Difference between revisions of "PCD Connectathon&Showcase WG 2012-13"

From IHE Wiki
Jump to navigation Jump to search
Line 207: Line 207:
 
::: https://docs.google.com/spreadsheet/pub?key=0AkpIuejcpSerdERpa2tRQjN6SlFsalNOS1ZqNERuVUE&output=html
 
::: https://docs.google.com/spreadsheet/pub?key=0AkpIuejcpSerdERpa2tRQjN6SlFsalNOS1ZqNERuVUE&output=html
 
* Message Workbench
 
* Message Workbench
 +
:: Message Workbench is good resource to develop HL7 conformance profiles and as a simulator (test engine)
 
:: Message Workbench Tutorials: ftp://ftp.ihe.net/Patient_Care_Devices/Tools/MWB/MWB%20Recordings/
 
:: Message Workbench Tutorials: ftp://ftp.ihe.net/Patient_Care_Devices/Tools/MWB/MWB%20Recordings/
 
* Consider Potential Pre-Connectathon (NIST) Tests and review last year's tests of interest
 
* Consider Potential Pre-Connectathon (NIST) Tests and review last year's tests of interest
 
:: PCD Pre-Connectathon Testing 2012 for the 2013 N A Connectathon: to be updated: [[PCD_Pre-Connectathon_Testing_Information]]
 
:: PCD Pre-Connectathon Testing 2012 for the 2013 N A Connectathon: to be updated: [[PCD_Pre-Connectathon_Testing_Information]]
:: Note: http://ihewiki.wustl.edu/wiki/index.php/Index_to_Preconnectathon_Test_Software for the index to Pre-Connectathon tests.
+
:: NIST Pre-Connectathon Tool ("Isolated test environment") and Connectathon Tool ("Instance test environment")
 +
:: Both NIST tool sites are good resources for application testing and are required for Cycle 7 testing
 +
:: Note: http://ihewiki.wustl.edu/wiki/index.php/Index_to_Preconnectathon_Test_Software for the index to Pre-Connectathon tests -  see "Patient Care Devices" section of table.
 
* Next Meeting: September 18
 
* Next Meeting: September 18
  

Revision as of 07:38, 5 September 2012

This is the entry point for this Working Group in the 2012-13 Connectathon and HIMSS Showcase cycle.

at this time this is only a template

Meeting Purpose

Collaborative effort to discuss implementation and demonstration issues and preparations


WebEx Information

Topic: PCD Connectathon and Showcase Working Group

Dates: Regularly Scheduled Weekly Meetings -- Most Tuesdays, through March

Time: 2 pm, Eastern Time (New York EST, or EDT depending upon the date)

Duration: 60 Minutes


Related Pages and Documents

this page is a work in progress to be updated for the 2013 North American Connectathon and HIMSS13

PCD Getting Started page with useful links http://wiki.ihe.net/index.php?title=PCD_Getting_Started

Orientation to IHE Connectathons and Showcases (demonstrations): Webinars: the entire schedule is available at http://ihe.net/Events/webinars2012.cfm. They have already begun and are recorded.

  • The PCD Update is scheduled for Thursday, August 19, 3 to 4:30 pm EDT (2-3:30 CDT, noon to 1:30 PDT).

Interpreting IHE Technical Frameworks http://www.ihe.net/north_america/flash/First-TimersSession_June18_2009/First-TimersSession_June18_2009.swf

  • PCD CPs are found at PCD_CP_grid
  • Published and Draft Versions of the TF, Supplements, Other Documents:
- The PCD ftp site has draft versions. For those submitted to IHE for publication in most cases there will be few significant changes and these will be useful while waiting for the published version.
- Published (and possibly in the process of being replaced with new versions):
o http://ihe.net/Technical_Framework/index.cfm#pcd
  • Not Yet Published:
o ftp://ftp.ihe.net/Patient_Care_Devices/Profiles/
  • Request for Brief Proposals: Email from Celina Roth Aug. 2 - Submit Brief Proposals by October 5, 2012

Action Items are tracked on PCD-Connectathon&Showcase-ActionItemsCycle7-2012-2013

Message Workbench Tutorials: ftp://ftp.ihe.net/Patient_Care_Devices/Tools/MWB/MWB%20Recordings/

2013 North American Connectathon Overview and Detail - Important to View Periodically

http://www.iheusa.org/docs/NA-Connectathon-Policies-and-Guidelines-2013.pdf

PCD Pre-Connectathon Testing 2012 for the 2013 N A Connectathon: to be updated: PCD_Pre-Connectathon_Testing_Information

PCD Virtual Connectathon Testing 2012 for the 2013 N A Connectathon

HIMSS13 http://www.interoperabilityshowcase.org/himss13/index.asp Note: Registration closes October 5, 2012.

