010: Close.
96 Add ITI-31 (PAM PCD) to the TF Robert, John Rhoads 2010.03.31 Close November 18: Robert raised the need for ITI-31 for PCD; this will be added to the TF. Robert working on CP. June 30, 2010: Close in favor of Patient Device Association addressing this issue. Open new item to obtain all ADT support required. PAM, PDQ, PEC.

Open new item for PDA with possible interim document.

97

QoS and a QoD (quality of data) issues need to be addressed within the alarm/alert communications

Monroe, Ken

2010.08.30 OPEN

Initiated F2F May 3, 2010 afternoon, item 2: (a) build the ability to identify these issues and (b) implement a response. An alert and/or log should be sent/noted when it is needed. May 26, 2010: Monroe has begun work. Initial proposal on how to proceed June 30. June 30, 2010: Change date.

98

Open source solution to archiving persistent data

Ken, Vaughan Zakian 2010.06.30 OPEN

Initiated F2F May 3, 2010: Ken and Vaughan will address an open source solution to archiving persistent data. May 26, 2010: Ken will contact Vaughan and report back the end of June.

99

Review 2010, Develop 2011 Test Cases

Manny John Garguilo 2010.06.16 OPEN

Initiated F2F May 3, 2010: Manny will schedule review of existing test cases and then extensions and new test cases. Manny will add device identification and chain of data to the list of potential changes to testing. May 26, 2010: Summer, with a plan in a couple of weeks.June 30, 2010: Reviews have begun, change date to end of Aug.


Items 100-109

Number Action Owner Participants Due Date Status Comments


100

CPs: PCD-01, PCD-02, ACM, ACK, ITI-31, RTM, other

2010.06.02 Close

Initiated F2F May: CPs will be submitted, after revisions if necessary. All were supported by those present. Pump WG will address at least two. Monroe will revise ACM TI. Manny to ask John Donnelly to seek vendors to test, implement at Showcase. May 26, 2010: Manny to get CPs out when available. Recruit needed vendors - move to PC. June 30, 2010: Close. Vendor recruiting to be a PC responsibility.

101

Selection of WCTP by ACM

Monroe 2010.06.30 OPEN

Initiated F2F May 5, 2010: Todd will seek the MOU for ACM's WCTP.org issue. May 26, 2010: Monroe indicated that WCTP will be used and a CP will be prepared by the WG and submitted to the TC. Todd asked if this will be an option or the single approach. Monroe indicated that both this and SMTP should be accepted and WCTP will be promoted. Todd noted that wired vs. wireless needs to be addressed in the future. CP for ballot and TI available June 30. June 30, 2010: Manny to ping Steve Moore about SMTP and WCTP and learn if it is necessary to lose SMTP. Open Action Item for WCTP MOU (PC). Manny to contact Monroe re ballot for WCTP (TC). The question of whether this is a revised supplement or a CP is to be made by the ACM WG. Monroe and Ken will lead the effort.

102

Numeric Array (NA) data type

2010.06.02 OPEN

Initiated F2F May 6, 2010: Seek restoration of the Numeric Array (NA) data type. May 26, 2010: Wait to discuss with John Rhoads. Todd noted that HL7 v.7 should go to ballot shortly. The alarm trigger is included. NA could be included in v.2.8. Monroe asked if the TI version of ACM should assume positive ballot on v.7. This should be discussed at the next TC meeting. June 30, 2010: Close because John Garguilo believes this data type can be used.

103

DPI/ICE-PAC Project

2010.05.26 Close

Initiated F2F May 7, 2010: Define the next steps and enroll vendors to develop this in time for the Connectathon and Showcase. This would include: a technical report, and possibly technical documents such draft supplements for DPI or other. This would be a demonstration testing for a New Directions wall. Philips and Draeger expressed interest. Draft a project plan targeting (a) specification development over the summer, (b) prototyping in the fall / early winter, (c) demonstration testing event, (d) public demonstration during HIMSS '11 (end of February in Orlando). Jon B. offered to recruit vendors & organize. May 26, 2010: Add Todd. Todd developed a Google Group. Rapid Device Configuration (RDC) is the project name. The intent of the item has been met. Close.

104

CDA (HL 7 v.3)

2010.05.26 Close

Initiated F2F May 7, 2010: They will set up meetings and Wiki pages. John Rhoads will poll participants to set a meeting time. May 26: 19.Todd reported that this was discussed in detail in Rio. John will take this forward. The GAS WG (anesthesia) is also working in this area, with effort on a CDA report. Close.

105

Obtain all ADT support required for Connectathon, Showcase

Manny Cochairs August 4, 2010. OPEN June 30: Include PAM, PDQ, PEC.
106

PDA

August 30, 2010. OPEN

June 30: Possibly to include interim document.


107 2010. OPEN
108 2010. OPEN
109 2010. OPEN


Items 110-119

Number Action Owner Participants Due Date Status Comments
110 OPEN
111 OPEN
112 OPEN
113 OPEN
114 OPEN


115 OPEN
116 OPEN
117 OPEN
118 OPEN
119 OPEN



Links to PCD TC Meetings

Go to most recent/past meetings or next meeting Category: PCD Meeting

Patient Care Device home