Line 15: Line 15:
 
==Items 100-109 are closed==
 
==Items 100-109 are closed==
  
==Items 110-119==
+
==Items 110-119 are closed==
 
 
:{|border="2"
 
|-
 
! width="5%"  align="center" |Number
 
! width="15%"  align="left"  |Action
 
! width="5%"  align="left"  |Owner
 
! width="15%"  align="left"  |Participants
 
! width="5%"  align="left"  |Due Date
 
! width="5%"  align="left"  |Status
 
!              align="left"  |Comments
 
 
 
|-
 
| align="center" | 110
 
| '''<Action Item>''' | WCM Attributes
 
| '''<Owner>:'''  | Paul Schluter
 
| '''<Participants>''' | Ken Fuchs
 
| '''<Due Date>'''  | Oct 21, 2014
 
| '''<Status>''' |OPEN
 
| '''<Comments>:'''  | Thursday, Oct. 21: Document ways of representing waveform attributes. Ken suggested similar action for PCD-02. To be discussed Nov 3rd TC meeting. April 6, 2011: Change date to May 11. Add to agenda for the F2F. May 2011 F2F, reviewed by TC June 1: RTM and IEEE, HL7 for WCM: Paul and Ken took the WCM parameter list to the recent IEEE meeting to seek codes for those attributes currently lacking definition, but this was not addressed. This will be an ongoing effort. Some will need to be maintained as Rosetta and not IEEE terms. John Garguilo noted that terminology life cycles were discussed at the IEEE meeting. It was documented and is available from John. Some new terms begin within the RTM, having term codes of zero and then are submitted to the IEEE. Due June 29 for RTM, September 1 for IEEE. July 23, 2012: Paul indicated that this has been incorporated in the new document. Minor changes and corrections are anticipated. It will be shared with Continua and with the IEEE in September. Sept. 5, 2012: Paul noted that Continua will be implementing more waveforms and something may come from that to help move this forward. Change date to April 1, 2013. Oct. 2, 2013: Change date to Oct. 9. Oct 22, change date to Nov 6  Nov 6 2013:  Need numeric codes – Ref ID's are ready. Pefer Jan provide numeric codes. Change date to Nov 20, 2013  January 15, 2014:  Change due date to Feb 19  June 11, 2014: Tables there, mostly need to pull trigger, tied to 10101a.  Change to July 2.  July 16, 2014:  Change date to Aug 6  Sept 3, 2014:  No new input so far, may delay until 10101b, have some existing work.  If we want to move forward, suggest looking at WCM document.  Chris will follow up with EPIC to provide info.  Change date to F2F.'''  September 24, 2014: Chris will call into the F2F meeting to update.  There may need to be a meeting on this at the F2F, some discussion of who would participate. Chris will work on this.'''
 
 
 
|-
 
| align="center" | 118
 
| '''<Action Item>''' | Implementation Guide
 
| '''<Owner>:'''  | John Garguilo
 
| '''<Participants>''' |
 
| '''<Due Date>'''  | Oct 22, 2014
 
| '''<Status>''' |OPEN
 
| '''<Comments>:'''  | May 2011 F2F, reviewed by TC June 1: John Garguilo will provide a first draft of the Implementation Guide and vendors will be essential contributors. Sept. 5, 2012: Change date to October 19, 2012. Nov. 12, 2012: Change date to March 13, 2013.  Jan. 9, 2013: John Garguilo reported Sandra will look at POI supplement as an initial PCD example. John Rhoads noted that an implantation guide is very different than specifications found in the TF. Add Sandra. An example will be provided at the F2F. Change date to April 17. Oct 22, Discussion of progress and planned progress, plan on webex for users in November.  Nov 6, 2013:  John G – building resources to help implement. Building a guide from the TF, hone in on other items. Will be 2014 Spring f2f Goal – impl gde 0.1 for vol 2.  Change date to December 8  January 15, 2014:  Still working on PCD-01 walk through. Change date to March 26  June 11, 2014: Build a base implementation guide to follow TF.  Change date to Sept 24'''  John Garguilo - hope to have first version at F2F.  Change date to F2F.'''
 
 
 
 
 
 
 
|}
 
  
 
==Items 120-129 are Closed==
 
==Items 120-129 are Closed==
Line 57: Line 25:
 
|}
 
|}
  
==Items 130-139==
+
==Items 130-139 are closed==
  
:{|border="2"
+
==Items 140-149 are Closed==
|-
 
! width="5%"  align="center" |Number
 
! width="15%"  align="left"  |Action
 
! width="5%"  align="left"  |Owner
 
! width="15%"  align="left"  |Participants
 
! width="5%"  align="left"  |Due Date
 
! width="5%" align="left"  |Status
 
!              align="left"  |Comments
 
  
|-
+
==Items 150-159 are Closed==
| align="center" | 136
 
| '''<Action Item>''' | WCM Parameter List
 
| '''<Owner>:'''  | Paul Schluter, Ken Fuchs
 
| '''<Participants>''' |
 
| '''<Due Date>'''  | Oct 23, 2014
 
| '''<Status>''' |OPEN
 
| '''<Comments>:'''  | F2F May 18, 2012: Paul and Ken will take the WCM parameter list to the IEEE meeting next week to seek codes for those attributes currently lacking definition. August 8, 2012: WCM Parameter List: In process. July 10, 2013: Ken reported that some attributes remain to be added to 10101. John Rhoads will ask Jan about the status and Paul offered to add them to 10101a if appropriate. Change date to August 7. Nov 6, 2013:  Paul Schluter – John G, please send list of decimal list numbers for Ref ID attributes and scada.  Change date to Nov 20, 2013. Feb 19, 2014: Code assignment should be complete by mid March. Change date to March 5'''  June 11, 2014:  May be some more based on prototype.  WCM needs an owner, none currently available.  Change date to Fall F2F.'''
 
  
 +
==Items 160-169 are Closed==
  
|}
+
==Items 170-179 are Cosed==
  
==Items 140-149==
+
==Items 180-189 are closed==
  
:{|border="2"
+
==Items 190-199==
|-
 
! width="5%"  align="center" |No.
 
