:* Jan. 14: (Manny) Update on ADT/patient-visitor id and association with systems. Focused meeting, include diagram and other information to be provided.  
+
:* Jan. 28: (Manny) Update on ADT/patient-visitor id and association with systems. Focused meeting, include diagram and other information to be provided.  
::* John Donnelly will address this as part of the Showcase focused portion of this meeding.
+
::* ADT: Bill Klaver for Virtual Connectathon; John Donnelly, and Steve Moore for Connectathon and Showcase. A04 will work this year
::* Check with Bill Klaver, John Donnelly, and Steve Moore. A04 will work this year
+
:* Jan. 28: (Manny) Verify that we will have an A04 message this year. Request preloaded data (medication order, demographics).
:* Jan. 21: (Manny) Verify that we will have an A04 message this year. Request preloaded data (medication order, demographics).
 
 
:* Jan. 16: (All) Provide material for the Scenario (outline or brief description) to be followed by Manny compiling a single view.
 
:* Jan. 16: (All) Provide material for the Scenario (outline or brief description) to be followed by Manny compiling a single view.
 
::* Identify overarching message (e.g., patient safety. Note that Ray presented the stakeholder survey which showed
 
::* Identify overarching message (e.g., patient safety. Note that Ray presented the stakeholder survey which showed
Line 20: Line 19:
 
:* Jan. 21: (Manny) Created Wiki page for "virtual connectathon" on Connectathon '09 page. Will eventually include, partners, issues list / resolution, status, etc.  
 
:* Jan. 21: (Manny) Created Wiki page for "virtual connectathon" on Connectathon '09 page. Will eventually include, partners, issues list / resolution, status, etc.  
 
:* Jan. 16: (Bikram, Rita/Jim Higgins) Identify the devices to be connected to middleware, the coding of parameters, identifying partners for testing and demonstration.
 
:* Jan. 16: (Bikram, Rita/Jim Higgins) Identify the devices to be connected to middleware, the coding of parameters, identifying partners for testing and demonstration.
:* Jan. 21: (Manny) Coordinate ADT testing (Virtual and Connectathon) with Bill Klaver, coordinate with Steve Moore, John Donnelly, seek a backup system.
 
 
:* Jan. 16: (Brett) Update name for alarm product
 
:* Jan. 16: (Brett) Update name for alarm product
 
:* Jan. 16: (All) Confirm structure diagrams and utilities
 
:* Jan. 16: (All) Confirm structure diagrams and utilities
:* Jan. 21:  (Todd) Define contents of fourth wall
+
:* Jan. 28:  (Todd) Define contents of fourth wall, provision of monitors, laptops, keyboards, mice.
 
:* Jan. 21: (Manny) Set PCD Docent training WebEx / on site (and run through at Connectathon)
 
:* Jan. 21: (Manny) Set PCD Docent training WebEx / on site (and run through at Connectathon)
 
:* Jan. 21: (All) Webex run through of draft Scenario
 
:* Jan. 21: (All) Webex run through of draft Scenario
Line 29: Line 27:
 
:* Jan. 21:  Steve Moore needs MAC addresses
 
:* Jan. 21:  Steve Moore needs MAC addresses
 
:* Jan. 19 - Feb. 6: Virtual Connectathon (tentative deadline for completion; partners may test anytime before this)
 
:* Jan. 19 - Feb. 6: Virtual Connectathon (tentative deadline for completion; partners may test anytime before this)
:* Jan. 19: Determine if Cerner can support the AR actor in  the Showcase.
 
 
:* Feb. 18: Change proposal to PIB for ADT in PIB option.
 
:* Feb. 18: Change proposal to PIB for ADT in PIB option.
  
Line 37: Line 34:
  
 
: Action Items
 
: Action Items
 
+
:
::* System Assignments
 
::* Assignments – identifying your partners,
 
::* Profiles - identification of specific profile requirements
 
::* ADT for PIB – NOT for those implementing and testing ITI PAM, PDQ
 
::* Virtual Testing – Pre-Connectathon
 
:::* IP address, ports required
 
::* Connectathon –
 
:::* IP address, ports
 
::* Showcase Virtual Connectathon and Rehearsal at the Connectathon
 
::* Monitoring progress, issues through the rest of the process
 
::* Showcase Internet connections
 
::* Tours - should we rethink the concepts?
 
