Difference between revisions of "PCD Connectathon&Showcase WG 2008-9"

From IHE Wiki
Jump to navigation Jump to search
m (→‎Proposed Agendas October, November: update agenda 5th meeting)
m (→‎Proposed Agendas October, November: add to Showcase Planning)
Line 99: Line 99:
 
:* Timeline  
 
:* Timeline  
 
:* Kudu, Installation Test (PAM, PDQ)  
 
:* Kudu, Installation Test (PAM, PDQ)  
 +
  
 
:6 Fifth meeting [[PCD Connectathon&Showcase 2008-11-19 Webex]]
 
:6 Fifth meeting [[PCD Connectathon&Showcase 2008-11-19 Webex]]
Line 124: Line 125:
 
Showcase Planning
 
Showcase Planning
 
:* Scenario update, at ftp://ftp.ihe.net//Patient_Care_Devices/Showcases/HIMSS2009April/
 
:* Scenario update, at ftp://ftp.ihe.net//Patient_Care_Devices/Showcases/HIMSS2009April/
 +
:: Suggestions offered by Jeff Rinda, Scott
 +
:* Wall layout, census - sequence revision
 +
:* Equipment inventory
  
 
== Proposed Agendas December 2008, January 2009 ==
 
== Proposed Agendas December 2008, January 2009 ==

Revision as of 09:53, 19 November 2008

This is the entry point for this Working Group in the 2008-9 Connectathon and HIMSS Showcase cycle.

Meeting Purpose

Collaborative effort to discuss implementation and demonstration issues and preparations

WebEx Information

Topic: PCD Connectathon and Showcase Working Group

Dates: Most Wednesdays

Time: 4 pm, Eastern Time (New York )

Duration: 60 Minutes

Proposed Agendas October, November

1 First meeting PCD Connectathon&Showcase 2008-10-08 Webex, potential agenda items:
  • Introductions
  • Review of meeting purpose
  • Consideration of Wiki page(s) for minutes, action items, Scenario (e.g., one page or one page per meeting)
  • Summary of preparation process
  • Development of a calendar
  • Mandatory workshop Oct. 29-31
  • List of profiles, actors
  • Brief description of the MWB and its uses
  • Reminder of MWB tutorial Oct. 10
  • Review of testing concepts developed to date
  • Developing Scenario(s)
  • Process, timetable, tools
2 Second meeting PCD Connectathon&Showcase 2008-10-15 Webex, potential agenda items
Action Items (see below, this page)
Wiki pages review
  • Summaries of meetings will be posted and available for members to correct/add to.
  • Wiki page to collect recommendations for changes to profiles
Connectathon and Showcase Planning
  • Discussion of potential Scenario
  • Recommendation for patient flow and clinical site (OR, ICU, etc.) sequence
  • How might middleware be demonstrated?
Pre-Connectathon Test Cases update
  • DEC to be reviewed by participants
  • PIV reviewed, reformatted
  • ACM target mid-November
  • RTM as part of DEC testing
3 HIMSS Showcase Workshop breakout meeting notes with links to the entire Workshop
http://wiki.ihe.net/index.php?title=IHE_PCD_2009_Showcase_Workshop_2008-10-28_to_30
4 Third meeting PCD Connectathon&Showcase 2008-11-05 Webex, potential agenda items
Action Items (see below, this page)
  • Open Date: Monitor registrations for various actors.
  • Nov. 5: Determine how RTM will be tested in Pre-Connectathon, Virtual Connectathon, and Connectathon.
Likely to select a number of parameters, etc. for testing this year
Relatively small addition to one or two tests for each profile
  • Oct. 15: Why are more companies not implementing SPD query within DOC? Which companies will implement and test this query this year?
Issues and questions about:
  • The Trial Implementation version of any profiles
  • The MWB
Those needing the introductory Tutorial should contact Peter
November 17, 1 pm EST looks likely for the Advanced
  • HL7
  • Timeline
  • Interview Form, Kudu, Installation Test (PAM, PDQ)
Connectathon and Showcase Planning
  • Connectathon and earlier tests
Scenario update, see below, and
  • How would we demo in the short time available?
  • Should we plan on a stronger Docent/Tour Leader role for continuity?
Status report on Test Case development
  • DEC
  • ACM
  • PIV
  • RTM


5 Fourth meeting PCD Connectathon&Showcase 2008-11-12 Webex

Showcase Planning

  • Structure Census Review
How will we display RTM and the new profiles under development?