! width="15%"  align="left"  |Action Item
 
! width="5%"  align="left"  |Owner
 
! width="5%  align="left"  |Participants
 
! width="10%  align="left"  |Due
 
! width="5%  align="left"  |Open/Closed
 
!              align="left"  |Description/Update
 
 
 
|-
 
| align="center" | 140
 
| '''<Action Item>''' | Assemble the Baseline Set of Standards for Easy Reference
 
| '''<Owner>:'''  | Ioana
 
| '''<Participants>''' | John Rhoads
 
| '''<Due Date>'''  | October 2014
 
| '''<Status>''' |OPEN
 
| '''<Comments>:'''  | Oct. F2F 2012: Assemble the baseline set of standards used by PCD, providing the complete stack or dependency standards/specifications (or pointer to that set). Ioana's suggestion relates to a new user perspective - trying to dive into the specs - what looks deceivingly simple, is not, with layer upon layer. Is this the responsibility of the MDICC?  July 10, 2013: John Rhoads announced that HL7 now makes it possible to view their standards for no cost. Monroe noted that the cost for IEEE standards is prohibitive for new and small organizations. PCD will investigate access to base standards. Add John Rhoads. Manny to ping Ioana.  Nov. 20, 2013:  Change date to April 2014 F2F  Feb 19, 2014:  Change Date to April 2014 F2F. ''' June 25, 2014:  Some information is supplied on Wiki pages, could point others to it. Change date to October F2F. '''
 
 
 
|-
 
| align="center" | 141
 
| '''<Action Item>''' | Create Matrix Matching Profiles to Standards
 
| '''<Owner>:'''  | Ioana
 
| '''<Participants>''' | Ioana
 
| '''<Due Date>'''  | October 2014
 
| '''<Status>''' |OPEN
 
| '''<Comments>:'''  | Oct. F2F 2012: Create matrix, possibly in TF Volume 1 matching profiles to referenced standards. Nov. 20, 2013:  Change date to April 2014 F2F'''  June 25, 2014:  No new information available, a good candidate for F2F discussion.  Change date to October F2F.'''
 
 
 
|-
 
| align="center" | 143
 
| '''<Action Item>''' |  Describe HL7 Version Implications
 
|'''<Owner>:'''  | John Rhoads, John Garguilo, Todd
 
| '''<Participants>''' |
 
| '''<Due Date>'''  | October 2014
 
| '''<Status>''' |OPEN
 
| '''<Comments>:'''  | Oct. F2F 2012: Add reference to the HL7 list providing the per version relevance and analysis. Develop a separate PCD section to identify and document the impact of HL7 version changes. HL7 2.8: Monroe noted that ACM and IPEC are affected by 2.8. Todd noted that IPEC has an interest in 2.9. Todd suggested that there be a section in the TF that identifies version change impacts. July 10, 2013: Change date to October F2F. Nov 20, 2013:  May fall out with implementation guide.  Change date Feb 28, 2014. Change date to April 2014 F2F  June 25, 2014:  No new information, change date to October F2F.'''  July 16, 2014: Not strictly actionable, pointing to next version is preferable. Leave date as October F2F.'''
 
 
 
 
 
|}
 
 
 
==Items 150-159==
 
  
 
:{|border="2"  
 
:{|border="2"  
Line 135: Line 49:
 
!              align="left"  |Description/Update
 
!              align="left"  |Description/Update
  
|-
 
| align="center" | 150
 
| '''<Action Item>''' | Seek null flavors in HL7 2.9
 
| '''<Owner>:'''  | Doug, Ioana
 
| '''<Participants>''' |
 
| '''<Due Date>'''  | Oct 22, 2014
 
| '''<Status>''' |OPEN
 
| '''<Comments>:'''  | Oct. F2F 2012: For PCIM these could indicate the known missing identification. Ioana believes this should be the responsibility of the developer and the TF can specify how to do this. Added by John G: Real issue is legacy device adapters -more of a gap analysis of what device does NOT support. E.g., Declaring conformance to the delta of what is/not provided by PCD-01 -this would be part of the technical specification. Where would this be defined by the developer? August 21, 2013:  Change due date to August 28, 2013.  Nov 20, 2013:  change close date to end of 2013  Feb 19, 2014:  Change date to April F2F  June 25, 2014:  John Rhoads belives Doug Pratt has made good progress.  He will ping Doug on this, change date to end of July.'''  July 16, 2014: Paul Sherman contacted Doug for update, item to remain open.  Change due date to October F2F'''
 
 
|-
 
| align="center" | 157
 
| '''<Action Item>''' | POI Issues
 
| '''<Owner>:'''  | Ioana
 
| '''<Participants>''' |
 
| '''<Due Date>'''  | Oct 22, 2014
 
| '''<Status>''' |OPEN
 
| '''<Comments>:'''  | Spring 2013 F2F: Address issues first with NIST then WG meeting. May 1: Message table structure needs additional columns.  August 21, 2013:  Change due date to Sept 4, 2013  Feb 19, 2014:  Change Date to April F2F  July 16, 2014:  change due date to Aug 6, 2014.'''  Sept 24, 2014: Subset identified, let Ioana know about this, change date to F2F'''
 
 
|-
 
| align="center" | 158
 
| '''<Action Item>''' | POI CPs
 
| '''<Owner>:'''  | Ioana
 
| '''<Participants>''' |
 
| '''<Due Date>'''  | Octo 22, 2014
 
| '''<Status>''' |OPEN
 
| '''<Comments>:'''  | Spring 2013 F2F: Submit planned CPs. August 21, 2013:  Change due date to Sept 4, 2013.  Feb 19, 2014:  Change Date to April F2F  July 16, 2014:  change due date to Aug 6, 2014.'''  Sept 24, 2014: Subset identified, let Ioana know about this, change date to F2F'''
 
  
  
  
 
|-
 
|-
| align="center" | 159
+
| align="center" | 196
| '''<Action Item>''' | POI Rosetta Terms
+
| '''<Action Item>''' | Add PCD specific values to HL7 table 78
| '''<Owner>:'''  | Ioana
+
| '''<Owner>:'''  | John Garguilo
 
| '''<Participants>''' |  
 
| '''<Participants>''' |  
| '''<Due Date>'''  | Oct 22, 2014
+
| '''<Due Date>'''  | Feb 3, 2021
 
| '''<Status>''' |OPEN
 
| '''<Status>''' |OPEN
| '''<Comments>:'''  | Spring 2013 F2F: Provide table of corresponding LOINC and IEEE codesAugust 21, 2013Change due date to Sept 4, 2013 Feb 19, 2014Change Date to April F2F  July 16, 2014:  change due date to Aug 6, 2014.'''  Sept 24, 2014: Subset identified, let Ioana know about this, change date to F2F'''
+
| '''<Comments>:'''  | From 2016 NA Connectathon.  Status is in PCD TF v5 Vol2 page 119 at line 2890, but not in NIST Tool which only supports values from HL7 Table 0078.  We can suggest table changes to HL7, John will take this to HL7.
 
