PCD Connectathon&Showcase WG 2008-9

From IHE Wiki
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

This is the entry point for this Working Group in the 2008-9 Connectathon and HIMSS Showcase cycle.

Meeting Purpose

Collaborative effort to discuss implementation and demonstration issues and preparations

Related Pages and Documents

PCD Pre-Connectathon Testing 2009

PCD Virtual Connectathon Testing 2009

PCD Showcase 2009 Scenario

WebEx Information

Topic: PCD Connectathon and Showcase Working Group

Dates: Most Wednesdays, October through April

Time: 4 pm, Eastern Time (New York )

Duration: 60 Minutes

Proposed Agendas October, November

1 First meeting PCD Connectathon&Showcase 2008-10-08 Webex, potential agenda items:

  • Introductions
  • Review of meeting purpose
  • Consideration of Wiki page(s) for minutes, action items, Scenario (e.g., one page or one page per meeting)
  • Summary of preparation process
  • Development of a calendar
  • Mandatory workshop Oct. 29-31
  • List of profiles, actors
  • Brief description of the MWB and its uses
  • Reminder of MWB tutorial Oct. 10
  • Review of testing concepts developed to date
  • Developing Scenario(s)
  • Process, timetable, tools

2 Second meeting PCD Connectathon&Showcase 2008-10-15 Webex, potential agenda items

Action Items (see below, this page)
Wiki pages review
  • Summaries of meetings will be posted and available for members to correct/add to.
  • Wiki page to collect recommendations for changes to profiles
Connectathon and Showcase Planning
  • Discussion of potential Scenario
  • Recommendation for patient flow and clinical site (OR, ICU, etc.) sequence
  • How might middleware be demonstrated?
Pre-Connectathon Test Cases update
  • DEC to be reviewed by participants
  • PIV reviewed, reformatted
  • ACM target mid-November
  • RTM as part of DEC testing

3 HIMSS Showcase Workshop breakout meeting notes with links to the entire Workshop

http://wiki.ihe.net/index.php?title=IHE_PCD_2009_Showcase_Workshop_2008-10-28_to_30

4 Third meeting PCD Connectathon&Showcase 2008-11-05 Webex, potential agenda items

Action Items (see below, this page)
  • Open Date: Monitor registrations for various actors.
  • Nov. 5: Determine how RTM will be tested in Pre-Connectathon, Virtual Connectathon, and Connectathon.
Likely to select a number of parameters, etc. for testing this year
Relatively small addition to one or two tests for each profile
  • Oct. 15: Why are more companies not implementing SPD query within DOC? Which companies will implement and test this query this year?
Issues and questions about:
  • The Trial Implementation version of any profiles
  • The MWB
Those needing the introductory Tutorial should contact Peter
November 17, 1 pm EST looks likely for the Advanced
  • HL7
  • Timeline
  • Interview Form, Kudu, Installation Test (PAM, PDQ)
Connectathon and Showcase Planning
  • Connectathon and earlier tests
Scenario update, see below, and
  • How would we demo in the short time available?
  • Should we plan on a stronger Docent/Tour Leader role for continuity?
Status report on Test Case development
  • DEC
  • ACM
  • PIV
  • RTM


5 Fourth meeting PCD Connectathon&Showcase 2008-11-12 Webex

Showcase Planning

  • Structure Census Review
How will we display RTM and the new profiles under development?

Connectathon Planning

  • Steve Moore's webinar this afternoon
  • Status report on Test Case development
  • DEC
  • ACM
  • PIV
  • RTM

Issues and questions about:

  • The Trial Implementation version of any profiles
  • The MWB
  • HL7
  • Timeline
  • Kudu, Installation Test (PAM, PDQ)


6 Fifth meeting PCD Connectathon&Showcase 2008-11-19 Webex

Action Items (see below, this page)

Issues and questions about:

  • The Trial Implementation version of any profiles
  • The MWB
Message Workbench Advanced Tutorial took place November 17. It was recorded.
To view the Webinar, go to https://ihe.webex.com/ihe/lsr.php?AT=pb&SP=MC&rID=28385312&rKey=E3D0394C8A8A1D8D
  • HL7
  • Timeline
  • Kudu, Installation Test (PAM, PDQ)
  • RTM Validation
  • Pre-Connectathon and Virtual Connectathon Testing