::* Q and A
 
::* Risk Assessment
 
 
 
 
: Issues and questions about:
 
: Issues and questions about:
 
::* The MWB
 
::* The MWB
Line 62: Line 44:
 
: Connectathon Planning
 
: Connectathon Planning
 
::* Status report on Test Case development for Pre-Connectathon, Virtual Connectathon, Connectathon
 
::* Status report on Test Case development for Pre-Connectathon, Virtual Connectathon, Connectathon
 +
::* ADT for PIB – NOT for those implementing and testing ITI PAM, PDQ
 
::: - DEC - revised 2008 version  
 
::: - DEC - revised 2008 version  
 
::: - ACM -  
 
::: - ACM -  
Line 67: Line 50:
 
::: - RTM -  
 
::: - RTM -  
 
::* Decision on which tests to use for Virtual Connectathon and Connectathon
 
::* Decision on which tests to use for Virtual Connectathon and Connectathon
::* Scheduling the Virtual Connectathon
+
::* Virtual Testing – Pre-Connectathon
 +
:::* IP address, ports
 +
 
 
::* NIST validation of RTM
 
::* NIST validation of RTM
 
:
 
:
 
: Showcase Planning
 
: Showcase Planning
 
::* Scenario update
 
::* Scenario update
::: - Tours - should we rethink the concepts?
+
::* System Assignments
::: - Wiki page for Scripts
+
::* Assignments – identifying your partners,
 +
::: - Tours - rethinking the concepts  
 +
::* Showcase Internet connections
 +
::* Showcase Virtual Connectathon and Rehearsal at the Connectathon
 +
::* Monitoring progress, issues through the rest of the process
 +
::: - Risk Assessment
 +
 
 +
::: -Wiki page for Scripts
 
::* Showcase Structure
 
::* Showcase Structure
 
::: - Drawings, only minor changes are required
 
::: - Drawings, only minor changes are required
Line 83: Line 75:
 
: Timeline
 
: Timeline
 
::* Steve's: http://www.ihe.net/north_america/upload/NA-2009-Connectathon-Timeline-FINAL.pdf
 
::* Steve's: http://www.ihe.net/north_america/upload/NA-2009-Connectathon-Timeline-FINAL.pdf
 +
  
 
== Participants ==
 
== Participants ==

Revision as of 09:47, 22 January 2009

PCD Connectathon/Showcase WG

Action Items

from Jan. 21

Due Dates and Item:

  • Open Date: Monitor registrations are provided periodically.
  • Jan. 28: (Manny) Update on ADT/patient-visitor id and association with systems. Focused meeting, include diagram and other information to be provided.
  • ADT: Bill Klaver for Virtual Connectathon; John Donnelly, and Steve Moore for Connectathon and Showcase. A04 will work this year
  • Jan. 28: (Manny) Verify that we will have an A04 message this year. Request preloaded data (medication order, demographics).
  • Jan. 16: (All) Provide material for the Scenario (outline or brief description) to be followed by Manny compiling a single view.
  • Identify overarching message (e.g., patient safety. Note that Ray presented the stakeholder survey which showed
  • Survey Slide #17, "Improved Patient Care and Safety" was by far the greatest "incentives for IHE integration"; #2 was "Long term cost reduction"; #3 was improved workflow
  • Workshop discussion suggested we focus on these, with 5 rights, remote alarm communication among the specifics
  • Jan. 21: (Manny) Zebra has agreed to provide printers. We need to decide between two suggested models; determine if Epic can use the same Postscript printer Ruth provides; assure access to the registration kiosk.
  • Jan. 21(John Garguilo): Updates on how RTM will be tested in Pre-Connectathon, Virtual Connectathon, and Connectathon.
  • (Pump Vendors, Enterprise Systems) Vendors will provide their own approach to bar coding for drugs, infusions, patients and caregivers.
  • Jan. 21: (Manny) Created Wiki page for "virtual connectathon" on Connectathon '09 page. Will eventually include, partners, issues list / resolution, status, etc.
  • Jan. 16: (Bikram, Rita/Jim Higgins) Identify the devices to be connected to middleware, the coding of parameters, identifying partners for testing and demonstration.
  • Jan. 16: (Brett) Update name for alarm product
  • Jan. 16: (All) Confirm structure diagrams and utilities
  • Jan. 28: (Todd) Define contents of fourth wall, provision of monitors, laptops, keyboards, mice.
  • Jan. 21: (Manny) Set PCD Docent training WebEx / on site (and run through at Connectathon)
  • Jan. 21: (All) Webex run through of draft Scenario
  • Jan. 21: (Ken) Update block diagram with locations of SIS, Cerner, Capsule
  • Jan. 21: Steve Moore needs MAC addresses
  • Jan. 19 - Feb. 6: Virtual Connectathon (tentative deadline for completion; partners may test anytime before this)
  • Feb. 18: Change proposal to PIB for ADT in PIB option.