+
April 21, 2016:  Values are in TF.  John will approach HL7 vocab group at their meeting in two weeks.  Anticipates no issue.  If not successful, will add XML table.  Set to PC&TC meeting May 18.
 +
:  May 18, 2016:  Couldn't find the term we wanted to add, please send it to John.  Change date to June 1.  Should be in Vol 2, reference to table 78.  Set to next TC meeting.
 +
:June 1, 2016:  Change to July 6 TC call.
 +
: July 6, 2016: Nothing new, set to next TC meeting.
 +
: Aug 3, 2016:  Nothing new, set to next TC meeting.
 +
: Sep 7, 2016:  Will try to present at HL7, set to Oct PC/TC meeting.  Set to Oct meeting.
 +
:Oct 5, 2016:  Contacted Vocabulary working group, almost done.  Will extend tables with appropriate codes.  A simple add to get the changes put in. Set to F2F.
 +
: Oct 12, 2016: Add PCD specific values to HL7 table 78 – pp61 discusses it, we have values not in HL7.    HL7: write up proposal for them to approve or not.  These are generic enough for other to use them, it is also a way to get some null values in there.  Can we create a local table to address it – Yes.  We will need to do that for the Connectathon.  But was only checked against HL7 table for DEC; need to add a local DEC table.  May want to define a write operation as well.  Targeting HL7 Jan 2017 to have values added to Table 3.9.4.1.2.5-3.  Set due date to Feb TC meeting.
 +
:Feb 1, 2017: Will submit to HL7 vocabulary group.  Will present to May HL7 meeting.  Review May 17th PC and TC.
 +
:May 17, 2017:  Needs some paperwork done and sent, should be done in a monthReview June 21.
 +
:July 12, 2017:  Nothing new.  Review at Aug TC.
 +
:Aug 15, 2017:  No new information, move to Sep meeting.
 +
:Sep 27, 2017:  No update, effort to get these formally into HL7. John will contact Ted Klein at HL7, set to Oct TC.
 +
:Oct 5 2017:  Validated and put in tool.  Contacted Ted Klein, moving forward.  Should be completed Nov 29.  Set to Dec TC.
 +
:Dec 20 2017: John not available, move to Jan TC meeting.
 +
:Jan 3, 2018: No update, move to Feb TC.
 +
:Feb 7, 2018:  John still needs to submit something.  Set to March TC meeting.
 +
:Mar 21, 2018:  No update, move to Apr F2F.
 +
:April 12, 2018:  John not available, move to April PC&TC.
 +
:April 19, 2018:  No update, move to May TC meeting.
 +
: May 2, 2018Work continues, hope to make progress from HL7 meetings.  Set to June TC meeting.
 +
: June 13, 2018:  No new info, move the joint PC&TC meeting.
 +
: June 27, 2018:  John G not available, set to next TC meeting.
 +
: July 25, 2018:  No update yet, set to Sept TC meeting.
 +
: Aug 15, 2018:  John submitted info to Ted Klein, will need to follow up at HL7 meeting.  He can update at F2F.
 +
: Oct 18, 2018: John not available, move to next TC meeting.
 +
: Nov 5, 2018:  No new info, next HL& should provide update. Set to Jan meeting.
 +
: Jan 2, 2019:  NIST unavailable, set to Feb meeting
 +
: Feb 6, 2019: John not here, move to Joint PC/TC
 +
: Mar 6, 2019: John not available, move to F2F
 +
: Apr 25, 2019: John will get it in as soon as he can. Review in June
 +
: June 5, 2019: John not on call, set to July meeting
 +
: July 10, 2019No change, move to August
 +
: Aug 7, 2019: Checks data validity. John not available, move to next month.
 +
: Sep 4, 2019: No update, move to next month.
 +
: Nov 6, 2019:  No update, move to Dec.
 +
: Dec 4, 2019: Review after next HL7 meeting. Move to March.
 +
: March 4, 2020:  John not available, move to April meetings
 +
: April 1, 2020:  May HL7 cancelled, unable to do anything for now, move to September meeting.
 +
: Sept 2, 2020: HL7 meeting this month, move to F2F
 +
: '''Oct 8, 2020: ::- No update.  Move to February.'''
  
  
 
|}
 
|}
  
==Items 160-169==
+
==Items 200 - 209==
 
 
:{|border="2"
 
|-
 
! width="5%"  align="center" |No.
 
! width="15%"  align="left"  |Action Item
 
! width="5%"  align="left"  |Owner
 
! width="5%  align="left"  |Participants
 
! width="10%  align="left"  |Due
 
! width="5%  align="left"  |Open/Closed
 
!              align="left"  |Description/Update
 
  
|-
 
| align="center" | 167
 
| '''<Action Item>''' | Versioning and Archiving
 
| '''<Owner>:'''  | Jeff McGeath, Paul Sherman
 
| '''<Participants>''' |
 
| '''<Due Date>'''  | Oct 22, 2014
 
| '''<Status>''' |OPEN
 
| '''<Comments>:'''  | Spring 2013 F2F: John Garguilo will follow up on versioning at the HL7/IEEE meeting in Atlanta.  John Rhoads suggested that the TC look at archival records in general July 24, 2014:  Started work at spring 2014 for Github versioning.  Need to review ftp info to migrate to versioning and which items to version.  Discuss at PC.  Change owner to Jeff M, Paul Sh and change due date to end of August'''  Sept 24, 2014:  Change date to F2F.'''
 
