PCD Connectathon&Showcase 2008-12-10 Webex

From IHE Wiki
Revision as of 00:01, 10 December 2008 by Efurst (talk | contribs) (→‎Discussion: Prepare section for meeting)
Jump to navigation Jump to search

PCD Connectathon/Showcase WG


Action Items

Due Dates and Item: Need to update with discussion and action items from 12/3

  • Open Date: Monitor registrations for various actors.
  • Dec. 3 (Updated, moved): (Ruth) Does GE Enterprise include the 5-rights data entry?
  • Dec. 3 (Updated, moved): Al provided information about PAM, the need for A04 which is in ITI-31, not ITI-30, will be part of patient ID issue
  • Dec. 3 (Updated, moved): (Colin FX/ Ruth) - summarize patient ID/registration requirements / issues from discussion. Group will review and discuss in a subsequent WebEx session.
  • Dec. 3 (Moved): (Bikram) Describe the approach Capsule wants to take to have bidirectional distributed demo - pushing data in from their booth to the demo.
  • Dec. 3 (Moved): (All) Provide material for the Scenario (outline or brief description) to be followed by Manny compiling a single view.
  • Dec. 3 (Moved): Sarah Higgins identified contacts at Datamax and Zebra. Manny to talk with them about bar code printers.
  • Dec. 3 (Moved): Determine how RTM will be tested in Pre-Connectathon, Virtual Connectathon, and Connectathon.
  • Dec. 3: (Manny) Learn if HIMSS Convention Registration will include an MRN barcode, what the barcode standard will be
  • (Pump Vendors, Enterprise Systems) Establish bar coding for drugs, infusions, patients
  • (All) Patient IDs, ADT/PIB issues
  • Dec. 3: (Manny) Create Wiki page for "virtual connectathon" on Connectathon '09 page. Include, partners, issues list / resolution, status, etc.
  • Dec. 3: (All) Identify overarching message (e.g., patient safety. Note that Ray presented the stakeholder survey which showed
  • Survey Slide #17, "Improved Patient Care and Safety" was by far the greatest "incentives for IHE integration"; #2 was "Long term cost reduction"; #3 was improved workflow
  • Workshop discussion suggested we focus on these, with 5 rights, remote alarm communication among the specifics
  • Dec. 3: (Bikram, Jim Higgins) Identify the devices to be connected to middleware
  • Dec. 18: (Moved) (Manny) Coordinate ADT testing (Virtual and Connectathon) with Bill Klaver, coordinate with Steve Moore, John Donnelly, seek a backup system.
  • Dec. 18:(Brett) Update name for alarm product
  • Dec. 18: (Manny, pump vendors, any others) Wireless spectrum management. Didi is not supportive of addressing this throughout the convention hall, recommends approaching John Donnelly. Manny will contact John.
  • ? Steve Moore needs MAC addresses
  • Dec. 18:(Emergin, LiveData) Schedule Connectathon on site testing with Polycom
  • Jan. 6:(Manny) Business card for Showcase w/ all companies listed + Booth numbers
  • Jan. 6?: (Manny) Set PCD Docent training WebEx / on site (and run through at Connectathon)
  • Jan. 6?(All) Webex run through of draft Scenario

Agenda

Placeholder; need to update

Action Items
Issues and questions about:
  • The Trial Implementation version of any profiles
  • The MWB
  • HL7
- Version 2.6 vs 2.5
  • Kudu for Pre-Connectathon and Connectathon testing
- PAM, PDQ testing

Connectathon Planning

  • Status report on Test Case development
Pre-Connectathon, Virtual Connectathon, Connectathon
  • DEC with PIB and SPD
  • ACM
  • PIV
  • RTM

Showcase Planning

  • Structure
- Drawings
- Utilities (electric, network)
- Physical requirements (size, mounts if larger, etc)
- Wireless requirements for Connectathon and Showcase
- Logos - one per company - which sides?
- How will we display RTM and the new profiles under development?

Timeline

Participants

Dan Bowling, Rita Brahmbhatt, Anupriyo Chakravarti, Bikram Day, Al Engelbert, Robert Flanders, Brian Fors, John Garguilo, Karen Jimenez, Brad Lunde, Gary Meyer, Monroe Pattillo, John Rhoads, Khalid Zubaidi, Manny Furst

Discussion

Review of Meeting Notes: Corrections should be made to the Wiki; significant issues placed on agenda of the next meeting

Item Topic Discussion
1 Introductions & Agenda Review
- Manny
Status/Discussion:

Decisions/Issues:

Action(s):

2 Action Items
- Manny
Status/Discussion:

The following were updated:

Decisions/Issues:

Action(s):

3 Issues and Questions
- Manny
Status/Discussion:

Decisions/Issues:

Action(s):

4 Connectathon Planning
- Manny
Status/Discussion:

Status Report on Test Case Development

  • DEC:
  • ACM:
  • PIV:
  • RTM:

Virtual Connectathon

Decisions/Issues:

Action(s):

5 Showcase Planning
- Manny
Status/Discussion:

Structure

Scenario Script

Decisions/Issues:

Action(s):


Return to main WG page which has links to individual meeting pages

Return to main PCD Connectathon/Showcase WG page: PCD_Connectathon&Showcase_WG_2008-9