Difference between revisions of "PCD Connectathon&Showcase 2009-01-14 Webex"

From IHE Wiki
Jump to navigation Jump to search
m (establish page)
 
m (→‎Discussion: add one more item)
 
(8 intermediate revisions by the same user not shown)
Line 3: Line 3:
  
 
== Action Items ==  
 
== Action Items ==  
'''PLACEHOLDER from Jan. 7, 2009'''
+
: Updated from Jan. 7
 
 
  
 
Due Dates and Item:
 
Due Dates and Item:
  
:* Open Date: Monitor registrations for various actors. The next update will be available soon.
+
:* Open Date: Monitor registrations are provided periodically.
::* Jan. 7: Manny will contact John Donnelly to learn if HIMSS Convention Registration will include an MRN barcode, what the barcode standard will be
+
:* Jan. 7: (Manny) Update on ADT/patient-visitor id and association with systems. Focused meeting, include diagram and other information to be provided.
 
:* Dec. 23: (All) Provide material for the Scenario (outline or brief description) to be followed by Manny compiling a single view.
 
:* Dec. 23: (All) Provide material for the Scenario (outline or brief description) to be followed by Manny compiling a single view.
 
::* Identify overarching message (e.g., patient safety. Note that Ray presented the stakeholder survey which showed
 
::* Identify overarching message (e.g., patient safety. Note that Ray presented the stakeholder survey which showed
 
::* Survey Slide #17, "Improved Patient Care and Safety" was by far the greatest "incentives for IHE integration"; #2 was "Long term cost reduction"; #3 was improved workflow  
 
::* Survey Slide #17, "Improved Patient Care and Safety" was by far the greatest "incentives for IHE integration"; #2 was "Long term cost reduction"; #3 was improved workflow  
 
::* Workshop discussion suggested we focus on these, with 5 rights, remote alarm communication among the specifics
 
::* Workshop discussion suggested we focus on these, with 5 rights, remote alarm communication among the specifics
:* Jan. 7: Datamax and Zebra have been approached. Zebra appears willing. Manny to talk with them about bar code printers again after today's meetings.  
+
:* Jan. 14: Zebra has agreed to provide printers. We need to decide between two suggested models.
:* Jan. 7:(John Garguilo): Continue to provide updates on how RTM will be tested in Pre-Connectathon, Virtual Connectathon, and Connectathon.
+
:* Jan. 14(John Garguilo): Continue to provide updates on how RTM will be tested in Pre-Connectathon, Virtual Connectathon, and Connectathon.
:* Dec. 17: (Manny) Created Wiki page for "virtual connectathon" on Connectathon '09 page. Will eventually include, partners, issues list / resolution, status, etc.  
+
::* (Pump Vendors, Enterprise Systems) Vendors will provide their own approach to bar coding for drugs, infusions, patients and caregivers.
:* Dec. 17: (Bikram, Rita/Jim Higgins) Identify the devices to be connected to middleware
+
:* Jan. 14(Manny) Created Wiki page for "virtual connectathon" on Connectathon '09 page. Will eventually include, partners, issues list / resolution, status, etc.  
:* Dec. 17: (Manny) Coordinate ADT testing (Virtual and Connectathon) with Bill Klaver, coordinate with Steve Moore, John Donnelly, seek a backup system.
+
:* Jan. 14(Bikram, Rita/Jim Higgins) Identify the devices to be connected to middleware, the coding of parameters, identifying partners for testing and demonstration.
:* Dec. 17:(Brett) Update name for alarm product
+
:* Jan. 14(Manny) Coordinate ADT testing (Virtual and Connectathon) with Bill Klaver, coordinate with Steve Moore, John Donnelly, seek a backup system.
:* Jan. 7: (Manny) Update structure diagrams with SIS, other, and printers
+
:* Jan. 14(Brett) Update name for alarm product
:* Jan. 6: (Todd) Define contents of fourth wall
+
:* Jan. 14 (All) Confirm structure diagrams and utilities
:* Jan. 6:(Manny) Business card for Showcase w/ all companies listed + Booth numbers
+
:* Jan. 14: (Todd) Define contents of fourth wall
 +
:* Jan. 6: (Manny)Business card for Showcase w/ all companies listed + Booth numbers
 
:* Jan. 6?: (Manny) Set PCD Docent training WebEx / on site (and run through at Connectathon)
 