Connectathon Planning

  • Status report on Test Case development
  • DEC
  • ACM
  • PIV
  • RTM
  • Other
Capsule device parameters
Cerner device parameters
ADT and PIV

Showcase Planning

Suggestions offered by Jeff Rinda, Scott
  • Wall layout, census - sequence revision
  • Equipment inventory

Proposed Agendas December 2008

7 Sixth meeting PCD Connectathon&Showcase 2008-12-03 Webex

Action Items
Issues and questions about:
  • The Trial Implementation version of any profiles
  • The MWB
  • HL7
- Version 2.6 vs 2.5
  • Kudu for Pre-Connectathon and Connectathon testing
- PAM, PDQ testing

Connectathon Planning

  • Status report on Test Case development
Pre-Connectathon, Virtual Connectathon, Connectathon
  • DEC with PIB and SPD
  • ACM
  • PIV
  • RTM

Showcase Planning

  • Structure
- Drawings
- Utilities (electric, network)
- Physical requirements (size, mounts if larger, etc)
- Wireless requirements for Connectathon and Showcase
- Logos - one per company - which sides?
- How will we display RTM and the new profiles under development?

Timeline


8 Seventh meeting PCD Connectathon&Showcase Focused 2008-12-10 Webex

Please see the meeting Wiki for the agenda which focused on

Visitor/patient ID
Device, medication ID
Use of the ADT system, Epic and GE providing paper patient demographics, A04 messages
Other items


9 Eighth meeting PCD Connectathon&Showcase 2008-12-10 Webex

Action Items (see below, this page)
Issues and questions about:
  • The Trial Implementation version of any profiles
  • Registration update; PIV registrations of DEC as option or full listing
  • The MWB
  • HL7
-Version 2.6 vs 2.5
  • Kudu, Installation Test, CT and PAM, PDQ
-PAM, PDQ for PCD alone - see the DOR tests; for complete PAM, PDQ see MESA tests
  • Visitor/patient, caregiver, device ID; follow up to earlier special meeting if necessary
Connectathon and Showcase Planning
  • Welcome to Surgical Information Systems
  • Scenario update
-Wiki page for Scripts
  • Showcase Structure
-Drawings, only minor changes are required
-Utilities (electric, network)
-Physical requirements (size, mounts if larger, etc)
-Logos - one per company - which sides?
  • Status report on Test Case development for Pre-Connectathon, Virtual Connectathon, Connectathon
- DEC - revised 2008 version out for review for Pre-Connectathon, Connectathon tests
Decision on which tests to use for Virtual Connectathon will follow
- ACM - concept out for review
- PIV - concept has been reviewed, request drug information
- RTM - NIST
  • Will be entered into Kudu ASAP for Pre-Connectathon and Connectathon testing
- Virtual Connectathon testing is separate from these
  • Timeline


10 Ninth meeting PCD Connectathon&Showcase 2008-12-17 Webex

Action Items (see below, this page)
Issues and questions about:
  • The Trial Implementation version of any profiles
  • Registration update; PIV registrations of DEC as option or full listing
  • The MWB
  • HL7
-Version 2.6 vs 2.5
  • Kudu
-PAM, PDQ for PCD alone - see the DOR tests; for complete PAM, PDQ see MESA tests
  • Visitor/patient, caregiver, device ID; follow up to last week's special meeting if necessary
  • Report any discrepancies on tests listed for your systems to Manny
Connectathon Planning
  • Status report on Test Case development for Pre-Connectathon, Virtual Connectathon, Connectathon
-DEC - revised 2008 version out for review for Pre-Connectathon, Connectathon tests
Decision on which tests to use for Virtual Connectathon will follow
-ACM - concept out for review
-PIV - concept has been reviewed, request drug information
-RTM - NIST
  • Will be entered into Kudu ASAP for Pre-Connectathon and Connectathon testing
-Virtual Connectathon testing is separate from these
Showcase Planning
  • Scenario update
- Wiki page for Scripts
- Ruth's questions; can we use the patient's name, sex and preload other data?
  • Showcase Structure
- Drawings, only minor changes are required
- Utilities (electric, network)
- Physical requirements (size, mounts if larger, etc)
- Logos - one per company - which sides?
  • Fourth Wall - what will we do with it?
  • Timeline

