Difference between revisions of "PCD Connectathon&Showcase WG 2009-10"

From IHE Wiki
Jump to navigation Jump to search
m (→‎January 2010 Meetings: establish Jan. 5 - preliminary items)
m (→‎January 2010 Meetings: First pass at agenda for meetings)
Line 725: Line 725:
 
:* Task Force Update
 
:* Task Force Update
 
:* Design of structures; request for physical requirements
 
:* Design of structures; request for physical requirements
 +
 +
:Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
 +
 +
:Other
 +
 +
:
 +
 +
'''Agenda Twenty-Sixth Meeting January 19, 3 pm EST [[PCD Connectathon&Showcase 2010-01-19 Webex]]'''
 +
'''preliminary'''
 +
:* Review of previous meeting Discussion Summary [[PCD Connectathon&Showcase 2010-01-05 Webex]]
 +
:Pre-Connectathon and Connectathon Tests and Processes
 +
:* Survey of Lessons Learned and Potential Improvements
 +
:* Issues with Profile TIs, MWB item - from participants
 +
:* Other technical developments
 +
:Showcase - Update
 +
:* Task Force Update
 +
:* Design of structure
 +
:* Showcase Scenarios, Scripts
 +
 +
:Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
 +
 +
:Other
 +
 +
:
 +
 +
 +
'''Agenda Twenty-Seventh Meeting January 26, 3 pm EST [[PCD Connectathon&Showcase 2010-01-26 Webex]]'''
 +
'''placeholder'''
 +
:* Review of previous meeting Discussion Summary [[PCD Connectathon&Showcase 2010-01-19 Webex]]
 +
:Pre-Connectathon and Connectathon Tests and Processes
 +
:* Survey of Lessons Learned and Potential Improvements
 +
:* Issues with Profile TIs, MWB item - from participants
 +
:* Other technical developments
 +
:Showcase - Update
 +
:* Task Force Update
 +
:* Design of structure
 +
:* Showcase Scenarios, Scripts
  
 
:Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
 
:Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en

Revision as of 22:27, 4 January 2010

This is the entry point for this Working Group in the 2009-10 Connectathon and HIMSS Showcase cycle.

Meeting Purpose

Collaborative effort to discuss implementation and demonstration issues and preparations


WebEx Information

Topic: PCD Connectathon and Showcase Working Group

Dates: Regularly Scheduled Weekly Meetings -- Most Tuesdays, through March

Time: 2 pm, Eastern Time (New York EST, or EDT depending upon the date)

Duration: 60 Minutes


Related Pages and Documents

PCD Getting Started page with useful links http://wiki.ihe.net/index.php?title=PCD_Getting_Started

Orientation to IHE Connectathons and Showcases (demonstrations) http://www.ihe.net/north_america/flash/IHE_Educational_Webinar_Series_KickOff/IHE_Educational_Webinar_Series_KickOff.swf

Interpreting IHE Technical Frameworks http://www.ihe.net/north_america/flash/First-TimersSession_June18_2009/First-TimersSession_June18_2009.swf

Other programs in the series (including PCD's presentation on July 30)

Recorded: https://ihe.webex.com/ihe/lsr.php?AT=pb&SP=EC&rID=34315407&rKey=ba21b0d7905e8ce8
Slided only: http://www.ihe.net/Events/webinars2009.cfm
The first PCD Connectathon/Showcase meeting of this cycle was recorded (except for approximately the first ten minutes) and is available at https://ihe.webex.com/ihe/lsr.php?AT=pb&SP=MC&rID=34324237&rKey=c9d66197998e5e59

HIMSS10 http://www.interoperabilityshowcase.org/

Pictures from HIMSS09 ftp://ftp.ihe.net/Patient_Care_Devices/Showcases/HIMSS2009April/Photos/

Availability of last year's samples and MWB efforts ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/Yr3-2009/Yr3-PreConnectathonTesting/

Action Items are tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en

PCD Pre-Connectathon Testing 2010

PCD Virtual Connectathon Testing 2010

PCD Showcase 2010 Scenario

HIMSS10 Website http://www.himssconference.org/

2010 North American Connectathon Overview - Important to View Periodically http://ihewiki.wustl.edu/wiki/index.php/North_America_2010