Connectathon Planning

  • Steve Moore's webinar this afternoon
  • Status report on Test Case development
  • DEC
  • ACM
  • PIV
  • RTM

Issues and questions about:

  • The Trial Implementation version of any profiles
  • The MWB
  • HL7
  • Timeline
  • Kudu, Installation Test (PAM, PDQ)


6 Fifth meeting PCD Connectathon&Showcase 2008-11-19 Webex
Action Items (see below, this page)

Issues and questions about:

  • The Trial Implementation version of any profiles
  • The MWB
  • HL7
  • Timeline
  • Kudu, Installation Test (PAM, PDQ)
  • RTM Validation
  • Pre-Connectathon and Virtual Connectathon Testing

Connectathon Planning

  • Status report on Test Case development
  • DEC
  • ACM
  • PIV
  • RTM
  • Other
Capsule device parameters
Cerner device parameters
ADT and PIV

Showcase Planning

Suggestions offered by Jeff Rinda, Scott
  • Wall layout, census - sequence revision
  • Equipment inventory

Proposed Agendas December 2008, January 2009

7 Sixth meeting PCD Connectathon&Showcase 2008-12-03 Webex
the following are placeholders
Action Items (see below, this page)
Issues and questions about:
  • The Trial Implementation version of any profiles
  • The MWB
  • HL7
  • Timeline
  • Kudu, Installation Test (PAM, PDQ)
Connectathon and Showcase Planning
  • Scenario update
  • Status report on Test Case development
DEC
ACM
PIV
RTM

2008-9 Calendar

This is intended as a work in progress, with milestones added or modified throughout the cycle. Dates to be assigned.

Development of Test Concepts with the Profile WGs
Development of the Pre-Connectathon Tests (MWB and NIST tools) to qualify systems for the Virtual and actual Connectathons
Development of Connectathon Tests
Reporting successful completion of Pre-Connectathon Qualifying Tests (initial qualifying MESA test, PCD profile tests)
Conduct of Virtual Connectathon Testing and reporting results
Submission of networking requirements to Steve Moore
Definition of Scenario for Showcase
Definition of space, utility and other requirements for the Showcase


Action Items (Details in meeting notes)

Due Dates and Item:

  • Closed Nov. 5: Why are more companies not implementing SPD query within DOC? Which companies will implement and test this query this year?
  • Open Date: Monitor registrations for various actors.
  • Date changed to Nov. 12: Determine how RTM will be tested in Pre-Connectathon, Virtual Connectathon, and Connectathon.
  • Nov. 5: Determine how RTM will be tested in Pre-Connectathon, Virtual Connectathon, and Connectathon.
  • Nov. 12: Manny to contact Jim Higgins (Cerner) to coordinate Hill-Rom support. They provided a bed and a gurney in the past.
  • Nov. 12: Sarah Higgins to identify contacts at Zebra and Manny to talk with them about bar code printers.
  • From the Workshop:
Nov. 19: (Ruth) Does this include the 5-rights data entry (see minutes, item ?
Nov. 19: (Al) A04, A01, A02... supported by PAM?
Nov. 19: (Colin FX/ Ruth) - summarize patient ID/registration requirements / issues from discussion. Group will then review and discuss in a subsequent WebEx session.
Nov. 19: (Bikram) Describe the approach Capsule wants to take to have bidirectional distributed demo - pushing data in from their booth to the demo.
Nov. 19: (Manny) Emails to Lisa with feedback on the Workshop
Nov. 19: (All) Provide material for the Scenario (outline or brief description) to be followed by Manny compiling a single view.
Dec. 3: (Manny) Learn if HIMSS Convention Registration will include an MRN barcode
(Pump Vendors, Enterprise Systems) Establish bar coding for drugs, infusions, patients
(All) Patient IDs, ADT/PIB issues
Dec. 3:(Manny) PCD Docent training WebEx / on site (and run through at Connectathon)
Dec. 3: (Manny) Create Wiki page for "virtual connectathon" on Connectathon '09 page. Include, partners, issues list / resolution, status, etc.
Dec. 3: (All) Identify overarching message (patient safety. Note that Ray presented the stakeholder survey which showed
Survey Slide #17, "Improved Patient Care and Safety" was by far the greatest "incentives for IHE integration"; #2 was "Long term cost reduction"; #3 was improved workflow
Workshop discussion suggested we focus on these, with 5 rights, remote alarm communication among the specifics
Dec. 3: (Bikram, Jim Higgins) Identify the devices to be connected to middleware
Dec. 3: (Manny) Draft ACM tests ready for review
Dec. 3: (Manny) Coordinate ADT testing (Virtual and Connectathon) with Bill Klaver
Dec. 18: (Brett) Update name for alarm product
Dec. 18: (Manny) HIMSS badge - MRN?
Dec. 18: (Manny, pump vendors, any others) Wireless spectrum management
? Steve Moore needs MAC addresses
Dec. 18: (Emergin, LiveData) Schedule Connectathon on site testing with Polycom
Jan. 6:(Manny) Business card for Showcase w/ all companies listed + Booth numbers
Jan. 6?: (All) Webex run through of draft Scenario


PCD Home