PCD Showcase 2013 Scenario, PCD Showcase 2011 Scenario, PCD Showcase 2012 Scenario

Pictures from past HIMSS Interoperability Showcases are on the PCD ftp site.

Some of the meetings are recorded. Links to the recordings are provided below, along with links to the discussion summary.

Profiles and Supplements

PCD links to profiles are found at http://wiki.ihe.net/index.php?title=PCD_Profiles

Profile candidates for testing in the North American Connectathon in January, 2013: ACM with WCM option; DEC with SPD, POI, WCM options; IDCO; IPEC; PIV; RTM

Other profiles that are works in process can be found through the PCD Wiki page above.

Action Items (Details in meeting notes)

Action Items are tracked on PCD-Connectathon&Showcase-ActionItemsCycle7-2012-2013

March 2012 Meetings (some from 2011-12 page)

Preparation for the 2013 N. A. Connectathon and HIMSS13 begins this year in June.

April, 2012 Meetings

Preparation for the 2013 N. A. Connectathon and HIMSS13 begins this year in June.

See last cycle for activities leading up to the AAMI Mini-Showcase.

May, 2012 Meetings

Preparation for the 2013 N. A. Connectathon and HIMSS13 begins this year in June.

See last cycle for activities leading up to the AAMI Mini-Showcase.

June, 2012 Meetings

First meeting, 2012-2013 Cycle, June 12, 2011, 2 pm EDT PCD_Connectathon&Showcase_2012-06-12_Webex

  • Introductions
  • Review ACM Connectathon Tests
  • Review DEC Connectathon Tests

Second meeting, 2012-2013 Cycle, June 19, 2011, 2 pm EDT PCD_Connectathon&Showcase_2012-06-19_Webex

  • Introductions
  • General comments on process (e.g., CPs impact upon implementations)
  • Review PIV Connectathon Tests
  • Review IPEC Connectathon Tests
  • Next Meetings

Third meeting, 2012-2013 Cycle, June 26, 2011, 2 pm EDT PCD_Connectathon&Showcase_2012-06-26_Webex

  • Introductions
  • WCM content option: Discuss what might be tested
  • Review DEC Connectathon Tests
  • Next Meetings
IDCO Friday, June 29
Tuesday, July 3 TBD


Fourth - and Special - meeting, 2012-2013 Cycle, June 29, 2012, 2 pm EDT PCD_Connectathon&Showcase_2012-06-29_Webex

This was a meeting with the IDCO WG. The meeting summary was provided by Stephen Swanson, St. Jude Medical, and is available through the link above (June 29 meeting).

July, 2012 Meetings

Fifth meeting, 2012-2013 Cycle, July 17, 2012, 2 pm EDT There were no Meetings July 3 and 10.

  • Introductions
  • This meeting was cancelled; an informal discussion of the Connectathon process took place with Covidien.
  • POI: Discussion of what might be tested was postponed for two weeks.
  • Next Meetings
ADQ: July 24 - Discuss what might be tested.
POI: July 31 - Discuss what might be tested.


Sixth meeting, 2012-2013 Cycle, July 24, 2012, 2 pm EDT PCD_Connectathon&Showcase_2012-07-24_Webex

  • Introductions
  • This meeting was not recorded
  • ADQ: Discuss what might be tested
  • Next Meetings
POI: July 31 - Discuss what might be tested.


Seventh meeting, 2012-2013 Cycle, July 31, 2012, 2 pm EDT PCD_Connectathon&Showcase_2012-07-31_Webex

PCD Connectathon and Showcase WG-20120731 1805-1 Tuesday, July 31, 2012 2:05 pm New York Time 57 Minutes
  • Introductions
  • Review Recent Discussion Summaries
  • POI: Discuss what might be tested.
  • ADQ name has been changed to Retrospective Data Query, RDQ and published
  • Next Meetings

August, 2012 Meetings

Eighth meeting, 2012-2013 Cycle, August 14, 2012, 2 pm EDT PCD_Connectathon&Showcase_2012-08-14_Webex This meeting was recorded; the link distributed; it will be available for a limited time.

