Difference between revisions of "PCD Pre-Connectathon Testing 2009"
Jump to navigation
Jump to search
m (Establish page) |
m (→ACM Tests: add DEC test section) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
The intention is to post the final versions on the PCD ftp site. | The intention is to post the final versions on the PCD ftp site. | ||
+ | |||
+ | == DEC Tests == | ||
+ | |||
== ACM Tests == | == ACM Tests == | ||
− | |||
== PIV Tests == | == PIV Tests == | ||
Line 14: | Line 16: | ||
== Links == | == Links == | ||
− | [[PCD | + | [[PCD Showcase 2009 Scenario]] |
− | [[PCD Showcase | + | [[PCD Connectathon&Showcase WG 2008-9]] |
[[Patient Care Device | PCD Home]] | [[Patient Care Device | PCD Home]] | ||
− | |||
− |
Latest revision as of 19:49, 20 November 2008
This page provides the Patient Care Device domain with a place to develop and refine the 2009 North American Pre-Connectathon tests.
The intention is to post the final versions on the PCD ftp site.