Difference between revisions of "PCD Connectathon&Showcase 2009-08-11 Webex"

From IHE Wiki
Jump to navigation Jump to search
m (→‎Discussion: move action items to Google Doc)
m (→‎Discussion: correction)
 
(8 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
== Action Items ==  
 
== Action Items ==  
  
 +
You can find the Action Items at http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
  
 
+
== Agenda ==  
Due Dates and Item:
+
Future Agendas will be found solely on the main page.
 
+
:
 
 
== Agenda ==
 
: '''Agenda''' 
 
 
'''Second meeting August 11, 3 pm EDT [[PCD Connectathon&Showcase 2009-08-11 Webex]]'''
 
'''Second meeting August 11, 3 pm EDT [[PCD Connectathon&Showcase 2009-08-11 Webex]]'''
  
Line 21: Line 19:
 
::- Orientation, mentoring of those new to the process
 
::- Orientation, mentoring of those new to the process
 
::- Coordination between technical and marketing folk
 
::- Coordination between technical and marketing folk
:* Development of a schedule [[PCD_Schedule]] Connectathon and Showcase detail will be developed later
+
:* Development of a schedule [[PCD_Schedule]] Connectathon and Showcase detail will be a work in process: Timeline [[PCD_Connectathon%26Showcase_WG_2009-10#2009-10_Calendar]]
 +
::- Message Workbench Training - scheduling tutorials with Peter Rontey (VA)
 +
::- PCD F2F October 5-9
 
:* IHE Webinars - instead of F2F
 
:* IHE Webinars - instead of F2F
::- PCD Presentation '''need link'''
+
::- PCD Presentation https://ihe.webex.com/ihe/lsr.php?AT=pb&SP=EC&rID=34315407&rKey=ba21b0d7905e8ce8
 +
::- N A Connectathon Process Aug. 28 http://www.ihe.net/Events/webinars2009.cfm
 
:* Technical development
 
:* Technical development
 
::- Brief description of the MWB and its uses
 
::- Brief description of the MWB and its uses
Line 31: Line 32:
 
::- RTM compliance required/desired
 
::- RTM compliance required/desired
 
:* Action Items are tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
 
:* Action Items are tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
 +
:* Would it be sufficient to have the agenda on the higher level page (PCD Connectathon&Showcase WG 2009-10)?
 +
:
  
: Timeline [[PCD_Connectathon%26Showcase_WG_2009-10#2009-10_Calendar]]
+
== Participants ==
 +
Sam Carello, Anupriyo Chakravarti, Todd Cooper, Bikram Day, Allen Enebo, Al Engelbert, Robert Flanders, John Garguilo, Colin FX Gartska, Brad Lunde, Steve Merritt, Gary Meyer, Monroe Pattillo, John Rhoads, Tom Schultz, Kristina Wilson, Khalid Zubaidi, Manny Furst
  
== Participants ==
 
'''placeholder'''
 
Rita Brahmbhatt, Sam Carello, Randy Carroll, Maria Cherkaoui, Anupriyo Chakravarti, Todd "MM" Cooper, Allen Enebo, Al Engelbert, Robert Flanders, Colin FX Gartska, Chad Hays, Tom Hubka, Steven Large, Sandra Martinez, Gary Meyer, Monroe Pattillo, Maureen Richard, Michael Rice, Jeff Rinda, Tom Schultz, Greg Staudenmaier, Scott Zaffrin, Khalid Zubaidi, Manny  Furst
 
  
 
== Discussion ==
 
== Discussion ==
Line 50: Line 51:
 
| '''Introductions & Agenda Review''' <br>- Manny
 
| '''Introductions & Agenda Review''' <br>- Manny
 
| '''Status/Discussion:'''
 
| '''Status/Discussion:'''
: No changes were made to the agenda  '''placeholder'''
+
: No changes were made to the agenda   
: Participant Spreadsheet listing companies, intentions
 
  
 
'''Decisions/Issues:'''
 
'''Decisions/Issues:'''
Line 61: Line 61:
 
| '''Connectathon Planning''' <br>-  
 
| '''Connectathon Planning''' <br>-  
 
| '''Status/Discussion:'''
 
| '''Status/Discussion:'''
:*  
+
:* The NIST tools will verify message structure and validity.
 +
:* MWB – need John Garguilo for profile and Peter on MWB updates. John: will need help from Peter and Ioana re profiles. They will be working on this soon. This will also be needed for NIST v2 tools. He’ll schedule training for that as well. Manny will conduct a survey to find a time when Peter is available and when it would work for the PCD, trying for week of Sept. 28 for the MWB (before the F2F). NIST training will be later.
 +
:* Participants discussed lessons learned in the last Connectathon and added a few new thoughts.
 
