PCD MEM 2009-05-05
Jump to navigation
Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
Meeting Purpose
IHE PCD MEM Medical Equipment Management Discussion at Spring 2009 F2F (NIST, Washington, DC)
Proposed Agenda
- 1 - Overview of MEM Status (New Directions Poster)
- 2 - Detailed break-out of block diagrams
- 3 - MEM Roadmap
Minutes
Participants
Discussion
Item Topic Discussion 1 Overview of MEM Status Status/Discussion: The whitepaper is still under development. Next steps
- Roadmap
- Clarify the use cases versus scenarios
- Clarify scope of the blocks
Action(s):2 Detailed break-out of block diagrams Status/Discussion: - Patch Management
- Rename to Software Management
- Pending software should be clarified
- Downloaded and ready for install status
- Authorized for installation status
- Vendor supplied vs. OTS
- Upgrades vs. Bug fixes
- Should be explicit that this is not a push mechanism, only a reporting mechanism
- Patch history should be another system not a function of this reporting
- There should be a method of site customized software level (i.e. a drug library in pumps)
- This could also be transformed to compatibility management for example wireless compatibility
- Location Services
- Yes this is RTLS
- Not a protocol for location tracking but a method of exporting tracking information across the enterprise
- There was some work done on this several years back in HL7, need to investigate its status
- This would not be for location tracking (tag-type) companies but for interoperability vendors
- Only boundary alarms seems to have an obvious solution
- Also include in the scope a location query mechanism
- Battery Management
- The topics included in the poster seem to represent the issues
- Operational Status and Monitoring
- Define alerts versus alarms
- Include calibration check alarms
Action(s): Examine status of location services within HL73 MEM Roadmap Status/Discussion: Decisions/Issues:
- Some of this could be solved using just an aperiodic PCD-01 message
Action(s):
- New Brief Profile Proposals for Cycle 5
- Battery management (leverage existing PCD-01)
- Location boundary alarms
- Other work items for Cycle 5
- Nomenclature requirements (Data types, names, value sets)