Proposed Agendas January 2009

11 Tenth meeting PCD Connectathon&Showcase 2008-01-07 Webex PCD Connectathon&Showcase 2009-01-07 Webex

Action Items
Issues and questions about:
  • The MWB
  • HL7
  • Kudu, Connectathon, Showcase
- PAM, PDQ for PCD alone - see the DOR tests; for complete PAM, PDQ see MESA tests
- MRNs as numeric or alpha
- Questions raised for John Donnelly
  • Visitor/patient; second special meeting
  • Report any discrepancies on tests listed for your systems to Manny
Connectathon Planning
  • Status report on Test Case development for Pre-Connectathon, Virtual Connectathon, Connectathon
- DEC - revised 2008 version
- ACM -
- PIV -
- RTM -
  • Decision on which tests to use for Virtual Connectathon and Connectathon
  • Scheduling the Virtual Connectathon
  • NIST validation of RTM
Showcase Planning
  • Scenario update
-Wiki page for Scripts
  • Showcase Structure
- Drawings, only minor changes are required
- Utilities (electric, network)
- Physical requirements (size, mounts if larger, etc)
- Logos -
- Signs thanking supporters
Timeline


12 Eleventh meeting PCD Connectathon&Showcase 2008-01-14 Webex PCD Connectathon&Showcase 2009-01-14 Webex

Please add to the list

Action Items
Issues and questions about:
  • The MWB
  • HL7
  • Kudu, Connectathon, Showcase
- When will results be posted to Kudu?
- PAM, PDQ for PCD alone - see the DOR tests; for complete PAM, PDQ see MESA tests
- MRNs may be alpha
- Review discussion with John Donnelly, including Kiosk (printer, laptop), preload visitor data (DOB), etc.
  • Report any discrepancies on tests listed for your systems to Manny
Connectathon Planning
  • Status report on Test Case development for Pre-Connectathon, Virtual Connectathon, Connectathon
- DEC - minor changes to come
- ACM - meeting on Thursday
- PIV - updated version posted
- RTM -
- Watch emails for additional changes
  • Decision on which tests to use for Virtual Connectathon and Connectathon
  • Scheduling the Virtual Connectathon
  • NIST validation of RTM
Showcase Planning
  • Scenario update
-Wiki page for Scripts
  • Showcase Structure
- Drawings, only minor changes are required
- Utilities (electric, network)
- Physical requirements (size, mounts if larger, etc)
- Logos -
- Signs thanking supporters
Timeline


13 Twelfth meeting PCD Connectathon&Showcase 2008-01-21 Webex PCD Connectathon&Showcase 2009-01-21 Webex

NOTE: Access to this Webex is unique; look for the email; this meeting will include a section led by John Donnelly

Action Items
Showcase Review - John Donnelly
  • System Assignments
  • Assignments – identifying your partners,
- Tours - should we rethink the concepts?
  • Profiles - identification of specific profile requirements
  • ADT for PIB – NOT for those implementing and testing ITI PAM, PDQ
  • Virtual Testing – Pre-Connectathon
  • IP address, ports required
  • Connectathon –
  • IP address, ports
  • Showcase Virtual Connectathon and Rehearsal at the Connectathon
  • Monitoring progress, issues through the rest of the process
  • Showcase Internet connections
  • Q and A
  • Risk Assessment

14 Thirteenth meeting PCD Connectathon&Showcase 2008-01-28 Webex PCD Connectathon&Showcase 2009-01-28 Webex

Please add to the list

Action Items
Issues and questions about:
  • The MWB
  • HL7
- EUI-64
- v 2.5 vs. 2.5.1
  • Kudu, Connectathon, Showcase
- PAM, PDQ for PCD alone - see the DOR tests; for complete PAM, PDQ see MESA tests
  • Report any discrepancies on tests listed for your systems to Manny
Connectathon Planning
  • Status report on Test Case development for Pre-Connectathon, Virtual Connectathon, Connectathon
  • Status report on Grading the tests
- DEC -
- ACM -
- PIV -
- RTM -
  • ADT for PIB – NOT for those implementing and testing ITI PAM, PDQ
  • Decision on which tests to use for Virtual Connectathon and Connectathon
- Wiki page is available for recording Virtual Connectathon results
- Can you test with two patients' data (e.g., two beds, two ARs or one AR with two patients)?
  • NIST validation of RTM
Showcase Planning
  • Scenario update
  • System Assignments
  • Assignments – identifying your partners,
- Tours - rethinking the concepts
  • Showcase Internet connections
  • Showcase Virtual Connectathon and Rehearsal at the Connectathon
  • Monitoring progress, issues through the rest of the process
- Risk Assessment
-Wiki page for Scripts
  • Showcase Structure
- Drawings, only minor changes are required
- Utilities (electric, network)
- Physical requirements (size, mounts if larger, etc)
- Logos -
- Signs thanking supporters
Timeline