 
 
 
|}
 
 
==Items 170-179==
 
  
 
:{|border="2"  
 
:{|border="2"  
 
|-
 
|-
! width="5%"  align="center" |No.
+
! width="5%"  align="center" |Number
! width="15%"  align="left"  |Action Item
+
! width="15%"  align="left"  |Action
 
! width="5%"  align="left"  |Owner
 
! width="5%"  align="left"  |Owner
! width="5%   align="left"  |Participants
+
! width="15%align="left"  |Participants
! width="10%   align="left"  |Due
+
! width="5%align="left"  |Due Date
! width="5%   align="left"  |Open/Closed
+
! width="5%align="left"  |Status
!              align="left"  |Description/Update
+
!              align="left"  |Comments
  
 
|-
 
|-
| align="center" | 170
+
| align="center" | 200
| '''<Action Item>''' | Convert IPEC to EC
+
| '''<Action Item>''' | MDS and VMD Requirements
| '''<Owner>:'''  | Todd Cooper
+
| '''<Owners>:'''  | Paul Schluter
 
| '''<Participants>''' |  
 
| '''<Participants>''' |  
| '''<Due Date>'''  | Oct 8, 2014
+
| '''<Due Date>'''  | Feb 3, 2021
| '''<Status>''' |OPEN
+
| '''<Status>''' | Open
| '''<Comments>:'''  | Spring 2013 F2F: CP to change the name and provide additional changes to convert IPEC to EC. To be completed in time to submit for ballot and TI.'''August 6, 2014: Change due date to October 8, 2014'''
+
| '''<Comments>:'''  | June 27, 2018:  Created.  Need to make consistent, so they can be applied uniformly by NIST tool.  Set to next TC meeting
|-
+
: July 25, 2018: No update yet, move to F2F TC meeting.
| align="center" | 171
+
: Oct 18, 2018: Loose, not tested by NIST tools. Required disclosure at CMI. Need to assemble ‘uber’ models. How rigorous. Part may include retrofitting specificity in TF. May need general x-type path. May be able to use a tool like FHIR’s to create the containment models. Also want to clearly state what containment is. Discussed options and current process with some examples. Need to work out wrinkles for multiple devices doing the same thing. Need to solve persistence issue. Example: BP monitoring channels, when expanding channels, need to ensure the original maintains its channel number. Discussed different IV pump models as well as monitoring. Found a challenge with ACM; Alarms and other messages. If the alarm is in the first message, then another message is generated with another field completed, the alarm may not be at the same location in the message. Oliver will draft a White Paper to address MDS, persistence and channel identification, what works, doesn’t work and mine fields. He has a lot of notes already. Will review Dec TC meeting.
| '''<Action Item>''' |  Put list of workgroup leaders on PCD wiki.
+
:Dec 19, 2018 - Using it, NIST working on it. Until 10101r is out the door, won’t be able to focus on it.  Not sure next stage of ‘done’ is. Push out to February, and discuss at DPI meetings.
|'''<Owner>:''' | Paul Sherman
+
: Feb 6, 2019: Nothing right now, move to next TC.
| '''<Participants>''' | Paul Sherman, Manny
+
: Mar 6, 2019: Should be able to start on it again soon. Review next PC&TC
| '''<Due Date>'''  | Sept 3, 2014
+
: Mar 20, 2019:  No new info, could use a ½ hour discussion at F2F. Set to F2F
| '''<Status>''' |OPEN
+
: Apr 25, 2019Related to the OBX-4 question, need to figure out what to do. It is a ‘should’, do we make it a ‘shall’? If so, we need to let implementer know well before Connectathon. Include Lexicographic order. Move out to June meeting.
| '''<Comments>:'''  | Recommend asking WG chair, Manny or Paul Sherman to join, have ACCE email address on site. (side note – replace @ with 'at' on address) ''' August 6, 2014Paul will check progress. Change due date to September 3.'''
+
: June 5, 2019: Tabled for now, move to July
 
+
: July, 10, 2019: Paul not here, fair amount of discussion recently.  Michael Faughn working on RTMMS, which will help. Also need to work on TF and IGAMPT.  Move to August
|-
+
:-Aug 7, 2019: Will work on it after Events and Alerts. Michael and Nicholas will work on it when they have time. Move to September.
| align="center" | 174
+
: Sep 4, 2019: Should be able to convene a call and take care of it.  Move to October
| '''<Action Item>''' | POI code validation
+
: Nov 6, 2019:  Some progress, move to Dec.
| '''<Owner>:''' | Paul Sherman
+
: Dec 4, 2019: No new info, move to Feb.
| '''<Participants>''' | Paul Sherman, Ioana, Greg, John G
+
: Feb 5, 2020: Making progress, move to F2F.
| '''<Due Date>''' | August 20, 2014
+
: Apr 23, 2020 - Containment modeling important, can resolve problems, especially during Connectathon.  Asking those that need terms to create containment models. This limits the need for inspecting messages by hand, as computers are much better at it.  He, Michael, and Brian are working on consistent output data as well.  NIST is working with CDC on a similar issues regarding COVID-19 tracking.  Inconsistent data quality is an issue for them as well.  John G – Nicholas will have some info that will help later during F2F. Move to next F2F.
| '''<Status>''' |OPEN
+
: Oct 8, 2020 - Should be resolved with Pump group and work with Michael Faughn. Move out to January call.
| '''<Comments>:''' | Ask NIST to assemble clinical code validation into existing tests''' August 6, 2014:  Some DEC POI tests, validate to existing codes. Narrowed down to 4-5 items, NIST will include in test cases. Change date to Aug 20.'''  
+
: ''' Jan 6, 2021 - Will wrap up when Michael Faughn can focus on it. Review next month.'''
  
|-
 
| align="center" | 175
 
| '''<Action Item>''' |  Develop a PCD UDI whitepaper for IHE
 
| '''<Owner>:'''  | Doug Pratt
 
| '''<Participants>''' | Doug Pratt, Paul Schluter, John Rhoads
 
| '''<Due Date>'''  | October 29, 2014
 
| '''<Status>''' |OPEN
 
| '''<Comments>:'''  | TC UDI Taskforce: Doug Pratt will lead, Paul Schluter and John Rhoads will help.  August 6, 2014:  HL7 orders and observations are addressing this research, will be in HL7 2.8.2. Change date to September 17.'''    Sept 24, 2014: May move to next cycle, goes to HL7 ballot in October.'''
 