Links to Trial Implementation Versions and New Directions Demo Documentation

PCD links to profiles are found at http://wiki.ihe.net/index.php?title=PCD_Profiles

ACM: ftp://ftp.ihe.net/Patient_Care_Devices/TechnicalFrameworkforTrialImplementation/ note work in progress at __

DEC: ftp://ftp.ihe.net/Patient_Care_Devices/TechnicalFrameworkforTrialImplementation/

DPI: http://wiki.ihe.net/index.php?title=DPI#Overview

IDCO: ftp://ftp.ihe.net/Patient_Care_Devices/Profiles/IDCO

MEM: link available at http://wiki.ihe.net/index.php?title=PCD_MEM_WP_Discussion

PIV: link to last TI at ftp://ftp.ihe.net/Patient_Care_Devices/TechnicalFrameworkforTrialImplementation/, and CPs available at http://wiki.ihe.net/index.php?title=PCD_Pump_2009-07-22_WebEx

RTM: ftp://ftp.ihe.net/Patient_Care_Devices/TechnicalFrameworkforTrialImplementation/ note that the latest versions of the tables are at __

Action Items (Details in meeting notes)

Action Items are tracked on a Google Doc page:

http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en


July, 2009 Meetings

1 First meeting July 30, 3 pm EDT PCD Connectathon&Showcase 2009-07-30 Webex,

This meeting was recorded (except for approximately the first ten minutes) and is available at https://ihe.webex.com/ihe/lsr.php?AT=pb&SP=MC&rID=34324237&rKey=c9d66197998e5e59

Potential agenda items:

  • Introduction of Participating Companies and Profiles/Actors (spreadsheets)
- Developing a list of companies, contacts, profiles, actors - survey
- Companies must be IHE members
- Aug. 28 repeat of June 11 Kick Off with reduced old material and addition of HITSP profiles
  • Technical development
- Brief description of the MWB and its uses
- Pre-Connectathon, Virtual Connectathon, Connectathon testing
- NIST's support
- Availability of last year's samples and MWB efforts ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/Yr3-2009/Yr3-PreConnectathonTesting/
- RTM compliance required/desired
  • Intro to Showcase Process
- Design of structure
- Pictures from HIMSS09 ftp://ftp.ihe.net/Patient_Care_Devices/Showcases/HIMSS2009April/Photos/
- Developing Scenario(s)
- PCD will likely have multiple tours
  • Last year's experience, lessons learned
- Orientation, mentoring of those new to the process
- Coordination between technical and marketing folk
  • Establish regular meeting dates
  • Initial Action Items

Establish Initial Action Items'

Action Items
  • Orientation for companies joining for the first time
  • Connectathon Planning
- MWB training
- Status report on tests for Connectathon
- NIST validation
Showcase Planning
  • Scenario
Timeline

August 2009 Meetings

Agenda Second meeting August 11, 3 pm EDT PCD Connectathon&Showcase 2009-08-11 Webex

  • Participating Companies and Profiles/Actors (spreadsheets)
- Update of list of companies, contacts, profiles, actors - survey
- Companies must be IHE members
- Connectathon ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/Yr3-2009/
- Showcase ftp://ftp.ihe.net/Patient_Care_Devices/Showcases/HIMSS2009April/
- Orientation, mentoring of those new to the process
- Coordination between technical and marketing folk
- Message Workbench Training - scheduling tutorials with Peter Rontey (VA)
- PCD F2F October 5-9
  • IHE Webinars - instead of F2F
- PCD Presentation Recorded: https://ihe.webex.com/ihe/lsr.php?AT=pb&SP=EC&rID=34315407&rKey=ba21b0d7905e8ce8
- N A Connectathon Process Aug. 28 http://www.ihe.net/Events/webinars2009.cfm
  • Technical development
- Brief description of the MWB and its uses
- Pre-Connectathon, Virtual Connectathon, Connectathon testing
- NIST's support
- Availability of last year's samples and MWB efforts ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/Yr3-2009/Yr3-PreConnectathonTesting/
- RTM compliance required/desired

Future Agenda Topics to include

  • Connectathon: EUI-64 and RTM
  • Showcase: Lessons Learned

Agenda Third meeting August 18, 3 pm EDT PCD Connectathon&Showcase 2009-08-18 Webex