'''Decisions/Issues:'''
 
'''Decisions/Issues:'''
  
Line 70: Line 72:
 
| '''Showcase Planning''' <br>- Manny
 
| '''Showcase Planning''' <br>- Manny
 
| '''Status/Discussion:'''
 
| '''Status/Discussion:'''
:*  
+
:* Todd led discussion of lessons learned at HIMSS09.
 
+
:* Showcase F2F replaced by webinars
 +
:* PCD F2F in Oct – no adverse comments on Todd’s rough draft of contents; Sam suggested the Showcase be between the PC and TC to make it available for those coming for either, but not both.
  
 
'''Decisions/Issues:'''
 
'''Decisions/Issues:'''
Line 87: Line 90:
 
'''Action(s):'''
 
'''Action(s):'''
 
:*  
 
:*  
::- Arrange to penetrate firewalls
 
:* Develop Tests
 
:* Provide Test Tools and Education
 
:* Review Connectathon Lessons Learned
 
:* Review Showcase Lessons Learned
 
  
 
|-
 
|-

Latest revision as of 15:41, 18 August 2009

PCD Connectathon & Showcase 2009-10 Kick Off Meeting

Action Items

You can find the Action Items at http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en

Agenda

Future Agendas will be found solely on the main page.

Second meeting August 11, 3 pm EDT PCD Connectathon&Showcase 2009-08-11 Webex

  • Participating Companies and Profiles/Actors (spreadsheets)
- Update of list of companies, contacts, profiles, actors - survey
- Companies must be IHE members
- Connectathon ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/Yr3-2009/
- Showcase ftp://ftp.ihe.net/Patient_Care_Devices/Showcases/HIMSS2009April/
- Orientation, mentoring of those new to the process
- Coordination between technical and marketing folk
- Message Workbench Training - scheduling tutorials with Peter Rontey (VA)
- PCD F2F October 5-9
  • IHE Webinars - instead of F2F
- PCD Presentation https://ihe.webex.com/ihe/lsr.php?AT=pb&SP=EC&rID=34315407&rKey=ba21b0d7905e8ce8
- N A Connectathon Process Aug. 28 http://www.ihe.net/Events/webinars2009.cfm
  • Technical development
- Brief description of the MWB and its uses
- Pre-Connectathon, Virtual Connectathon, Connectathon testing
- NIST's support
- Availability of last year's samples and MWB efforts ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/Yr3-2009/Yr3-PreConnectathonTesting/
- RTM compliance required/desired

Participants

Sam Carello, Anupriyo Chakravarti, Todd Cooper, Bikram Day, Allen Enebo, Al Engelbert, Robert Flanders, John Garguilo, Colin FX Gartska, Brad Lunde, Steve Merritt, Gary Meyer, Monroe Pattillo, John Rhoads, Tom Schultz, Kristina Wilson, Khalid Zubaidi, Manny Furst


Discussion

Item Topic Discussion
1 Introductions & Agenda Review
- Manny
Status/Discussion:
No changes were made to the agenda

Decisions/Issues:

Action(s):

2 Connectathon Planning
-
Status/Discussion:
  • The NIST tools will verify message structure and validity.
  • MWB – need John Garguilo for profile and Peter on MWB updates. John: will need help from Peter and Ioana re profiles. They will be working on this soon. This will also be needed for NIST v2 tools. He’ll schedule training for that as well. Manny will conduct a survey to find a time when Peter is available and when it would work for the PCD, trying for week of Sept. 28 for the MWB (before the F2F). NIST training will be later.
  • Participants discussed lessons learned in the last Connectathon and added a few new thoughts.

Decisions/Issues:

Action(s):

3 Showcase Planning
- Manny
Status/Discussion:
  • Todd led discussion of lessons learned at HIMSS09.
  • Showcase F2F replaced by webinars
  • PCD F2F in Oct – no adverse comments on Todd’s rough draft of contents; Sam suggested the Showcase be between the PC and TC to make it available for those coming for either, but not both.

Decisions/Issues:

Action(s):

4 Action Items
- Manny
Status/Discussion:

Decisions/Issues:

Action(s):

3 Issues and Questions
- ___
Status/Discussion:

Decisions/Issues:

Action(s):


6 New Business
- All
Status/Discussion:

Decisions/Issues:

Action(s):

6 Add to Action Items Add:

Return to main WG page which has links to individual meeting pages

Return to main PCD Connectathon/Showcase WG page: PCD_Connectathon&Showcase_WG_2009-10