:* Jan. 6?: (Manny) Set PCD Docent training WebEx / on site (and run through at Connectathon)
:* Jan. 6?: (All) Webex run through of draft Scenario
+
:* Jan. 14: (All) Webex run through of draft Scenario
 
:* Jan. 14: (Ken) Update block diagram with locations of SIS, Cerner, Capsule
 
:* Jan. 14: (Ken) Update block diagram with locations of SIS, Cerner, Capsule
 
:* Jan. 14:  Steve Moore needs MAC addresses
 
:* Jan. 14:  Steve Moore needs MAC addresses
Line 30: Line 30:
  
 
== Agenda ==
 
== Agenda ==
'''PLACEHOLDER from Dec. 17'''
 
 
  
 
: Action Items
 
: Action Items
 
: Issues and questions about:
 
: Issues and questions about:
::* The Trial Implementation version of any profiles
 
::* Registration update; PIV registrations of DEC as option or full listing
 
 
::* The MWB
 
::* The MWB
 
::* HL7
 
::* HL7
::: -Version 2.6 vs 2.5
+
::* Kudu, Connectathon, Showcase
::* Kudu
+
::: - When will results be posted to Kudu?
::: -PAM, PDQ for PCD alone - see the DOR tests; for complete PAM, PDQ see MESA tests
+
::: - PAM, PDQ for PCD alone - see the DOR tests; for complete PAM, PDQ see MESA tests
::* Visitor/patient, caregiver, device ID;
+
::: - MRNs may be alpha
 +
::: - Review discussion with John Donnelly, including Kiosk (printer, laptop), preload visitor data (DOB), etc.
 
::* Report any discrepancies on tests listed for your systems to Manny
 
::* Report any discrepancies on tests listed for your systems to Manny
 
:
 
:
 
: Connectathon Planning
 
: Connectathon Planning
 
::* Status report on Test Case development for Pre-Connectathon, Virtual Connectathon, Connectathon
 
::* Status report on Test Case development for Pre-Connectathon, Virtual Connectathon, Connectathon
::: -DEC -  
+
::: - DEC - minor changes to come
:::: Decision on which tests to use for Virtual Connectathon will follow
+
::: - ACM - meeting on Thursday
::: -ACM -  
+
::: - PIV - updated version posted
::: -PIV -  
+
::: - RTM -  
::: -RTM -
+
::: - Watch emails for additional changes
::* Will be entered into Kudu ASAP for Pre-Connectathon and Connectathon testing
+
::* Decision on which tests to use for Virtual Connectathon and Connectathon
::: -Virtual Connectathon testing is separate from these
+
::* Scheduling the Virtual Connectathon
 +
::* NIST validation of RTM:
 
:
 
:
Showcase Planning
+
: Showcase Planning
 
::* Scenario update
 
::* Scenario update
:::- Wiki page for Scripts
+
::: -Wiki page for Scripts
 
::* Showcase Structure
 
::* Showcase Structure
:::- Drawings
+
::: - Drawings, only minor changes are required
:::- Utilities (electric, network)
+
::: - Utilities (electric, network)
:::- Physical requirements (size, mounts if larger, etc)
+
::: - Physical requirements (size, mounts if larger, etc)
:::- Logos -  
+
::: - Logos -  
:
+
::: - Signs thanking supporters
  
 
: Timeline
 
: Timeline
Line 69: Line 67:
  
 
== Participants ==
 
== Participants ==
'''PLACEHOLDER from Dec. 10'''
 
  
Anupriyo Chakravarti, Al Engelbert, Robert Flanders, Brian Fors, Ken Fuchs, John Garguilo, Colin FX Gartska, Monroe Pattillo, John Rhoads, Jeff Rinda, Manny Furst
+
Rita Brahmbhatt, Dan Bowling, Anupriyo Chakravarti, Brett Cohen, Robert Cuyugen, Al Engelbert, Brian Fors, Chad Hays, Sarah Higgins, Brad Lunde, Monroe Pattillo, Robert Flanders, Kristina Wilson, Scott Zaffrin, Khalid Zubaidi, Manny Furst
  
 
== Discussion ==
 
== Discussion ==
Line 87: Line 84:
 
| '''Introductions & Agenda Review''' <br>- Manny
 
| '''Introductions & Agenda Review''' <br>- Manny
 
| '''Status/Discussion:'''
 
| '''Status/Discussion:'''
:  
+
:* No changes
  
 
'''Decisions/Issues:'''
 