  
 
|-
 
|-
| align="center" | 178
+
| align="center" | 202
| '''<Action Item>''' | MSH-5 and Connectathon
+
| '''<Action Item>''' | MEMDMC CP to make PID and PV1 segments optional
| '''<Owner>:'''  | Monroe
+
| '''<Owner>:'''  | Monroe Pattillo
| '''<Participants>''' |  
+
| '''<Participants>''' | Dalibor, John Rhoads
| '''<Due Date>'''  | Oct 22, 2014
+
| '''<Due Date>'''  | Feb 3, 2021
| '''<Status>''' |OPEN
+
| '''<Status>''' | Open
| '''<Comments>:'''  | When required, PCD will need to come up with a mechanism to populate the fieldsOne option: Insert a sentence into the text to emphasize, and have NIST update test to indicate an errorIndicate to participants in pre-connectathon that this will now be part of the testAugust 6, 2014NIST to verify MSH-5 validation is addressed, Change date to August 20. '''  Sept 24, 2014Put identifier into GazelleWhere test case descriptions are very important, we could use the demographics spreadsheetthere's no CN document across PCDSome discussion of RE in the test case descriptionChange due date to F2F'''
+
| '''<Comments>:'''  | Apr 25, 2019: MEMDMC profile to change via CP to use a message template of ORU_R(as allocated by O&O) which affords it the ability to make the usage of the PID and PV1 segments as optional for MEMDMC use casesIf PID and/or PV1 segments are present they should be populated per the IHE PCD TF.  We did this with ACM, so should be able to do so in MEM.
 
+
: May 1, 2019: Getting a new trigger event from HL7.  We can start testing to this.  Won’t make official until HL7 releases new normative.  Will need to talk to NIST about flagging this in testing.  Set to June TC.
 +
: June 5, 2019: Dalibor not here, move to July meeting.
 +
: July 10, 2019:  Nothing new, move to August.
 +
: Aug 7, 2019: HL7 change, NIST tool isn't clear on how to communicate needed info.  Add John Rhoads to Participant list.
 +
: Sep 4, 2019: Up to HL7 meeting to communicate MEMDMC msg.  Conflict in use of PID segment.  MEMDMC needs it’s own trigger.  Monroe will send to John G for the agendaMove to October.
 +
: Nov 6, 2019At HL7 O&O.  They have a huge backlog, will take time.  Problem with HL7 standard, a bit of an unstable reference loop.  Is it possible to ‘pre-adopt’ the triggers?  Yes, if HL7 says they will create them.  Move to Dec.
 +
: Dec 4, 2019: Still waiting on HL7. Review in March.
 +
: March 4, 2020: Waiting for HL7In the queue, not discussed yet.  Needs a promoter on the committee at HL7 O&O to ensure it’s addressedJohn Rhoads will disuss with a member.  Move to F2F.
 +
: Apr 23, 2020 - Once triggers are officially committed by HL7, they can implement itMonroe isn’t sure should be actually owner of this.  John Rhoads talks to O&O a lot.  They have a lot to do with limited resources.  He will take ownershipMove to next F2F.
 +
: '''Oct 8, 2020: In HL7 queue, move to February, after HL7 meeting.'''
  
 
|-
 
|-
| align="center" | 179
+
| align="center" | 206
| '''<Action Item>''' |  IPEC and EC documentation
 
| '''<Owner>:'''  | Ken Fuchs
 
| '''<Participants>''' | Ken Fuchs
 
| '''<Due Date>'''  |
 
| '''<Status>''' |OPEN
 
| '''<Comments>:'''  | Look at IHE.Net and our Wiki to see if IPEC and EC are properly covered there (from Ken's "new topic" Joint PC-TC).'''  August 6, 2014:  Reference Action Item 170, may overlap. Change date to October 15 '''
 
 
 
 
 
 
 
|}
 
 
 
==Items 180-189==
 
 
 
:{|border="2"
 
|-
 
! width="5%"  align="center" |No.
 
! width="15%"  align="left"  |Action Item
 
! width="5%"  align="left"  |Owner
 
! width="5%  align="left"  |Participants
 
! width="10%  align="left"  |Due
 
! width="5%  align="left"  |Open/Closed
 
!              align="left"  |Description/Update
 
 
 
|-
 
| align="center" | 182
 
| '''<Action Item>''' | Configure POI document to required format
 
| '''<Owner>:'''  | Ioana
 
| '''<Participants>''' |John Rhoads
 
| '''<Due Date>'''  | August 20, 2014
 
| '''<Status>''' |OPEN
 
| '''<Comments>:'''  | May 14, 2014: Involve John Rhoads.  First device specific profile, first Vol 3 document.  Those concerned about how the document is different need to provide Ioana with that feedback ASAP.  Not a new profile, a device specific implementation.  Needs to include MDS and LOINC.  Change due date to June 11.'''  Change date to August 20.'''
 
|-
 
| align="center" | 183
 
| '''<Action Item>''' | CP for WCM and implementation
 
|'''<Owner>:'''  | Bikram
 
| '''<Participants>''' | Bikram and Chris Courville
 
| '''<Due Date>'''  | October 21, 2014
 
| '''<Status>''' |OPEN
 
| '''<Comments>:'''  | April 4, 2014:  August 6, 2014: Paul Sherman will ping Bikram and Chris for any activity. Change date to August 20.'''  Oct 1, 2014: No specific update, they're working on it. Change to F2F.'''
 
 
 
 
 
|-
 
| align="center" | 184
 
| '''<Action Item>''' | Update CP097 and submit for balloting
 
| '''<Owner>:'''  | Todd
 
| '''<Participants>''' |
 
| '''<Due Date>'''  | October 21, 2014
 
| '''<Status>''' |OPEN
 
| '''<Comments>:'''  | April 4, 2014:  August 6, 2014: John Garguilo will check on status.  Set date to August 20.'''  October 1, 2014: Change due date to Face to Face.'''
 