Proposed Agendas February 2009

15 Special Meeting: Resolution of remaining ADT issues with John Donnelly PCD Connectathon&Showcase 2009-02-02


16 14th regular meeting PCD Connectathon&Showcase 2008-02-04 Webex PCD Connectathon&Showcase 2009-02-04 Webex


Please add to the list

Action Items
Issues and questions about:
  • The MWB
  • HL7
- EUI-64
  • Kudu, Connectathon, Showcase
- PAM, PDQ for PCD alone - see the DOR tests; for complete PAM, PDQ see MESA tests
  • Report any discrepancies on tests listed for your systems to Manny
Connectathon Planning
  • Status report on Test Case development, results for Pre-Connectathon, Virtual Connectathon, Connectathon
- DEC -
- ACM -
- PIV -
- RTM -
  • ADT for PIB – NOT for those implementing and testing ITI PAM, PDQ
  • Decision on which tests to use for Connectathon
- Wiki page is available for recording Virtual Connectathon results
- Can you test with two patients' data (e.g., two beds, two ARs or one AR with two patients)?
  • NIST validation of RTM
Showcase Planning
  • Scenario update
  • System Assignments
  • Assignments – identifying your partners,
- Tours - rethinking the concepts
  • Showcase Internet connections
  • Showcase Virtual Connectathon and Rehearsal at the Connectathon
  • Monitoring progress, issues through the rest of the process
- Risk Assessment
-Wiki page for Scripts
  • Showcase Structure
- Drawings, only minor changes are required
- Utilities (electric, network)
- Physical requirements (size, mounts if larger, etc)
- Logos -
- Signs thanking supporters
Timeline


17 15th regular meeting PCD Connectathon&Showcase 2009-02-11 Webex PCD Connectathon&Showcase 2009-02-11 Webex


Please add to the list

Action Items
Issues and questions about:
  • HL7 coding
- EUI-64
  • Kudu, Connectathon, Showcase
  • Any discrepancies on tests
Connectathon Planning
  • Status report on tests for Connectathon
- Wiki page is available for recording Virtual Connectathon results
- Can you test with two patients' data (e.g., two beds, two ARs or one AR with two patients)?
  • NIST validation of RTM
Showcase Planning
  • Scenario update
  • System Assignments - identifying your partners,
- Tours - rethinking the concepts
  • Showcase Internet connections
  • Showcase Virtual Connectathon and Rehearsal at the Connectathon
  • Monitoring progress, issues through the rest of the process
- Risk Assessment
-Wiki page for Scripts
  • Showcase Structure
- Drawings, only minor changes are required
- Utilities (electric, network)
- Physical requirements (size, mounts if larger, etc)
- Logos -
- Signs thanking supporters
Timeline


18 16th regular meeting PCD Connectathon&Showcase 2009-02-18 Webex PCD Connectathon&Showcase 2009-02-18 Webex

Please add to the list

Action Items
Issues and questions about:
  • Monroe experienced a time out problem with the MWB.
  • Appropriate dosing units for drugs
  • HL7 coding
- EUI-64
  • Kudu, Connectathon, Showcase
  • Any discrepancies on tests
Connectathon Planning
  • Status report on tests for Connectathon
  • Schedule - set up begins Monday at 8, testing at 10 am
  • NIST validation of RTM
  • Dress code
Showcase Planning
  • Scenario update
  • System Assignments - identifying your partners,
- Tours - rethinking the concepts
  • Showcase Internet connections
  • Showcase Rehearsal at the Connectathon
  • Monitoring progress, issues through the rest of the process
- Risk Assessment
-Wiki page for Scripts:
Showcase Planning
  • Scenario update
  • System Assignments - identifying your partners,
- Tours - rethinking the concepts
  • Showcase Internet connections
  • Showcase Rehearsal at the Connectathon
  • Monitoring progress, issues through the rest of the process
- Risk Assessment
-Wiki page for Scripts
  • Dress code
  • Showcase Structure
- Drawings
- Logos
- Signs thanking supporters
Timeline