'''Decisions/Issues:'''
Line 98: Line 95:
 
| '''Status/Discussion:'''
 
| '''Status/Discussion:'''
  
Those discussed and due Jan. 14 were:
+
Those discussed:
:*  
+
:* ADT for PCD:
:
+
:: - John Donnelly will address this as part of the Showcase focused portion of next week's meeting.
Items with other dates:
+
:: - Manny will check with Bill Klaver, John Donnelly, and Steve Moore to assure that an A04 will be available this year
:
+
:* - A change proposal is indicated and is separately identified as an action item below.
 +
:* Manny will submit details of the PCD Scenarios to John Donnelly. For those not available, at least minimal scripts were requested by Friday.
 +
:* Ruth will provide a Postscript printer to be placed on the kiosk. Manny will ask Colin FX if he can use the same printer, removing the need for the Zebra printers on the clinical walls.
 +
:* Developers were asked to review and complete the data in a spreadsheet that identifies the actors and potential partners for the Connectathon.
 +
:* Any missing data for electrical and network availability is welcome for confirmation of the requests that have been submitted.
 +
:* Preliminary concepts for the New Directions wall include RTM graphics and three profiles (MEM, DPI, ACM AC actor).
 +
:* We will schedule a separate meeting to exercise the scripts.
 +
:* Volunteer docents were invited to assure that PCD can conduct all possible tours in order to provide PCD members with maximum visibility.
 +
:* Manny will ask Steve for a deadline for MAC addresses.
 +
:* Several members (Al, Brett, Cerner (ACM) and Monroe) are ready to begin Virtual Connectathon activities. Developers are confident that they will complete Pre-Connectathon testing next week and most will be able to conduct Virtual Connectathon testing. Those who won't be inhibited by a firewall are confident they will be complete the Virtual Connectathon by February 6. Participants are asked to test with two partners and send emails describing their success to the project manager. Results are not posted in Kudu.
 +
:* Cerner proposed to provide bed alarm data in the Step Down area. Manny will learn if this can be added.
 +
 
 +
Due dates can be found on the Jan. 21 meeting page.
 +
 
 
Those closed were:
 
Those closed were:
:*
+
:* Business card for Showcase w/ all companies listed + Booth numbers - the Showcase handout may address this.
  
 
'''Decisions/Issues:'''  
 
'''Decisions/Issues:'''  
Line 115: Line 125:
 
| '''Issues and Questions''' <br>- Manny
 
| '''Issues and Questions''' <br>- Manny
 
| '''Status/Discussion:'''
 
| '''Status/Discussion:'''
:*  
+
:* Robert noted that the MWB may take 3 to 5 seconds to validate messages. His system will resend the data if an acknowledgement is not received in less time. Brett indicated that the size of Robert's messages is consistent with taking that length of time for MWB validation.
 +
:* Al described the issues surrounding the ADT messages for PIB – the spec calls out ITI-30. One set uses A28, A31, the other has other. None include A04. Last year PCD systems could handle A04 and the Showcase had this available. PIB could be edited to include ITI-31. Someone compliant with PIB may not be able to handle the A04. Cerner doesn’t support A04, but isn’t testing PIB or ADT this year. Manny will check with Bill Klaver, John Donnelly, and Steve Moore to be sure A04 will work this year. A CP is indicated.
  
 
'''Decisions/Issues:'''
 
'''Decisions/Issues:'''
Line 126: Line 137:
  
 
| '''Status/Discussion:'''
 
| '''Status/Discussion:'''
:*  
+
:* DEC and PIV tests are essentially completed. Minor changes have been shared via emails and will be incorporated into the next versions. A meeting is scheduled for tomorrow to review the ACM tests. An update will follow.
  
 
:* Test case development:
 
:* Test case development:
:: -DEC -  
+
:: -DEC - Tests were updated recently and minor changes have been sent by email since then.
:: -
+
:: -ACM - Meeting tomorrow to review, identify and address any issues.
:: -ACM -  
+
:: -PIV - Tests were updated recently and minor changes have been sent by email since then.
:: -PIV -  
+
:: -RTM - John Garguilo was not available.
:: -RTM -  
 
  
 
:* Virtual Connectathon
 
:* Virtual Connectathon
:: -
+
:: - Will begin as noted above.
  