 
 
|-
 
| align="center" | 185
 
| '''<Action Item>''' | White paper on PCIM-DEC series to address unknown/no patient challenges
 
| '''<Owner>:'''  | John Rhoads
 
| '''<Participants>''' |
 
| '''<Due Date>'''  | October 22, 2014
 
| '''<Status>''' |OPEN
 
| '''<Comments>:'''  | April 4, 2014:'''  August 6, 2014: Work underway, plan to deliver a version at fall F2F. Set due date to Oct 22.'''
 
 
 
 
 
|-
 
| align="center" | 186
 
| '''<Action Item>''' | Review and reformat ftp site
 
| '''<Owner>:'''  | Jeff McGeath
 
| '''<Participants>''' | Jeff McGeath, Paul Sherman
 
| '''<Due Date>'''  | October 21, 2014
 
| '''<Status>''' |OPEN
 
| '''<Comments>:'''  | April 4, 2014:  August 6, 2014:  Set date to August 20 .'''  Oct 1, 2014:  Set as a Face  to Face item.'''
 
 
 
|-
 
| align="center" | 187
 
| '''<Action Item>''' | Wiki page updates: Cochairs address cross group pages
 
| '''<Owner>:'''  | Jeff McGeath
 
| '''<Participants>''' |
 
| '''<Due Date>'''  | October 21, 2014
 
| '''<Status>''' |OPEN
 
| '''<Comments>:'''  | April 4, 2014: WGs address their specific wiki pages.  Announce at PC and TC calls and add to respective Action Item lists.  August 6, 2014:  Set date to August 20.'''  October 1, 2014:  Getting in alignment with other domains.  All domains are to contain certain content.  Wiki pages need to be brought up to date.  Monroe updated the OID page, the date page is current, a number need updated.  Tag appropriate pages for coordinated work.  Will add an agenda item to Co-Chair to review a page per meeting.  Change date to F2F.'''
 
|-
 
| align="center" | 189
 
| '''<Action Item>''' |  Identify unique identifiers before the Connectathon
 
| '''<Owner>:'''  | John Garguilo
 
| '''<Participants>''' |
 
| '''<Due Date>'''  | October 22, 2014
 
| '''<Status>''' |OPEN
 
| '''<Comments>:'''  | Related to EUI-64 issue.  John will work on identifying unique IDs before the Connectathon.  Set Due Date to October 22, 2014.
 
 
 
 
 
 
 
|}
 
 
 
==Items 190-199==
 
 
 
:{|border="2"
 
|-
 
! width="5%"  align="center" |No.
 
! width="15%"  align="left"  |Action Item
 
! width="5%"  align="left"  |Owner
 
! width="5%  align="left"  |Participants
 
! width="10%  align="left"  |Due
 
! width="5%  align="left"  |Open/Closed
 
!              align="left"  |Description/Update
 
 
 
|-
 
| align="center" | 190
 
 
| '''<Action Item>''' |  
 
| '''<Action Item>''' |  
 
| '''<Owner>:'''  |  
 
| '''<Owner>:'''  |  
 
| '''<Participants>''' |  
 
| '''<Participants>''' |  
 
| '''<Due Date>'''  |  
 
| '''<Due Date>'''  |  
| '''<Status>''' |OPEN
+
| '''<Status>''' |  
| '''<Comments>:'''  |
 
|-
 
| align="center" | 191
 
| '''<Action Item>''' | 
 
|'''<Owner>:'''  |
 
| '''<Participants>''' |
 
| '''<Due Date>'''  |
 
| '''<Status>''' |OPEN
 
| '''<Comments>:'''  |
 
|-
 
| align="center" | 192
 
| '''<Action Item>''' | 
 
| '''<Owner>:'''  |
 
| '''<Participants>''' |
 
| '''<Due Date>'''  |
 
| '''<Status>''' |OPEN
 
| '''<Comments>:'''  |
 
|-
 
| align="center" | 193
 
| '''<Action Item>''' | 
 
|'''<Owner>:'''  |
 
| '''<Participants>''' |
 
| '''<Due Date>'''  |
 
| '''<Status>''' |OPEN
 
 
| '''<Comments>:'''  |  
 
| '''<Comments>:'''  |  
  
  
 
|-
 
|-
| align="center" | 194
+
| align="center" | 207
 
| '''<Action Item>''' |  
 
| '''<Action Item>''' |  
 
| '''<Owner>:'''  |  
 
| '''<Owner>:'''  |  
 
| '''<Participants>''' |  
 
| '''<Participants>''' |  
 
| '''<Due Date>'''  |  
 
| '''<Due Date>'''  |  
| '''<Status>''' |OPEN
+
| '''<Status>''' |  
| '''<Comments>:'''  |  
+
| '''<Comments>:'''  |
 
 
|-
 
| align="center" | 195
 
| '''<Action Item>''' | 
 
| '''<Owner>:'''  |
 
| '''<Participants>''' |
 
| '''<Due Date>'''  |
 
| '''<Status>''' |OPEN
 
| '''<Comments>:'''  |
 
 
 
  
 
|-
 
|-
| align="center" | 196
+
| align="center" | 208
 
| '''<Action Item>''' |  
 
| '''<Action Item>''' |  
 
| '''<Owner>:'''  |  
 
| '''<Owner>:'''  |  
 
| '''<Participants>''' |  
 
| '''<Participants>''' |  
 
| '''<Due Date>'''  |  
 
| '''<Due Date>'''  |  
| '''<Status>''' |OPEN
+
| '''<Status>''' |  
| '''<Comments>:'''  |  
+
| '''<Comments>:'''  |
  
|-
 
| align="center" | 197
 
| '''<Action Item>''' |
 
| '''<Owner>:'''  |
 
| '''<Participants>''' |
 
| '''<Due Date>'''  |
 
| '''<Status>''' |OPEN
 
| '''<Comments>:'''  |
 
  
 
|-
 
|-
| align="center" | 198
+
| align="center" | 209
 
| '''<Action Item>''' |  
 
| '''<Action Item>''' |  
 
| '''<Owner>:'''  |  
 
| '''<Owner>:'''  |  
 
| '''<Participants>''' |  
 
| '''<Participants>''' |  
 
| '''<Due Date>'''  |  
 
| '''<Due Date>'''  |  
| '''<Status>''' | OPEN
+
| '''<Status>''' |  
 
| '''<Comments>:'''  |
 
| '''<Comments>:'''  |
 
|-
 
| align="center" | 199
 
| '''<Action Item>''' | 
 
| '''<Owner>:'''  |
 
| '''<Participants>''' |
 
| '''<Due Date>'''  |
 
| '''<Status>''' |OPEN
 
| '''<Comments>:'''  |
 
 
  