  • Participating Companies and Profiles/Actors (spreadsheets)
- Update of list of companies, contacts, profiles, actors - survey
- Companies must be IHE members
- PDQ - straight forward addition of this ITI Profile
- PAM - option to use a "fat free" portion of PAM by referencing specific transactions
- Message Workbench Training - scheduling tutorials with Peter Rontey (VA)
- PCD F2F October 5-9
  • IHE Webinars - instead of F2F - reminder
- PCD Presentation Recorded: https://ihe.webex.com/ihe/lsr.php?AT=pb&SP=EC&rID=34315407&rKey=ba21b0d7905e8ce8
- N A Connectathon Process Aug. 28 http://www.ihe.net/Events/webinars2009.cfm
  • Connectathon: EUI-64 and RTM
- RTM compliance required/desired
- EUI-64 required/desired
  • Technical development
- Brief description of the MWB and its uses
- Pre-Connectathon, Virtual Connectathon, Connectathon testing
o Review last year's Pre-Connectathon Tests, new Pre-Connectathon tests for IDCO
- NIST's support
- Availability of last year's samples and MWB efforts ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/Yr3-2009/Yr3-PreConnectathonTesting/

Agenda Fourth meeting August 25, 3 pm EDT PCD Connectathon&Showcase 2009-08-25 Webex preliminary, based upon previous meeting; placeholder; please add

  • Participating Companies and Profiles/Actors (spreadsheets)
- Update of list of companies, contacts, profiles, actors - survey
- Companies must be IHE members
- Request for notetaker(s)

September 2009 Meetings

Agenda Fifth meeting September 1, 3 pm EDT PCD Connectathon&Showcase 2009-09-01 Webex preliminary, based upon previous meetings; placeholder; please add

  • Participating Companies and Profiles/Actors (spreadsheets)
- Update of list of companies, contacts, profiles, actors - survey
- Companies must be IHE members
- PDQ - straight forward addition of this ITI Profile
- PAM - option to use a "fat free" portion of PAM by referencing specific transactions
- Message Workbench Training - scheduling tutorials with Peter Rontey (VA)
- PCD F2F October 5-9
- Review, update PIV Pre-Connectathon Tests
- Develop IDCO Pre-Connectathon Tests
- Otehr
  • IHE Webinars - instead of F2F - reminder
- PCD Presentation Recorded: https://ihe.webex.com/ihe/lsr.php?AT=pb&SP=EC&rID=34315407&rKey=ba21b0d7905e8ce8
- N A Connectathon Process Aug. 28 http://www.ihe.net/Events/webinars2009.cfm
  • Connectathon: EUI-64 and RTM
- RTM compliance required/desired
- EUI-64 required/desired
  • Technical development - reminder
- Brief description of the MWB and its uses
- Pre-Connectathon, Virtual Connectathon, Connectathon testing
- NIST's support
- Availability of last year's samples and MWB efforts ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/Yr3-2009/Yr3-PreConnectathonTesting/

|

Agenda Sixth meeting September 8, 3 pm EDT PCD Connectathon&Showcase 2009-09-08 Webex

  • DOR ability to access ADT (PIB) - Grouped and Non-Grouped actors
- PDQ - straight forward addition of this ITI Profile
- PAM - straight forward addition of this ITI Profile
- PAM Lite - new name for "fat free" portion of PAM referencing specific transactions
  • PIV Grouped and Non-Grouped DEC actors
  • Other technical developments
- Brief description of the MWB and its uses
- Availability of last year's samples and MWB efforts ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/Yr3-2009/Yr3-PreConnectathonTesting/
- Pre-Connectathon, Virtual Connectathon, Connectathon testing
- NIST's support
  • IHE Webinars - instead of F2F - reminder
- PCD Presentation Recorded: https://ihe.webex.com/ihe/lsr.php?AT=pb&SP=EC&rID=34315407&rKey=ba21b0d7905e8ce8
- N A Connectathon Process Aug. 28 http://www.ihe.net/Events/webinars2009.cfm
  • Connectathon
- Registration for Connectathon and Showcase is open until the end of the month
- Participating Companies and Profiles/Actors (spreadsheets)
- Update of list of companies, contacts, profiles, actors - survey
- Companies must be IHE members
- Recruiting additional companies as full participants and recruiting for New Directions
- RTM compliance required/desired
- EUI-64 required/desired
- Message Workbench Training - scheduling tutorials with Peter Rontey (VA)
- PCD F2F October 5-9 - please RSVP and make hotel reservations
- Review, update PIV Pre-Connectathon Tests
- Develop IDCO Pre-Connectathon Tests
- Other

|

Agenda Seventh meeting September 15, 3 pm EDT PCD Connectathon&Showcase 2009-09-15 Webex

