Difference between revisions of "PCD Connectathon&Showcase 2009-01-14 Webex"

From IHE Wiki
Jump to navigation Jump to search
m (establish page)
 
m (→‎Action Items: Updated)
Line 3: Line 3:
  
 
== Action Items ==  
 
== Action Items ==  
'''PLACEHOLDER from Jan. 7, 2009'''
+
: Updated from Jan. 7
 
 
  
 
Due Dates and Item:
 
Due Dates and Item:
  
:* Open Date: Monitor registrations for various actors. The next update will be available soon.
+
:* Open Date: Monitor registrations are provided periodically.
::* Jan. 7: Manny will contact John Donnelly to learn if HIMSS Convention Registration will include an MRN barcode, what the barcode standard will be
+
:* Jan. 7: (Manny) Update on ADT/patient-visitor id and association with systems. Focused meeting, include diagram and other information to be provided.
 
:* Dec. 23: (All) Provide material for the Scenario (outline or brief description) to be followed by Manny compiling a single view.
 
:* Dec. 23: (All) Provide material for the Scenario (outline or brief description) to be followed by Manny compiling a single view.
 
::* Identify overarching message (e.g., patient safety. Note that Ray presented the stakeholder survey which showed
 
::* Identify overarching message (e.g., patient safety. Note that Ray presented the stakeholder survey which showed
 
::* Survey Slide #17, "Improved Patient Care and Safety" was by far the greatest "incentives for IHE integration"; #2 was "Long term cost reduction"; #3 was improved workflow  
 
::* Survey Slide #17, "Improved Patient Care and Safety" was by far the greatest "incentives for IHE integration"; #2 was "Long term cost reduction"; #3 was improved workflow  
 
::* Workshop discussion suggested we focus on these, with 5 rights, remote alarm communication among the specifics
 
::* Workshop discussion suggested we focus on these, with 5 rights, remote alarm communication among the specifics
:* Jan. 7: Datamax and Zebra have been approached. Zebra appears willing. Manny to talk with them about bar code printers again after today's meetings.  
+
:* Jan. 14: Zebra has agreed to provide printers. We need to decide between two suggested models.
:* Jan. 7:(John Garguilo): Continue to provide updates on how RTM will be tested in Pre-Connectathon, Virtual Connectathon, and Connectathon.
+
:* Jan. 14(John Garguilo): Continue to provide updates on how RTM will be tested in Pre-Connectathon, Virtual Connectathon, and Connectathon.
:* Dec. 17: (Manny) Created Wiki page for "virtual connectathon" on Connectathon '09 page. Will eventually include, partners, issues list / resolution, status, etc.  
+
::* (Pump Vendors, Enterprise Systems) Vendors will provide their own approach to bar coding for drugs, infusions, patients and caregivers.
:* Dec. 17: (Bikram, Rita/Jim Higgins) Identify the devices to be connected to middleware
+
:* Jan. 14(Manny) Created Wiki page for "virtual connectathon" on Connectathon '09 page. Will eventually include, partners, issues list / resolution, status, etc.  
:* Dec. 17: (Manny) Coordinate ADT testing (Virtual and Connectathon) with Bill Klaver, coordinate with Steve Moore, John Donnelly, seek a backup system.
+
:* Jan. 14(Bikram, Rita/Jim Higgins) Identify the devices to be connected to middleware, the coding of parameters, identifying partners for testing and demonstration.
:* Dec. 17:(Brett) Update name for alarm product
+
:* Jan. 14(Manny) Coordinate ADT testing (Virtual and Connectathon) with Bill Klaver, coordinate with Steve Moore, John Donnelly, seek a backup system.
:* Jan. 7: (Manny) Update structure diagrams with SIS, other, and printers
+
:* Jan. 14(Brett) Update name for alarm product
:* Jan. 6: (Todd) Define contents of fourth wall
+
:* Jan. 14 (All) Confirm structure diagrams and utilities
:* Jan. 6:(Manny) Business card for Showcase w/ all companies listed + Booth numbers
+
:* Jan. 14: (Todd) Define contents of fourth wall
 +
:* Jan. 6: (Manny)Business card for Showcase w/ all companies listed + Booth numbers
 
:* Jan. 6?: (Manny) Set PCD Docent training WebEx / on site (and run through at Connectathon)
 
:* Jan. 6?: (Manny) Set PCD Docent training WebEx / on site (and run through at Connectathon)
:* Jan. 6?: (All) Webex run through of draft Scenario
+
:* Jan. 14: (All) Webex run through of draft Scenario
 
:* Jan. 14: (Ken) Update block diagram with locations of SIS, Cerner, Capsule
 
:* Jan. 14: (Ken) Update block diagram with locations of SIS, Cerner, Capsule
 
:* Jan. 14:  Steve Moore needs MAC addresses
 
:* Jan. 14:  Steve Moore needs MAC addresses

Revision as of 20:19, 7 January 2009

PCD Connectathon/Showcase WG


Action Items

Updated from Jan. 7

Due Dates and Item:

  • Open Date: Monitor registrations are provided periodically.
  • Jan. 7: (Manny) Update on ADT/patient-visitor id and association with systems. Focused meeting, include diagram and other information to be provided.
  • Dec. 23: (All) Provide material for the Scenario (outline or brief description) to be followed by Manny compiling a single view.
  • Identify overarching message (e.g., patient safety. Note that Ray presented the stakeholder survey which showed
  • Survey Slide #17, "Improved Patient Care and Safety" was by far the greatest "incentives for IHE integration"; #2 was "Long term cost reduction"; #3 was improved workflow
  • Workshop discussion suggested we focus on these, with 5 rights, remote alarm communication among the specifics
  • Jan. 14: Zebra has agreed to provide printers. We need to decide between two suggested models.
  • Jan. 14(John Garguilo): Continue to provide updates on how RTM will be tested in Pre-Connectathon, Virtual Connectathon, and Connectathon.
  • (Pump Vendors, Enterprise Systems) Vendors will provide their own approach to bar coding for drugs, infusions, patients and caregivers.
  • Jan. 14(Manny) Created Wiki page for "virtual connectathon" on Connectathon '09 page. Will eventually include, partners, issues list / resolution, status, etc.
  • Jan. 14(Bikram, Rita/Jim Higgins) Identify the devices to be connected to middleware, the coding of parameters, identifying partners for testing and demonstration.
  • Jan. 14(Manny) Coordinate ADT testing (Virtual and Connectathon) with Bill Klaver, coordinate with Steve Moore, John Donnelly, seek a backup system.
  • Jan. 14(Brett) Update name for alarm product
  • Jan. 14 (All) Confirm structure diagrams and utilities
  • Jan. 14: (Todd) Define contents of fourth wall
  • Jan. 6: (Manny)Business card for Showcase w/ all companies listed + Booth numbers
  • Jan. 6?: (Manny) Set PCD Docent training WebEx / on site (and run through at Connectathon)
  • Jan. 14: (All) Webex run through of draft Scenario
  • Jan. 14: (Ken) Update block diagram with locations of SIS, Cerner, Capsule
  • Jan. 14: Steve Moore needs MAC addresses
  • Jan. 19-30: Virtual Connectathon (tentative deadline for completion; partners may test anytime before this)

Agenda

PLACEHOLDER from Dec. 17


Action Items
Issues and questions about:
  • The Trial Implementation version of any profiles
  • Registration update; PIV registrations of DEC as option or full listing
  • The MWB
  • HL7
-Version 2.6 vs 2.5
  • Kudu
-PAM, PDQ for PCD alone - see the DOR tests; for complete PAM, PDQ see MESA tests
  • Visitor/patient, caregiver, device ID;
  • Report any discrepancies on tests listed for your systems to Manny
Connectathon Planning
  • Status report on Test Case development for Pre-Connectathon, Virtual Connectathon, Connectathon
-DEC -
Decision on which tests to use for Virtual Connectathon will follow
-ACM -
-PIV -
-RTM -
  • Will be entered into Kudu ASAP for Pre-Connectathon and Connectathon testing
-Virtual Connectathon testing is separate from these

Showcase Planning

  • Scenario update
- Wiki page for Scripts
  • Showcase Structure
- Drawings
- Utilities (electric, network)
- Physical requirements (size, mounts if larger, etc)
- Logos -
Timeline

Participants

PLACEHOLDER from Dec. 10

Anupriyo Chakravarti, Al Engelbert, Robert Flanders, Brian Fors, Ken Fuchs, John Garguilo, Colin FX Gartska, Monroe Pattillo, John Rhoads, Jeff Rinda, Manny Furst

Discussion

Review of Meeting Notes: Corrections should be made to the Wiki; significant issues placed on agenda of the next meeting

Item Topic Discussion
1 Introductions & Agenda Review
- Manny
Status/Discussion:

Decisions/Issues:

Action(s):

2 Action Items
- Manny
Status/Discussion:

Those discussed and due Jan. 14 were:

Items with other dates:

Those closed were:

Decisions/Issues:

Action(s):

  • As above.
3 Issues and Questions
- Manny
Status/Discussion:

Decisions/Issues:

Action(s):

4 Connectathon Planning
- Manny
Status/Discussion:
  • Test case development:
-DEC -
-
-ACM -
-PIV -
-RTM -
  • Virtual Connectathon
-

Decisions/Issues:

Action(s):


Return to main WG page which has links to individual meeting pages

Return to main PCD Connectathon/Showcase WG page: PCD_Connectathon&Showcase_WG_2008-9