19 Special Meeting to Discuss Scenario Friday, February 20 11 am EST

Proposed Agendas March 2009

20 17th regularly scheduled meeting PCD Connectathon&Showcase 2008-03-04 Webex PCD Connectathon&Showcase 2009-03-04 Webex

Action Items
Lessons learned leading up to and through the Connectathon
  • Pre-Connectathon process and tests
  • Virtual Connectathon process and tests
  • Connectathon process and tests
  • Change proposals
Issues and questions about:
  • HL7 coding
- EUI-64
  • RTM update
  • NIST validation of RTM
Showcase Planning
  • Scenario update
- Parameter identification, values
  • System Assignments - identifying your partners
- Shared equipment list - monitors, IV poles
  • Docents - to provide one docent for each wall we need more docents
  • Dress at the Showcase - role play?
  • Showcase Internet connections
  • Showcase Rehearsal at the Connectathon
  • Showcase Structure
- Drawings
- Logos

21 18th regularly scheduled meeting PCD Connectathon&Showcase 2008-03-11 Webex PCD Connectathon&Showcase 2009-03-11 Webex

Showcase Planning
  • Scenario update
- Parameter identification, values
  • System Assignments - identifying your partners
- Shared equipment list - monitors, IV poles
  • Docents - to provide one docent for each wall we need more docents
  • Dress at the Showcase - role play?
  • Showcase Internet connections
  • Showcase Rehearsal at the Connectathon
Issues and questions about:
  • HL7 coding
- EUI-64
  • RTM update
  • NIST validation of RTM
  • Showcase Structure
- Drawings
- Logos


22 19th regularly scheduled meeting PCD Connectathon&Showcase 2008-03-18 Webex PCD Connectathon&Showcase 2009-03-18 Webex Placeholder

Showcase Planning
  • Scenario update
- Parameter identification, values
  • System Assignments - identifying your partners
- Shared equipment list - monitors, IV poles
  • Docents - to provide one docent for each wall we need more docents
  • Dress at the Showcase - role play?
  • Showcase Internet connections
  • Showcase Rehearsal at the Connectathon
Issues and questions about:
  • HL7 coding
- EUI-64
  • RTM update
  • NIST validation of RTM
  • Showcase Structure
- Drawings
- Logos


23 Docent Review of Script 2008-03-25

  • Met to review and update the script.

24 20th regularly scheduled meeting PCD Connectathon&Showcase 2008-03-25 Webex PCD Connectathon&Showcase 2009-03-25 Webex

Action Items
Showcase Planning
  • Handouts
- Contents
- Final March 24
  • Scenario update
- Parameter identification, values
  • GE Enterprise virtual testing
- Contingency Planning
  • IEEE video and interviews
  • Docents - we have a sufficient number; more docents would reduce workload on those who have volunteered
  • Dress at the Showcase - white coats, stethoscopes
  • Showcase Internet connections
  • Showcase Rehearsal at the Connectathon
- Schedule a reading for docents and rehearsals
  • Showcase Structure
- Drawings
- Logos
- New Directions Wall - contents

Proposed Agendas April 2009

24 21st regularly scheduled meeting PCD Connectathon&Showcase 2008-04-01 Webex PCD Connectathon&Showcase 2009-04-01 Webex Placeholder

Action Items
Showcase Planning
  • Handouts
  • Scenario update
  • GE Enterprise virtual testing
- Contingency Planning
  • IEEE video and interviews
  • Docents
  • Dress at the Showcase - white coats, stethoscopes
  • Showcase Rehearsal at the Connectathon
- Schedule rehearsals
  • Showcase Structure
- Drawings
- Logos
- New Directions Wall - contents


25 22nd regularly scheduled meeting PCD Connectathon&Showcase 2008-04-15 Webex PCD Connectathon&Showcase 2009-04-15 Webex

Showcase Planning
  • Lessons Learned
- Process post Connectathon
- Development of Script
- Development of Handouts
- Preparation and implementation on site, including docent preparation
  • PCD Showcase Concept for 2010
- Integration with other domains/profiles
- Physical structure
- Docents, tours
  • Other

2008-9 Calendar

This is intended as a work in progress, with milestones added or modified throughout the cycle. Dates to be assigned.