- PDQ - straight forward addition of this ITI Profile
- PAM - straight forward addition of this ITI Profile
- PAM Lite - select new name for "fat free" portion of PAM referencing specific transactions
  • PIV Grouped and Non-Grouped DEC actors
  • CPs developed as we progress from here: assure all are on the same page, save CP submission until March
  • Other technical developments
- Availability of last year's samples and MWB efforts ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/Yr3-2009/Yr3-PreConnectathonTesting/
- Pre-Connectathon, Virtual Connectathon, Connectathon testing
- NIST's support
  • Connectathon
- Registration for Connectathon and Showcase is open until the end of the month
- Participating Companies and Profiles/Actors (spreadsheets)
- Correction - companies NEED NOT be IHE members
- Recruiting additional companies as full participants and recruiting for New Directions
- Message Workbench Training - scheduling tutorials with Peter Rontey (VA)
o MWB files are at ftp://ftp.ihe.net/Patient_Care_Devices/Tools/MWB/MWB%20v%201.6.8.2/
- PCD F2F October 5-9 - please RSVP and make hotel reservations
- Review, update PIV Pre-Connectathon Tests
- Develop IDCO Pre-Connectathon Tests
- Other

|

Agenda Eighth meeting September 22, 3 pm EDT PCD Connectathon&Showcase 2009-09-22 Webex

- PDQ - straight forward addition of this ITI Profile
- PAM - straight forward addition of this ITI Profile
- PAM Lite - select new name for "fat free" portion of PAM referencing specific transactions
  • PIV Grouped and Non-Grouped DEC actors
  • CPs developed as we progress from here: assure all are on the same page, save CP submission until March
  • Other technical developments
- Availability of last year's samples and MWB efforts ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/Yr3-2009/Yr3-PreConnectathonTesting/
- Pre-Connectathon, Virtual Connectathon, Connectathon testing
- NIST's support
  • Connectathon
- Registration for Connectathon and Showcase is open until the end of the month
- Participating Companies and Profiles/Actors (spreadsheets)
- Correction - companies NEED NOT be IHE members
- Recruiting additional companies as full participants and recruiting for New Directions
- Pre-Connectathon Tests
o MWB and NIST Test Tools - availability, scope, requirements
+ Please post ASAP to assist your test partners
- Message Workbench Training - scheduling tutorials with Peter Rontey (VA)
o MWB files are at ftp://ftp.ihe.net/Patient_Care_Devices/Tools/MWB/MWB%20v%201.6.8.2/
- PCD F2F October 5-9 - please RSVP and make hotel reservations
- Review, update PIV Pre-Connectathon Tests
- Develop IDCO Pre-Connectathon Tests
- Other

|

Agenda Ninth meeting September 29, 3 pm EDT PCD Connectathon&Showcase 2009-09-29 Webex changes welcome

  • Review of previous meeting Discussion Summary PCD Connectathon&Showcase 2009-09-22 Webex
  • Connectathon Kudu registration and HIMSS10 indications
  • Remaining ADT Issues
  • Update on Grouped and Non-Grouped actors
  • Update: Assuring CPs developed as we progress are adopted by all developers affected.
  • Other technical developments
- Availability of this year's samples and MWB efforts ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/
- Pre-Connectathon, Virtual Connectathon, Connectathon testing
- Message Workbench Training - tutorial Oct. 2 with Peter Rontey (VA)
o MWB files are at ftp://ftp.ihe.net/Patient_Care_Devices/Tools/MWB/MWB%20v%201.6.8.2/
- NIST's test tools
o Tutorial following F2F
- Update on Pre-Connectathon Tests
  • Connectathon
- Registration for Connectathon and Showcase is open until the end of the month
- Participating Companies and Profiles/Actors (spreadsheets)
- Recruiting additional companies as full participants and recruiting for New Directions
- PCD F2F October 5-9 - please RSVP and make hotel reservations

|:

October 2009 Meetings

|

Agenda - Special Tenth meeting - October 2, 11 am EDT PCD Connectathon&Showcase 2009-10-02 Webex Message Workbench Training with Peter Rontey of the VA

|

Agenda Eleventh meeting October 13, 3 pm EDT PCD Connectathon&Showcase 2009-10-13 Webex

  • Review of previous meeting Discussion Summary PCD Connectathon&Showcase 2009-09-29 Webex
  • Connectathon Kudu registration and HIMSS10 indications
  • Issues with Profile TIs, MWB item - from participants
  • Remaining ADT Issues
  • Update on Grouped and Non-Grouped actors
  • Update: Assuring CPs developed as we progress are adopted by all developers affected.
  • Other technical developments
- Availability of this year's samples and MWB efforts ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/
- Pre-Connectathon, Virtual Connectathon, Connectathon testing
- Message Workbench Training - Part I tutorial Oct. 2 with Peter Rontey (VA) is not available
- MWB Training - Part II tutorial Oct. 16 at 11 am EDT
o MWB files are at ftp://ftp.ihe.net/Patient_Care_Devices/Tools/MWB/MWB%20v%201.6.8.2/
- NIST's test tools
o Tutorial October 19 11 am EDT
- Update on Pre-Connectathon Tests
  • Connectathon
- Registration for Connectathon and Showcase closed
- Participating Companies and Profiles/Actors (spreadsheets)
- Recruiting additional companies as full participants and recruiting for New Directions

|:

Agenda Special Twelfth meeting - MWB Tutorial Part II October 16

  • Meeting was recorded. The link is posted above.

Agenda Special Thirteenth meeting - NIST Test Tools Tutorial October 19

Agenda Fourteenth Meeting October 20, 3 pm EDT PCD Connectathon&Showcase 2009-10-20 Webex

- How to post results from NIST and Virtual Connectathon tests TBD
- Post Successfully Tested Messages with explanatory README files as needed. Each system has a distinct folder under each profile implemented. Please post sending messages as early as possible. The Virtual Connectathon tests will use the Internet unless firewall issues prevent these tests. In that case these tested, posted, messages will substitute from the sending systems.
- ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/YR4-2010Connectathon-PreConnectathonTesting/SampleMessages/
- Test results are due December 1; however Thanksgiving is November 26; for many the effective deadline is November 25.
  • Connectathon Kudu registration and HIMSS10 indications
- Your electrial requirements should be sent directly to the contractor at the hotel. There is a service kit with that information available at http://www.ihe.net/north_america/connectathon_na2010_participants.cfm
  • Issues with Profile TIs, MWB item - from participants
  • Remaining ADT Issues
  • Update on Grouped and Non-Grouped actors
  • Update: Assuring CPs developed as we progress are adopted by all developers affected.
  • Other technical developments
- NIST's test tools - slides, recordings
  • Connectathon
- Registration for Connectathon and Showcase closed - any issues remaining?
- Excel Status Workbook
  • Showcase - Update
- Task Force Report

|:

Agenda Fifteenth Meeting October 27, 3 pm EDT PCD Connectathon&Showcase 2009-10-27 Webex

- How to post results from NIST and Virtual Connectathon tests
- Post Successfully Tested Messages with explanatory README files as needed. Each system has a distinct folder under each profile implemented. Please post sent messages as early as possible.
  • The Virtual Connectathon tests will use the Internet unless firewall issues prevent these tests. In that case tested, posted, messages will substitute for the sending systems.
- ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/YR4-2010Connectathon-PreConnectathonTesting/SampleMessages/
  • MWB Part 1 Tutorial this Friday, 11 am EDT.
  • Issues with Profile TIs, MWB and NIST test tools - from participants
  • Wireless communications at the Connectathon and Showcase
- Coordinate with Steve Moore if the wireless folks need fixed IP addresses.
- Coordinate with Matt Barth on network infrastructure. Matt is doing both connectathon and showcase again.
  • Remaining ADT Issues
  • Other technical developments
  • Connectathon
- Excel Status Workbook
  • Showcase - Update
- Task Force Report

Agenda Special Sixteenth meeting - MWB Tutorial Part I October 30

  • Meeting was recorded. The link is posted above.

