Difference between revisions of "PCD Pre-Connectathon Testing 2010"
Jump to navigation
Jump to search
Line 5: | Line 5: | ||
ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/YR4-2010Connectathon-PreConnectathonTesting/SampleMessages/ | ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/YR4-2010Connectathon-PreConnectathonTesting/SampleMessages/ | ||
+ | The Virtual Connectathons will use these tested messages from sending systems. Test results are due December 1; however Thanksgiving is November 26; for many the effective deadline is November 25. | ||
Return to [[PCD Connectathon&Showcase WG 2009-10]] | Return to [[PCD Connectathon&Showcase WG 2009-10]] |
Revision as of 20:11, 15 October 2009
Post the Messages that Pass Pre-Connectathon Tests with the MWB and NIST Tools
Each system has a distinct folder under each profile implemented. Please post sending messages as early as possible.
The Virtual Connectathons will use these tested messages from sending systems. Test results are due December 1; however Thanksgiving is November 26; for many the effective deadline is November 25.
Return to PCD Connectathon&Showcase WG 2009-10