  • Introductions
  • Review Current Events: Connectathon Registration Opens Aug. 22
  • Review Draft Tests RDQ
  • Next Meeting


Ninth meeting, 2012-2013 Cycle, August 21, 2012, 2 pm EDT PCD_Connectathon&Showcase_2012-08-21_Webex

  • Introductions
  • Review Current Events:
http://ihe.net/Technical_Framework/index.cfm#pcd
http://na2013.wustl.edu/Registration.html
  • Review Draft Tests: DEC including POI, WCM Options
  • Next Meeting

Tenth meeting, 2012-2013 Cycle, August 28, 2012, 2 pm EDT PCD_Connectathon&Showcase_2012-08-28 Webex

  • Cancelled!
The plan to Review Draft Tests: All, including ACM including WCM Option - suggestions, comments, edits, etc. were requested by email
  • Next Meeting - Consider What Pre-Connectathon (NIST) Tests Are To Be Available: consider what the priorities are for the new profiles and actors, and also for the earlier sets.

September, 2012 Meetings

Eleventh meeting, 2012-2013 Cycle, September 4, 2012, 2 pm EDT PCD_Connectathon&Showcase_2012-09-04_Webex This meeting was __ recorded; the link distributed; it will be available for a limited time.

  • Introductions
  • Review Current Events:
Connectathon and HIMSS13 Interoperability Showcase registrations are open.
Be sure to bookmark http://na2013.wustl.edu/ and become familiar with the many pages.
Connectathon: Watch for "dependencies" - see button on profile registration to check for dependencies (e.g. CT). Registration closes October 5.
Showcase registration closes October 5.
http://iheusa.org/Contact-Us.aspx with two listservs - the Connectathon Google Group is essential and distinct from our PCD WG's GG.
The web site for the Connectathon includes this schedule:
https://docs.google.com/spreadsheet/pub?key=0AkpIuejcpSerdERpa2tRQjN6SlFsalNOS1ZqNERuVUE&output=html
  • Message Workbench
Message Workbench is good resource to develop HL7 conformance profiles and as a simulator (test engine)
Message Workbench Tutorials: ftp://ftp.ihe.net/Patient_Care_Devices/Tools/MWB/MWB%20Recordings/
  • Consider Potential Pre-Connectathon (NIST) Tests and review last year's tests of interest
PCD Pre-Connectathon Testing 2012 for the 2013 N A Connectathon: to be updated: PCD_Pre-Connectathon_Testing_Information
NIST Pre-Connectathon Tool ("Isolated test environment") and Connectathon Tool ("Instance test environment")
Both NIST tool sites are good resources for application testing and are required for Cycle 7 testing
Note: http://ihewiki.wustl.edu/wiki/index.php/Index_to_Preconnectathon_Test_Software for the index to Pre-Connectathon tests - see "Patient Care Devices" section of table.
  • Next Meeting: September 18

Twelfth meeting, 2012-2013 Cycle, September 18, 2012, 2 pm EDT PCD_Connectathon&Showcase_2012-09-18_Webex This meeting was __ recorded; the link distributed; it will be available for a limited time.

  • Introductions
  • Review Current Events:
TBD
  • Consider Potential Pre-Connectathon (NIST) Tests and review last year's tests of interest
PCD Pre-Connectathon Testing 2012 for the 2013 N A Connectathon: to be updated: PCD_Pre-Connectathon_Testing_Information
Note: http://ihewiki.wustl.edu/wiki/index.php/Index_to_Preconnectathon_Test_Software for the index to Pre-Connectathon tests.
  • Next Meeting: September 25


Thirteenth meeting, 2012-2013 Cycle, September 25, 2012, 2 pm EDT PCD_Connectathon&Showcase_2012-09-25_Webex This meeting was __ recorded; the link distributed; it will be available for a limited time.

  • Introductions
  • Review Current Events:
  • Review Draft Tests
  • Next Meeting

October, 2012 Meetings

update this page

include links to recordings, etc.

November, 2012 Meetings

update this page

include links to recordings, etc.

December, 2012 Meetings

update this page

include links to recordings, etc.

January 2013 Meetings

update this page

include links to recordings, etc.

February 2013 Meetings

update this page

include links to recordings, etc.

March, 2013 Meetings

update this page

include links to recordings, etc.