November 2009 Meetings

Agenda Seventeenth Meeting November 3, 3 pm EDT PCD Connectathon&Showcase 2009-11-03 Webex

Pre-Connectathon Tests

  • Status of test documents
- PIV, IDCO out for review
- DEC, ACM updates by Monday; no major changes expected
- RTM compliance anticipated; no negative responses received
  • Questions about posting results on Kudu, PCD ftp site (results from MWB testing)
- Post Successfully Tested Messages with explanatory README files as needed. Each system has a distinct folder under each profile implemented. Please post sending messages as early as possible. The Virtual Connectathon tests will use the Internet unless firewall issues prevent these tests. In that case these tested, posted, messages will substitute from the sending systems.
- To upload: Obtain access to the ftp site from the project manager.
- ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/YR4-2010Connectathon-PreConnectathonTesting/SampleMessages/
  • Update on NIST and Virtual Connectathon tests
  • MWB Part 1 Tutorial last Friday, recording available
  • Issues with Profile TIs, MWB item - from participants
  • Remaining ADT Issues
  • Other technical developments

Connectathon

  • Wireless communications at the Connectathon and Showcase
- Coordinate with Steve Moore if the wireless folks need fixed IP addresses.
- Coordinate with Matt Barth on network infrastructure. Matt is doing both connectathon and showcase again.
  • Excel Status Workbook
  • New Directions ACM testing at the Connectathon - set data
  • Continua testing at the Connectathon

Showcase - Update

  • Task Force Update
- Meeting yesterday
- Scheduling weekly meetings
  • Continua link to PCD

Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en

Other

Agenda Eighteenth Meeting November 10, 3 pm EDT PCD Connectathon&Showcase 2009-11-10 Webex

Pre-Connectathon Tests
- One document for PIV and one for IDCO have been out for review and significant changes made during multiple iterations. The IOC Pre-Connectathon tests have been distributed and posted. The IDCR should be finalized this week.
- DEC, ACM updates were anticipated by Monday and are delayed; no major changes expected. The latest versions are:
DEC: Last year's tests are available in this year's folder; Manny to review once more.
ACM: Last year's tests are available in this year's folder; Manny to review once more.
- Grouped PIB actors - testing and Integration Statement documentation as grouped actors
- RTM compliance anticipated; EUI-64 vendor portion - values requested
  • Questions about posting results on Kudu, PCD ftp site (results from MWB testing) - password and instructions available
- Post Successfully Tested Messages with explanatory README files as needed. Each system has a distinct folder under each profile implemented. Please post sending messages as early as possible. The Virtual Connectathon tests will use the Internet unless firewall issues prevent these tests. In that case these tested, posted, messages will substitute from the sending systems.
- ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/YR4-2010Connectathon-PreConnectathonTesting/SampleMessages/
  • Update on NIST and Virtual Connectathon tests
  • Issues with Profile TIs, MWB item - from participants
  • Remaining ADT Issues
- Volunteer need to submit a CP for the ACK in DEC
  • Other technical developments
- MSH-21 OID – would the OID provided in Wiki page by John Rhoads be the appropriate OID? For this year, use the OID without extension or assign one to each profile?
Connectathon
  • Wireless communications at the Connectathon and Showcase
- Coordinate with Steve Moore if the wireless folks need fixed IP addresses.
- Coordinate with Matt Barth on network infrastructure. Matt is doing both connectathon and showcase again.
  • Excel Status Workbook
Showcase - Update
  • Task Force Update
- Scheduling weekly meetings
- Defining the messages for each wall; the "one page" descriptions
Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
Other

Agenda Nineteenth Meeting November 17, 3 pm EDT PCD Connectathon&Showcase 2009-11-17 Webex