  
 
|}
 
|}
 
 
  
 
==Tracking Related Items, 1-20 ==
 
==Tracking Related Items, 1-20 ==
Line 481: Line 228:
 
DCM (Detailed Clinical Model for Devices) - Develop/provide a publication in a form that will be given to IHE-PCD (Ioana S.) due  
 
DCM (Detailed Clinical Model for Devices) - Develop/provide a publication in a form that will be given to IHE-PCD (Ioana S.) due  
 
| '''<Date Added>:'''  | F2F Oct. 2011
 
| '''<Date Added>:'''  | F2F Oct. 2011
| '''<Date Closed>''' |  
+
| '''<Date Closed>''' | Oct 5, 2017
| '''<Description/Update>'''  |
+
| '''<Description/Update>'''   | Oct 5, 2017: Reviewed at F2F. Unanimous decision by TC to sunset this item.
  
 
|-
 
|-
 
| align="center" | 3
 
| align="center" | 3
| '''<Item and Relationships>''' |  
+
| '''<Item and Relationships>''' | SFT Segment - Desire to include info from pumps, software segment preferred.
| '''<Date Added>:'''  |  
+
| '''<Date Added>:'''  | F2F April 12, 2018
 
| '''<Date Closed>''' |  
 
| '''<Date Closed>''' |  
 
| '''<Description/Update>'''  |  
 
| '''<Description/Update>'''  |  

Revision as of 11:38, 6 January 2021

See also PCD Technical Committee Closed Action Items page.

To see changes between current and last(or any earlier) versions of the action item list, click the history tab at the top of the page, select versions to compare and click compare command.

Significant recent changes, other than dates, will be in bold.

Items 60 - 69 Are Closed

Items 70-79 Are Closed

Items 80-89 are closed

Items 90-99 are closed

Items 100-109 are closed

Items 110-119 are closed

Items 120-129 are Closed

Items 130-139 are closed

Items 140-149 are Closed

Items 150-159 are Closed

Items 160-169 are Closed

Items 170-179 are Cosed

Items 180-189 are closed

Items 190-199

No. Action Item Owner Participants Due Open/Closed Description/Update



196 Add PCD specific values to HL7 table 78 John Garguilo Feb 3, 2021 OPEN From 2016 NA Connectathon. Status is in PCD TF v5 Vol2 page 119 at line 2890, but not in NIST Tool which only supports values from HL7 Table 0078. We can suggest table changes to HL7, John will take this to HL7.

April 21, 2016: Values are in TF. John will approach HL7 vocab group at their meeting in two weeks. Anticipates no issue. If not successful, will add XML table. Set to PC&TC meeting May 18.

May 18, 2016: Couldn't find the term we wanted to add, please send it to John. Change date to June 1. Should be in Vol 2, reference to table 78. Set to next TC meeting.
June 1, 2016: Change to July 6 TC call.
July 6, 2016: Nothing new, set to next TC meeting.
Aug 3, 2016: Nothing new, set to next TC meeting.
Sep 7, 2016: Will try to present at HL7, set to Oct PC/TC meeting. Set to Oct meeting.
Oct 5, 2016: Contacted Vocabulary working group, almost done. Will extend tables with appropriate codes. A simple add to get the changes put in. Set to F2F.
Oct 12, 2016: Add PCD specific values to HL7 table 78 – pp61 discusses it, we have values not in HL7. HL7: write up proposal for them to approve or not. These are generic enough for other to use them, it is also a way to get some null values in there. Can we create a local table to address it – Yes. We will need to do that for the Connectathon. But was only checked against HL7 table for DEC; need to add a local DEC table. May want to define a write operation as well. Targeting HL7 Jan 2017 to have values added to Table 3.9.4.1.2.5-3. Set due date to Feb TC meeting.
Feb 1, 2017: Will submit to HL7 vocabulary group. Will present to May HL7 meeting. Review May 17th PC and TC.
May 17, 2017: Needs some paperwork done and sent, should be done in a month. Review June 21.
July 12, 2017: Nothing new. Review at Aug TC.
Aug 15, 2017: No new information, move to Sep meeting.
Sep 27, 2017: No update, effort to get these formally into HL7. John will contact Ted Klein at HL7, set to Oct TC.
Oct 5 2017: Validated and put in tool. Contacted Ted Klein, moving forward. Should be completed Nov 29. Set to Dec TC.
Dec 20 2017: John not available, move to Jan TC meeting.
Jan 3, 2018: No update, move to Feb TC.
Feb 7, 2018: John still needs to submit something. Set to March TC meeting.
Mar 21, 2018: No update, move to Apr F2F.
April 12, 2018: John not available, move to April PC&TC.
April 19, 2018: No update, move to May TC meeting.
May 2, 2018: Work continues, hope to make progress from HL7 meetings. Set to June TC meeting.
June 13, 2018: No new info, move the joint PC&TC meeting.
June 27, 2018: John G not available, set to next TC meeting.
July 25, 2018: No update yet, set to Sept TC meeting.
Aug 15, 2018: John submitted info to Ted Klein, will need to follow up at HL7 meeting. He can update at F2F.
Oct 18, 2018: John not available, move to next TC meeting.
Nov 5, 2018: No new info, next HL& should provide update. Set to Jan meeting.
Jan 2, 2019: NIST unavailable, set to Feb meeting
Feb 6, 2019: John not here, move to Joint PC/TC
Mar 6, 2019: John not available, move to F2F
Apr 25, 2019: John will get it in as soon as he can. Review in June
June 5, 2019: John not on call, set to July meeting
July 10, 2019: No change, move to August
Aug 7, 2019: Checks data validity. John not available, move to next month.
Sep 4, 2019: No update, move to next month.
Nov 6, 2019: No update, move to Dec.
Dec 4, 2019: Review after next HL7 meeting. Move to March.
March 4, 2020: John not available, move to April meetings
April 1, 2020: May HL7 cancelled, unable to do anything for now, move to September meeting.
Sept 2, 2020: HL7 meeting this month, move to F2F
Oct 8, 2020: ::- No update. Move to February.