Development of Test Concepts with the Profile WGs - Dec. 21
Development of the Pre-Connectathon Tests (MWB and NIST tools) to qualify systems for the Virtual and actual Connectathons
Development of Connectathon Tests
Reporting successful completion of Pre-Connectathon Qualifying Tests (initial qualifying MESA test, PCD profile tests)
Conduct of Virtual Connectathon Testing and reporting results - No later than last two weeks of Jan.
Submission of networking requirements to Steve Moore - Dec. 17 with MAC addresses due to Steve by Jan. 15
Definition of Scenario for Showcase - Rough draft Jan. 6
Definition of space, utility and other requirements for the Showcase - Dec. 17

Action Items (Details in meeting notes)

Item (Due Dates are found on the latest meeting page):

from Jan. 21
  • Open Date: Monitor PCD Connectathon registrations periodically.
  • Jan. 28: (All) Consider a more effective way to communicate the IHE/PCD message, with fewer presentations.
  • Determine which systems provide comparable information within the storyline, even if they are unique in other ways.
  • Jan. 28: (Manny) Define data for preload, registration feed for visitors. Consider eliminating printers.
  • Jan. 28: (Manny) Address GE's concerns about staffing their Enterprise system.
  • Jan. 28: (Manny) Update on ADT/patient-visitor id and association with systems.
  • Update on ADT/patient-visitor id and association with systems. Focused meeting, include diagram and other information to be provided.
  • John Donnelly will address this as part of the Showcase focused portion of this meeding.
  • Check with Bill Klaver, John Donnelly, and Steve Moore. A04 will work this year
  • Verify that we will have an A04 message this year. Request preloaded data (medication order, demographics).
  • Provide material for the Scenario (outline or brief description) to be followed by Manny compiling a single view.
  • Identify overarching message (e.g., patient safety. Note that Ray presented the stakeholder survey which showed
  • Survey Slide #17, "Improved Patient Care and Safety" was by far the greatest "incentives for IHE integration"; #2 was "Long term cost reduction"; #3 was improved workflow
  • Workshop discussion suggested we focus on these, with 5 rights, remote alarm communication among the specifics
  • Zebra has agreed to provide printers. We need to decide between two suggested models; determine if Epic can use the same Postscript printer Ruth provides; assure access to the registration kiosk.
  • Updates on how RTM will be tested in Pre-Connectathon, Virtual Connectathon, and Connectathon.
  • (Pump Vendors, Enterprise Systems) Vendors will provide their own approach to bar coding for drugs, infusions, patients and caregivers.
  • Created Wiki page for "virtual connectathon" on Connectathon '09 page. Will eventually include, partners, issues list / resolution, status, etc.
  • Identify the devices to be connected to middleware, the coding of parameters, identifying partners for testing and demonstration.
  • Coordinate ADT testing (Virtual and Connectathon) with Bill Klaver, coordinate with Steve Moore, John Donnelly, seek a backup system.
  • Update name for alarm product
  • Confirm structure diagrams and utilities
  • Define contents of fourth wall
  • Set PCD Docent training WebEx / on site (and run through at Connectathon)
  • Webex run through of draft Scenario
  • Update block diagram with locations of SIS, Cerner, Capsule
  • Steve Moore needs MAC addresses
  • Virtual Connectathon (tentative deadline for completion; partners may test anytime before this)
  • Determine if Cerner can support the AR actor in the Showcase.
  • Change proposal to PIB for ADT in PIB option.