Pre-Connectathon Tests
  • Status of test documents
- PIV, IDCO out for review
- DEC v. 3.4 issued
- ACM updates this week; no major changes expected
- RTM compliance anticipated; no negative responses received
  • Posting results on Kudu, PCD ftp site (results from MWB testing)
- Post Successfully Tested Messages with explanatory README files as needed. The NIST and Virtual Connectathon test results are not posted, merely require an email to the project manager indicating success.
- ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/YR4-2010Connectathon-PreConnectathonTesting/SampleMessages/
  • Waivers are available for MWB tests based upon past success with the same systems for the same tests.
  • Update on NIST and Virtual Connectathon tests
  • Issues with Profile TIs, MWB item - from participants
  • Remaining ADT Issues
  • Other technical developments
Connectathon
  • Wireless communications at the Connectathon and Showcase
- Coordinate with Steve Moore if the wireless folks need fixed IP addresses.
- Coordinate with Matt Barth on network infrastructure. Matt is doing both connectathon and showcase again.
  • Excel Status Workbook
Showcase - Update
  • MRN, Bar Code, Badges - Is MRN sufficient? No name?
  • Task Force Update
- Meeting yesterday addressing PCD's messages, scenarios
- Beginning design of structures; request for physical requirements
Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
Other

Agenda Twentieth Meeting November 24, 3 pm EDT PCD Connectathon&Showcase 2009-11-24 Webex Placeholder

Pre-Connectathon Tests
  • Status of test documents
- PIV, IDCO out for review
- DEC v. 3.4 issued
- ACM updates this week; no major changes expected
- RTM compliance anticipated; no negative responses received
  • Posting results on Kudu, PCD ftp site (results from MWB testing)
- Post Successfully Tested Messages with explanatory README files as needed. The NIST and Virtual Connectathon test results are not posted, merely require an email to the project manager indicating success.
- ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/YR4-2010Connectathon-PreConnectathonTesting/SampleMessages/
  • Waivers are available for MWB tests based upon past success with the same systems for the same tests.
  • Update on NIST and Virtual Connectathon tests
  • Issues with Profile TIs, MWB item - from participants
  • Remaining ADT Issues
  • Other technical developments
Connectathon
  • Wireless communications at the Connectathon and Showcase
- Coordinate with Steve Moore if the wireless folks need fixed IP addresses.
- Coordinate with Matt Barth on network infrastructure. Matt is doing both connectathon and showcase again.
  • Excel Status Workbook
Showcase - Update
  • Task Force Update
- Meeting yesterday addressing PCD's messages, scenarios
- Beginning design of structures; request for physical requirements
Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
Other

December 2009 Meetings

Agenda Twenty-First Meeting December 1, 3 pm EST PCD Connectathon&Showcase 2009-12-01 Webex

Pre-Connectathon Tests
  • Status of test documents
- ACM issues raised by Monroe
  • Posting results on Kudu, PCD ftp site (results from MWB testing) - as soon as possible
- Post Successfully Tested Messages with explanatory README files as needed. The NIST and Virtual Connectathon test results are not posted, merely require an email to the project manager indicating success.
- ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/YR4-2010Connectathon-PreConnectathonTesting/SampleMessages/
  • Waivers are available for MWB tests based upon past success with the same systems for the same tests.
  • Update on NIST and Virtual Connectathon tests
- Recruiting PAM, PDQ Sources
  • Issues with Profile TIs, MWB item - from participants
  • Remaining ADT Issues
  • Other technical developments
Connectathon
  • Wireless communications at the Connectathon and Showcase
- Coordinate with Steve Moore if the wireless folks need fixed IP addresses.
- Coordinate with Matt Barth on network infrastructure. Matt is doing both connectathon and showcase again.
  • Excel Status Workbook
Showcase - Update
  • New Drawings for Next Week
- Physical requirements and utilities
  • Task Force Update
- Meeting Friday for Pacemaker Scenario
- Beginning design of structures; request for physical requirements
Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
Other

Agenda Twenty-Second Meeting December 8, 3 pm EST PCD Connectathon&Showcase 2009-12-08 Webex

Pre-Connectathon Tests
  • ADT: Can we eliminate the need for PCD-specific PAM, PDQ sources this year?
- Look ahead to next year
  • Update on NIST and Virtual Connectathon tests
- Recruiting PAM, PDQ Sources
  • Issues with Profile TIs, MWB item - from participants
  • Remaining ADT Issues
  • Other technical developments
Connectathon
  • Wireless communications at the Connectathon and Showcase
- Coordinate with Steve Moore if the wireless folks need fixed IP addresses.
- Coordinate with Matt Barth on network infrastructure. Matt is doing both connectathon and showcase again.
  • Excel Status Workbook - any revisions? missing contact information (cell phones)
  • Table layout, power and network requirements (e.g., more than one Ethernet IP address)
Showcase - Update
  • Task Force Update
- Meeting lst Friday for Pacemaker Scenario
- Beginning design of structures; request for physical requirements
Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
Other