Agenda

Please add to the list

Action Items
Issues and questions about:
  • The MWB
  • HL7
  • Kudu, Connectathon, Showcase
- PAM, PDQ for PCD alone - see the DOR tests; for complete PAM, PDQ see MESA tests
  • Report any discrepancies on tests listed for your systems to Manny
Connectathon Planning
  • Status report on Test Case development for Pre-Connectathon, Virtual Connectathon, Connectathon
  • ADT for PIB – NOT for those implementing and testing ITI PAM, PDQ
- DEC - revised 2008 version
- ACM -
- PIV -
- RTM -
  • Decision on which tests to use for Virtual Connectathon and Connectathon
  • Virtual Testing – Pre-Connectathon
  • IP address, ports
  • NIST validation of RTM
Showcase Planning
  • Scenario update
  • System Assignments
  • Assignments – identifying your partners,
- Tours - rethinking the concepts
  • Showcase Internet connections
  • Showcase Virtual Connectathon and Rehearsal at the Connectathon
  • Monitoring progress, issues through the rest of the process
- Risk Assessment
-Wiki page for Scripts
  • Showcase Structure
- Drawings, only minor changes are required
- Utilities (electric, network)
- Physical requirements (size, mounts if larger, etc)
- Logos -
- Signs thanking supporters
Timeline


Participants

PLACEHOLDER

Chris Bonis, Dan Bowling, Anupriyo Chakravarti, Todd Cooper, Robert Cuyugan, Bikram Day, Chris DiTrani, Al Engelbert, Robert Flanders, Brian Fors, Ken Fuchs, Chad Hays, Jim Higgins, Sarah Hopkins, James Kohler, Paul LaRocque, Chris Lindop, Gary Meyers, Monroe Pattillo, Jeff Rinda, Lisa Spellman, Kristina Wilson, Scott Zaffrin, Khalid Zubaidi, Manny Furst

Discussion

Review of Meeting Notes: Corrections should be made to the Wiki; significant issues placed on agenda of the next meeting

Item Topic Discussion
1 Introductions & Agenda Review
- Manny
Status/Discussion:

Decisions/Issues:

Action(s):

2 Action Items
- Manny
Status/Discussion:

Those discussed and due Jan. 14 were:

Items with other dates:

Those closed were:

Decisions/Issues:

Action(s):

  • As above.
3 Issues and Questions
- Manny
Status/Discussion:

Decisions/Issues:

Action(s):

4 Connectathon Planning
- Manny
Status/Discussion:
  • Test case development:
-DEC -
-
-ACM -
-PIV -
-RTM -
  • Virtual Connectathon
-

Decisions/Issues:

Action(s):


Return to main WG page which has links to individual meeting pages

Return to main PCD Connectathon/Showcase WG page: PCD_Connectathon&Showcase_WG_2008-9