Closed Action Items

  • Why are more companies not implementing SPD query within DOC? Which companies will implement and test this query this year?
  • Review items in http://wiki.ihe.net/index.php?title=IHE_PCD_2009_Showcase_Workshop_2008-10-28_to_30#Meeting_Purpose and determine which are transferred here.
  • Manny to contact Jim Higgins (Cerner) to coordinate Hill-Rom support. They provided a bed and a gurney in the past. Rita indicated that Cerner will coordinate Hill-Rom and Stryker beds and a gurney.
  • (Manny) Emails to Lisa with feedback on the Workshop
  • (Manny) Draft ACM tests ready for review - covered elsewhere
  • (Manny) HIMSS badge - MRN? - covered elsewhere
  • Ruth indicated that GE Enterprise includes the 5-rights data entry.
  • Special meeting was held to address ADT, other ID. Al had provided information about PAM, the need for A04 which is in ITI-31, not ITI-30, will be part of patient ID issue.
  • Colin FX (Epic) and Ruth (GE) offered approaches to support patient ID/registration requirements / issues from discussion.
  • (All) Patient IDs, ADT/PIB issues, device and caregiver ID are covered in other items on the list.
  • (Manny, pump vendors, any others) Wireless spectrum management. Didi is not supportive of addressing this throughout the convention hall, recommends approaching John Donnelly. Manny will contact John.
  • Emergin, LiveData) Connectathon on site testing with Polycom is scheduled for Thursday, Friday morning.
  • (Ruth) Does GE Enterprise include the 5-rights data entry?
  • Sarah Higgins identified contacts at Datamax and Zebra.
  • (Manny, pump vendors, any others) Wireless spectrum management. Didi is not supportive of addressing this throughout the convention hall, recommends approaching John Donnelly. Manny will contact John.
  • (Emergin, LiveData) Schedule Connectathon on site testing with Polycom
  • (Manny) Summarize focused meeting, include diagram.
  • (Bikram) Now unlikely to have bidirectional distributed demo - pushing data in from their booth to the demo.
  • (Pump Vendors, Enterprise Systems) Vendors will provide their own approach to bar coding for drugs, infusions, patients and caregivers.
  • Business card for Showcase w/ all companies listed + Booth numbers - the Showcase handout may address this.
  • Cerner added the AR actor.
  • (Manny) Created Wiki page for "virtual connectathon" on Connectathon '09 page. Will eventually include, partners, issues list / resolution, status, etc.
  • (Bikram, Rita/Jim Higgins) Identify the devices to be connected to middleware, the coding of parameters, identifying partners for testing and demonstration.
  • (Brett) Update name for alarm product
  • (Manny) Verify that we will have an A04 message this year. Request preloaded data (medication order, demographics).
  • Participants indicated they can test with two devices/patients' data (e.g., two pumps, two beds, two ARs or one AR with two patients)?
  • Structure:
- Utilities (electric, network)
- Physical requirements (size, mounts if larger, etc)
  • (All) The revised approach permits closing the following:
- Determine which systems provide comparable information within the storyline, even if they are unique in other ways.
- (All) Provide material for the Scenario (outline or brief description), consistent with the overarching message (e.g., patient safety. Note that Ray presented the stakeholder survey which showed
- Survey Slide #17, "Improved Patient Care and Safety" was by far the greatest "incentives for IHE integration"; #2 was "Long term cost reduction"; #3 was improved workflow
- Workshop discussion suggested we focus on these, with 5 rights, remote alarm communication among the specifics
  • (Manny) Define data for preload, registration feed for visitors. Consider eliminating printers.
  • (Manny) Address GE's concerns about staffing their Enterprise system.
  • Virtual Connectathon:
- ADT: Bill Klaver for Virtual Connectathon; John Donnelly, and Steve Moore for Connectathon and Showcase. A04 will work this year
  • (Manny) Final decision on printers.
  • (Pump Vendors, Enterprise Systems) Vendors will provide their own approach to bar coding for drugs, infusions, patients and caregivers.
  • (All) Confirm structure diagrams and utilities - hard deadline for PCD before the Connectathon.
  • Steve Moore needs MAC addresses
  • Comments on Virtual Connectathon experience - replaced with "lessons learned" scheduled for 3/4
  • Monroe experienced a time out problem with the MWB.
  • Monitor PCD Connectathon registrations periodically.
  • The Task Force will meet next Wednesday following the weekly meeting. A "reading" will be scheduled for Friday, Feb. 20 to prepare for the HIMSS Showcase rehearsal with equipment at the Connectathon.
  • First Webex run through of draft Scenario
  • Lessons learned leading up to and through the Connectathon
- Pre-Connectathon process and tests, Virtual Connectathon process and tests, Connectathon process and tests
  • Showcase Internet connections
- IP addresses - DHCP
  • Showcase wireless availability (802.11 b/g) - If HIMSS doesn't provide
- Schedule a reading for docents and rehearsals
  • Read, review the script

Links

PCD Home