Agenda Twenty-Third Meeting December 15, 3 pm EST PCD Connectathon&Showcase 2009-12-15 Webex

Pre-Connectathon Tests
  • Survey of Lessons Learned and Potential Improvements
  • Issues with Profile TIs, MWB item - from participants
  • Other technical developments
Connectathon
  • Process, training, what to bring
  • Wireless communications at the Connectathon and Showcase
- Coordinate with Steve Moore if the wireless folks need fixed IP addresses.
- Coordinate with Matt Barth on network infrastructure. Matt is doing both connectathon and showcase again.
  • Excel Status Workbook
  • Remaining ADT Issues
Showcase - Update
  • Task Force Update
  • Design of structures; request for physical requirements
Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
Other


Agenda Twenty-Fourth Meeting December 22, 3 pm EST PCD Connectathon&Showcase 2009-12-22 Webex placeholder

Pre-Connectathon Tests
  • Survey of Lessons Learned and Potential Improvements
  • Issues with Profile TIs, MWB item - from participants
  • Other technical developments
Connectathon
  • Process, training, what to bring
  • Wireless and Ethernet communications at the Connectathon and Showcase
- Contact Steve if external access is required
  • Remaining ADT Issues
Showcase - Update
  • Task Force Update
  • Design of structures; request for physical requirements
Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
Other

January 2010 Meetings

Agenda Twenty-Fifth Meeting January 5, 3 pm EST PCD Connectathon&Showcase 2010-01-05 Webex placeholder

Pre-Connectathon Tests
  • Survey of Lessons Learned and Potential Improvements
  • Issues with Profile TIs, MWB item - from participants
  • Other technical developments
Connectathon
  • Process, training, what to bring
  • Wireless and Ethernet communications at the Connectathon and Showcase
- Contact Steve if external access is required
  • Remaining ADT Issues
Showcase - Update
  • Task Force Update
  • Design of structures; request for physical requirements
Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
Other

Agenda Twenty-Sixth Meeting January 19, 3 pm EST PCD Connectathon&Showcase 2010-01-19 Webex preliminary

Pre-Connectathon and Connectathon Tests and Processes
  • Survey of Lessons Learned and Potential Improvements
  • Issues with Profile TIs, MWB item - from participants
  • Other technical developments
Showcase - Update
  • Task Force Update
  • Design of structure
  • Showcase Scenarios, Scripts
Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
Other


Agenda Twenty-Seventh Meeting January 26, 3 pm EST PCD Connectathon&Showcase 2010-01-26 Webex placeholder

Pre-Connectathon and Connectathon Tests and Processes
  • Survey of Lessons Learned and Potential Improvements
  • Issues with Profile TIs, MWB item - from participants
  • Other technical developments
Showcase - Update
  • Task Force Update
  • Design of structure
  • Showcase Scenarios, Scripts
Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
Other

2009-10 Calendar

This includes placholders; lines preceded with * provide current knowledge of dates This is intended as a work in progress, with milestones added or modified throughout the cycle. Dates to be assigned.

  • Connectathon Registration August 28 - September 30, 2009
  • Showcase Registration August 28 - September 30, 2009
  • Connectathon January 11-15, 2010 (plan to arrive no later than the 10th)
  • Showcase March 1-4, 2010 (watch for date for setup, likely the Saturday before)
Development of Test Concepts with the Profile WGs - ____
Development of the Pre-Connectathon Tests (MWB and NIST tools) to qualify systems for the Virtual and actual Connectathons
Development of Virtual Connectathon Procedures, Tests
Development of Connectathon Tests
Reporting successful completion of Pre-Connectathon Qualifying Tests (initial qualifying MESA test, PCD profile tests)
Conduct of Virtual Connectathon Testing and reporting results
Submission of networking requirements to Steve Moore - Nov. ___ with MAC addresses due to Steve by ___
Definition of Scenario for Showcase - Rough draft __
Final Scenario for Showcase
Design of Showcase Space
Definition of space, utility and other requirements for the Showcase


Links to PCD Home and Meetings

PCD Home