 
'''Decisions/Issues:'''
 
'''Decisions/Issues:'''
Line 142: Line 152:
 
'''Action(s):'''
 
'''Action(s):'''
  
 +
|-
 +
| align="center" | 5
 +
| '''Showcase''' <br>- Manny
 +
| '''Status/Discussion:'''
 +
:* Discussion indicated that DOB, height, weight, medication order should be preloaded and delivered with the ADT message.
 +
:* Business card for Showcase w/ all companies listed + Booth numbers - the Showcase handout may address this.
 +
 +
'''Decisions/Issues:'''
 +
 +
'''Action(s):'''
  
 
|}
 
|}

Latest revision as of 21:40, 14 January 2009

PCD Connectathon/Showcase WG


Action Items

Updated from Jan. 7

Due Dates and Item:

  • Open Date: Monitor registrations are provided periodically.
  • Jan. 7: (Manny) Update on ADT/patient-visitor id and association with systems. Focused meeting, include diagram and other information to be provided.
  • Dec. 23: (All) Provide material for the Scenario (outline or brief description) to be followed by Manny compiling a single view.
  • Identify overarching message (e.g., patient safety. Note that Ray presented the stakeholder survey which showed
  • Survey Slide #17, "Improved Patient Care and Safety" was by far the greatest "incentives for IHE integration"; #2 was "Long term cost reduction"; #3 was improved workflow
  • Workshop discussion suggested we focus on these, with 5 rights, remote alarm communication among the specifics
  • Jan. 14: Zebra has agreed to provide printers. We need to decide between two suggested models.
  • Jan. 14(John Garguilo): Continue to provide updates on how RTM will be tested in Pre-Connectathon, Virtual Connectathon, and Connectathon.
  • (Pump Vendors, Enterprise Systems) Vendors will provide their own approach to bar coding for drugs, infusions, patients and caregivers.
  • Jan. 14(Manny) Created Wiki page for "virtual connectathon" on Connectathon '09 page. Will eventually include, partners, issues list / resolution, status, etc.
  • Jan. 14(Bikram, Rita/Jim Higgins) Identify the devices to be connected to middleware, the coding of parameters, identifying partners for testing and demonstration.
  • Jan. 14(Manny) Coordinate ADT testing (Virtual and Connectathon) with Bill Klaver, coordinate with Steve Moore, John Donnelly, seek a backup system.
  • Jan. 14(Brett) Update name for alarm product
  • Jan. 14 (All) Confirm structure diagrams and utilities
  • Jan. 14: (Todd) Define contents of fourth wall
  • Jan. 6: (Manny)Business card for Showcase w/ all companies listed + Booth numbers
  • Jan. 6?: (Manny) Set PCD Docent training WebEx / on site (and run through at Connectathon)
  • Jan. 14: (All) Webex run through of draft Scenario
  • Jan. 14: (Ken) Update block diagram with locations of SIS, Cerner, Capsule
  • Jan. 14: Steve Moore needs MAC addresses
  • Jan. 19-30: Virtual Connectathon (tentative deadline for completion; partners may test anytime before this)

Agenda

Action Items
Issues and questions about:
  • The MWB
  • HL7
  • Kudu, Connectathon, Showcase
- When will results be posted to Kudu?
- PAM, PDQ for PCD alone - see the DOR tests; for complete PAM, PDQ see MESA tests
- MRNs may be alpha
- Review discussion with John Donnelly, including Kiosk (printer, laptop), preload visitor data (DOB), etc.
  • Report any discrepancies on tests listed for your systems to Manny
Connectathon Planning
  • Status report on Test Case development for Pre-Connectathon, Virtual Connectathon, Connectathon
- DEC - minor changes to come
- ACM - meeting on Thursday
- PIV - updated version posted
- RTM -
- Watch emails for additional changes
  • Decision on which tests to use for Virtual Connectathon and Connectathon
  • Scheduling the Virtual Connectathon
  • NIST validation of RTM:
Showcase Planning
  • Scenario update
-Wiki page for Scripts
  • Showcase Structure
- Drawings, only minor changes are required
- Utilities (electric, network)
- Physical requirements (size, mounts if larger, etc)
- Logos -
- Signs thanking supporters
Timeline