Items 200 - 209

Number Action Owner Participants Due Date Status Comments
200 MDS and VMD Requirements Paul Schluter Feb 3, 2021 Open June 27, 2018: Created. Need to make consistent, so they can be applied uniformly by NIST tool. Set to next TC meeting
July 25, 2018: No update yet, move to F2F TC meeting.
Oct 18, 2018: Loose, not tested by NIST tools. Required disclosure at CMI. Need to assemble ‘uber’ models. How rigorous. Part may include retrofitting specificity in TF. May need general x-type path. May be able to use a tool like FHIR’s to create the containment models. Also want to clearly state what containment is. Discussed options and current process with some examples. Need to work out wrinkles for multiple devices doing the same thing. Need to solve persistence issue. Example: BP monitoring channels, when expanding channels, need to ensure the original maintains its channel number. Discussed different IV pump models as well as monitoring. Found a challenge with ACM; Alarms and other messages. If the alarm is in the first message, then another message is generated with another field completed, the alarm may not be at the same location in the message. Oliver will draft a White Paper to address MDS, persistence and channel identification, what works, doesn’t work and mine fields. He has a lot of notes already. Will review Dec TC meeting.
Dec 19, 2018 - Using it, NIST working on it. Until 10101r is out the door, won’t be able to focus on it. Not sure next stage of ‘done’ is. Push out to February, and discuss at DPI meetings.
Feb 6, 2019: Nothing right now, move to next TC.
Mar 6, 2019: Should be able to start on it again soon. Review next PC&TC
Mar 20, 2019: No new info, could use a ½ hour discussion at F2F. Set to F2F
Apr 25, 2019Related to the OBX-4 question, need to figure out what to do. It is a ‘should’, do we make it a ‘shall’? If so, we need to let implementer know well before Connectathon. Include Lexicographic order. Move out to June meeting.
June 5, 2019: Tabled for now, move to July
July, 10, 2019: Paul not here, fair amount of discussion recently. Michael Faughn working on RTMMS, which will help. Also need to work on TF and IGAMPT. Move to August
-Aug 7, 2019: Will work on it after Events and Alerts. Michael and Nicholas will work on it when they have time. Move to September.
Sep 4, 2019: Should be able to convene a call and take care of it. Move to October
Nov 6, 2019: Some progress, move to Dec.
Dec 4, 2019: No new info, move to Feb.
Feb 5, 2020: Making progress, move to F2F.
Apr 23, 2020 - Containment modeling important, can resolve problems, especially during Connectathon. Asking those that need terms to create containment models. This limits the need for inspecting messages by hand, as computers are much better at it. He, Michael, and Brian are working on consistent output data as well. NIST is working with CDC on a similar issues regarding COVID-19 tracking. Inconsistent data quality is an issue for them as well. John G – Nicholas will have some info that will help later during F2F. Move to next F2F.
Oct 8, 2020 - Should be resolved with Pump group and work with Michael Faughn. Move out to January call.
Jan 6, 2021 - Will wrap up when Michael Faughn can focus on it. Review next month.


202 MEMDMC CP to make PID and PV1 segments optional Monroe Pattillo Dalibor, John Rhoads Feb 3, 2021 Open Apr 25, 2019: MEMDMC profile to change via CP to use a message template of ORU_R(as allocated by O&O) which affords it the ability to make the usage of the PID and PV1 segments as optional for MEMDMC use cases. If PID and/or PV1 segments are present they should be populated per the IHE PCD TF. We did this with ACM, so should be able to do so in MEM.
May 1, 2019: Getting a new trigger event from HL7. We can start testing to this. Won’t make official until HL7 releases new normative. Will need to talk to NIST about flagging this in testing. Set to June TC.
June 5, 2019: Dalibor not here, move to July meeting.
July 10, 2019: Nothing new, move to August.
Aug 7, 2019: HL7 change, NIST tool isn't clear on how to communicate needed info. Add John Rhoads to Participant list.
Sep 4, 2019: Up to HL7 meeting to communicate MEMDMC msg. Conflict in use of PID segment. MEMDMC needs it’s own trigger. Monroe will send to John G for the agenda. Move to October.
Nov 6, 2019: At HL7 O&O. They have a huge backlog, will take time. Problem with HL7 standard, a bit of an unstable reference loop. Is it possible to ‘pre-adopt’ the triggers? Yes, if HL7 says they will create them. Move to Dec.
Dec 4, 2019: Still waiting on HL7. Review in March.
March 4, 2020: Waiting for HL7. In the queue, not discussed yet. Needs a promoter on the committee at HL7 O&O to ensure it’s addressed. John Rhoads will disuss with a member. Move to F2F.
Apr 23, 2020 - Once triggers are officially committed by HL7, they can implement it. Monroe isn’t sure should be actually owner of this. John Rhoads talks to O&O a lot. They have a lot to do with limited resources. He will take ownership. Move to next F2F.
Oct 8, 2020: In HL7 queue, move to February, after HL7 meeting.
206


207
208


209


Tracking Related Items, 1-20

Number Item and Relationships Date Added to List Date Closed Description/Update
1

VA proposal on PulseOx - write up details / issues to TC (Ioana S./Greg S.). Provide mappings to x73 of what VA has from LOINC & SNOMED CT - VA to encode (encode all information?)

F2F Oct. 2011
2

DCM (Detailed Clinical Model for Devices) - Develop/provide a publication in a form that will be given to IHE-PCD (Ioana S.) due

F2F Oct. 2011 Oct 5, 2017 Oct 5, 2017: Reviewed at F2F. Unanimous decision by TC to sunset this item.
3 SFT Segment - Desire to include info from pumps, software segment preferred. F2F April 12, 2018
4
5
6
7
8


9


10


11
12
13
14
15
16
17
18


19


20


Tracking Related Items, 21-40

Number Item and Relationships Date Added to List Date Closed Description/Update
21
22
23
24
25
26
27
28


29


30


See also PCD Technical Committee Closed Action Items page.

Links to PCD TC Meetings

Go to most recent/past meetings or next meeting Category: PCD Meeting

Patient Care Device home