Difference between revisions of "PCD Connectathon&Showcase 2009-01-07 Webex"

From IHE Wiki
Jump to navigation Jump to search
m (→‎Agenda: Prepare agenda)
Line 32: Line 32:
  
 
== Agenda ==
 
== Agenda ==
'''PLACEHOLDER from Dec. 17'''
+
'''Please add to the list'''
  
  
 
: Action Items
 
: Action Items
 
: Issues and questions about:
 
: Issues and questions about:
::* The Trial Implementation version of any profiles
 
::* Registration update; PIV registrations of DEC as option or full listing
 
 
::* The MWB
 
::* The MWB
 
::* HL7
 
::* HL7
::: -Version 2.6 vs 2.5
 
 
::* Kudu
 
::* Kudu
 
::: -PAM, PDQ for PCD alone - see the DOR tests; for complete PAM, PDQ see MESA tests
 
::: -PAM, PDQ for PCD alone - see the DOR tests; for complete PAM, PDQ see MESA tests
::* Visitor/patient, caregiver, device ID; follow up to last week's special meeting if necessary
+
::* Visitor/patient; second special meeting  
 
::* Report any discrepancies on tests listed for your systems to Manny
 
::* Report any discrepancies on tests listed for your systems to Manny
 
:
 
:
 
: Connectathon Planning
 
: Connectathon Planning
 
::* Status report on Test Case development for Pre-Connectathon, Virtual Connectathon, Connectathon
 
::* Status report on Test Case development for Pre-Connectathon, Virtual Connectathon, Connectathon
::: -DEC - revised 2008 version out for review for Pre-Connectathon, Connectathon tests
+
::: -DEC - revised 2008 version  
 
:::: Decision on which tests to use for Virtual Connectathon will follow
 
:::: Decision on which tests to use for Virtual Connectathon will follow
::: -ACM - concept out for review
+
::: -ACM -  
::: -PIV - concept has been reviewed, request drug information
+
::: -PIV -  
::: -RTM - NIST
+
::: -RTM -  
::* Will be entered into Kudu ASAP for Pre-Connectathon and Connectathon testing
 
::: -Virtual Connectathon testing is separate from these
 
 
:
 
:
 
Showcase Planning
 
Showcase Planning
Line 64: Line 59:
 
:::- Utilities (electric, network)
 
:::- Utilities (electric, network)
 
:::- Physical requirements (size, mounts if larger, etc)
 
:::- Physical requirements (size, mounts if larger, etc)
:::- Logos - one per company - which sides?
+
:::- Logos -  
 
:
 
:
  

Revision as of 10:08, 20 December 2008

PCD Connectathon/Showcase WG


Action Items

PLACEHOLDER from Dec. 17


Due Dates and Item:

  • Open Date: Monitor registrations for various actors. The next update will be available soon.
  • Jan. 7: (Manny) Update on ADT/patient-visitor id and association with systems. Focused meeting, include diagram and other information to be provided.
  • Manny will contact John Donnelly to learn if HIMSS Convention Registration will include an MRN barcode, what the barcode standard will be
  • Dec. 23: (All) Provide material for the Scenario (outline or brief description) to be followed by Manny compiling a single view.
  • Identify overarching message (e.g., patient safety. Note that Ray presented the stakeholder survey which showed
  • Survey Slide #17, "Improved Patient Care and Safety" was by far the greatest "incentives for IHE integration"; #2 was "Long term cost reduction"; #3 was improved workflow
  • Workshop discussion suggested we focus on these, with 5 rights, remote alarm communication among the specifics
  • Dec. 23: Datamax and Zebra have been approached. Zebra appears willing. Manny to talk with them about bar code printers again after today's meetings.
  • Jan. 7: (John Garguilo): Continue to provide updates on how RTM will be tested in Pre-Connectathon, Virtual Connectathon, and Connectathon.
  • (Pump Vendors, Enterprise Systems) Vendors will provide their own approach to bar coding for drugs, infusions, patients and caregivers.
  • Jan. 7: (Manny) Created Wiki page for "virtual connectathon" on Connectathon '09 page. Will eventually include, partners, issues list / resolution, status, etc.
  • Dec. 23: (Bikram, Rita/Jim Higgins) Identify the devices to be connected to middleware
  • Jan. 7: (Manny) Coordinate ADT testing (Virtual and Connectathon) with Bill Klaver, coordinate with Steve Moore, John Donnelly, seek a backup system.
  • Jan. 7:(Brett) Update name for alarm product
  • Dec. 23: (Manny) Update structure diagrams with SIS, other, and printers
  • Jan. 6: Define contents of fourth wall
  • Jan. 6:(Manny) Business card for Showcase w/ all companies listed + Booth numbers
  • Jan. 6?: (Manny) Set PCD Docent training WebEx / on site (and run through at Connectathon)
  • Jan. 6?: (All) Webex run through of draft Scenario
  • Jan. 14: (Ken) Update block diagram with locations of SIS, Cerner, Capsule
  • Jan. 14: Steve Moore needs MAC addresses
  • Jan. 19-30: Virtual Connectathon (tentative deadline for completion; partners may test anytime before this)

Agenda

Please add to the list


Action Items
Issues and questions about:
  • The MWB
  • HL7
  • Kudu
-PAM, PDQ for PCD alone - see the DOR tests; for complete PAM, PDQ see MESA tests
  • Visitor/patient; second special meeting
  • Report any discrepancies on tests listed for your systems to Manny
Connectathon Planning
  • Status report on Test Case development for Pre-Connectathon, Virtual Connectathon, Connectathon
-DEC - revised 2008 version
Decision on which tests to use for Virtual Connectathon will follow
-ACM -
-PIV -
-RTM -

Showcase Planning

  • Scenario update
- Wiki page for Scripts
  • Showcase Structure
- Drawings, only minor changes are required
- Utilities (electric, network)
- Physical requirements (size, mounts if larger, etc)
- Logos -
Timeline

Participants

PLACEHOLDER from Dec. 10

Anupriyo Chakravarti, Al Engelbert, Robert Flanders, Brian Fors, Ken Fuchs, John Garguilo, Colin FX Gartska, Monroe Pattillo, John Rhoads, Jeff Rinda, Manny Furst

Discussion

Review of Meeting Notes: Corrections should be made to the Wiki; significant issues placed on agenda of the next meeting

Item Topic Discussion
1 Introductions & Agenda Review
- Manny
Status/Discussion:

Decisions/Issues:

Action(s):

2 Action Items
- Manny
Status/Discussion:

Those discussed and due Dec. 17 were:

Items with other dates:

Those closed were:

Decisions/Issues:

Action(s):

  • As above.
3 Issues and Questions
- Manny
Status/Discussion:

Decisions/Issues:

Action(s):

4 Connectathon Planning
- Manny
Status/Discussion:
  • Test case development:
-DEC -
-
-ACM -
-PIV -
-RTM -
  • Virtual Connectathon
-

Decisions/Issues:

Action(s):


Return to main WG page which has links to individual meeting pages

Return to main PCD Connectathon/Showcase WG page: PCD_Connectathon&Showcase_WG_2008-9