Participants

Rita Brahmbhatt, Dan Bowling, Anupriyo Chakravarti, Brett Cohen, Robert Cuyugen, Al Engelbert, Brian Fors, Chad Hays, Sarah Higgins, Brad Lunde, Monroe Pattillo, Robert Flanders, Kristina Wilson, Scott Zaffrin, Khalid Zubaidi, Manny Furst

Discussion

Review of Meeting Notes: Corrections should be made to the Wiki; significant issues placed on agenda of the next meeting

Item Topic Discussion
1 Introductions & Agenda Review
- Manny
Status/Discussion:
  • No changes

Decisions/Issues:

Action(s):

2 Action Items
- Manny
Status/Discussion:

Those discussed:

  • ADT for PCD:
- John Donnelly will address this as part of the Showcase focused portion of next week's meeting.
- Manny will check with Bill Klaver, John Donnelly, and Steve Moore to assure that an A04 will be available this year
  • - A change proposal is indicated and is separately identified as an action item below.
  • Manny will submit details of the PCD Scenarios to John Donnelly. For those not available, at least minimal scripts were requested by Friday.
  • Ruth will provide a Postscript printer to be placed on the kiosk. Manny will ask Colin FX if he can use the same printer, removing the need for the Zebra printers on the clinical walls.
  • Developers were asked to review and complete the data in a spreadsheet that identifies the actors and potential partners for the Connectathon.
  • Any missing data for electrical and network availability is welcome for confirmation of the requests that have been submitted.
  • Preliminary concepts for the New Directions wall include RTM graphics and three profiles (MEM, DPI, ACM AC actor).
  • We will schedule a separate meeting to exercise the scripts.
  • Volunteer docents were invited to assure that PCD can conduct all possible tours in order to provide PCD members with maximum visibility.
  • Manny will ask Steve for a deadline for MAC addresses.
  • Several members (Al, Brett, Cerner (ACM) and Monroe) are ready to begin Virtual Connectathon activities. Developers are confident that they will complete Pre-Connectathon testing next week and most will be able to conduct Virtual Connectathon testing. Those who won't be inhibited by a firewall are confident they will be complete the Virtual Connectathon by February 6. Participants are asked to test with two partners and send emails describing their success to the project manager. Results are not posted in Kudu.
  • Cerner proposed to provide bed alarm data in the Step Down area. Manny will learn if this can be added.

Due dates can be found on the Jan. 21 meeting page.

Those closed were:

  • Business card for Showcase w/ all companies listed + Booth numbers - the Showcase handout may address this.

Decisions/Issues:

Action(s):

  • As above.
3 Issues and Questions
- Manny
Status/Discussion:
  • Robert noted that the MWB may take 3 to 5 seconds to validate messages. His system will resend the data if an acknowledgement is not received in less time. Brett indicated that the size of Robert's messages is consistent with taking that length of time for MWB validation.
  • Al described the issues surrounding the ADT messages for PIB – the spec calls out ITI-30. One set uses A28, A31, the other has other. None include A04. Last year PCD systems could handle A04 and the Showcase had this available. PIB could be edited to include ITI-31. Someone compliant with PIB may not be able to handle the A04. Cerner doesn’t support A04, but isn’t testing PIB or ADT this year. Manny will check with Bill Klaver, John Donnelly, and Steve Moore to be sure A04 will work this year. A CP is indicated.

Decisions/Issues:

Action(s):

4 Connectathon Planning
- Manny
Status/Discussion:
  • DEC and PIV tests are essentially completed. Minor changes have been shared via emails and will be incorporated into the next versions. A meeting is scheduled for tomorrow to review the ACM tests. An update will follow.
  • Test case development:
-DEC - Tests were updated recently and minor changes have been sent by email since then.
-ACM - Meeting tomorrow to review, identify and address any issues.
-PIV - Tests were updated recently and minor changes have been sent by email since then.
-RTM - John Garguilo was not available.
  • Virtual Connectathon
- Will begin as noted above.

Decisions/Issues:

Action(s):

5 Showcase
- Manny
Status/Discussion:
  • Discussion indicated that DOB, height, weight, medication order should be preloaded and delivered with the ADT message.
  • Business card for Showcase w/ all companies listed + Booth numbers - the Showcase handout may address this.

Decisions/Issues:

Action(s):

Return to main WG page which has links to individual meeting pages

Return to main PCD Connectathon/Showcase WG page: PCD_Connectathon&Showcase_WG_2008-9