Difference between revisions of "PCD Connectathon&Showcase 2008-12-10 Webex"

From IHE Wiki
Jump to navigation Jump to search
m (→‎Agenda: udpate)
m (→‎Action Items: update)
Line 5: Line 5:
  
 
Due Dates and Item:
 
Due Dates and Item:
'''Need to update with discussion and action items from 12/3'''
 
  
 
:* Open Date: Monitor registrations for various actors.  
 
:* Open Date: Monitor registrations for various actors.  
:* Dec. 3 (Updated, moved): (Ruth) Does GE Enterprise include the 5-rights data entry?
+
:* Dec. 10: (Robert will check with Ruth) Does GE Enterprise include the 5-rights data entry?
:* Dec. 3 (Updated, moved): Al provided information about PAM, the need for A04 which is in ITI-31, not ITI-30, will be part of patient ID issue  
+
:* Dec. 10: Special meeting to address ADT, other ID. Al had provided information about PAM, the need for A04 which is in ITI-31, not ITI-30, will be part of patient ID issue  
:* Dec. 3 (Updated, moved): (Colin FX/ Ruth) - summarize patient ID/registration requirements / issues from discussion. Group will review and discuss in a subsequent WebEx session.  
+
:* Dec. 10: (Colin FX/ Ruth) - summarize patient ID/registration requirements / issues from discussion. Group will review and discuss in a subsequent WebEx session.  
:* Dec. 3 (Moved): (Bikram) Describe the approach Capsule wants to take to have bidirectional distributed demo - pushing data in from their booth to the demo.  
+
:* Dec. 10: (Bikram) Now unlikely to have bidirectional distributed demo - pushing data in from their booth to the demo.  
:* Dec. 3 (Moved): (All) Provide material for the Scenario (outline or brief description) to be followed by Manny compiling a single view.
+
:* Dec. 10: (All) Provide material for the Scenario (outline or brief description) to be followed by Manny compiling a single view.
:* Dec. 3 (Moved): Sarah Higgins identified contacts at Datamax and Zebra. Manny to talk with them about bar code printers.  
+
:* Dec. 10: Datamax and Zebra have been approached. Zebra appears willing. Manny to talk with them about bar code printers again after today's meetings.  
:* Dec. 3 (Moved): Determine how RTM will be tested in Pre-Connectathon, Virtual Connectathon, and Connectathon.
+
:* Dec. 10 (John Garguilo): Determine how RTM will be tested in Pre-Connectathon, Virtual Connectathon, and Connectathon.
:* Dec. 3: (Manny) Learn if HIMSS Convention Registration will include an MRN barcode, what the barcode standard will be
+
:* Dec. 10: (Manny) Learn if HIMSS Convention Registration will include an MRN barcode, what the barcode standard will be
 
::* (Pump Vendors, Enterprise Systems) Establish bar coding for drugs, infusions, patients
 
::* (Pump Vendors, Enterprise Systems) Establish bar coding for drugs, infusions, patients
::* (All) Patient IDs, ADT/PIB issues
+
::* (All) Patient IDs, ADT/PIB issues, device and caregiver ID
:* Dec. 3: (Manny) Create Wiki page for "virtual connectathon" on Connectathon '09 page. Include, partners, issues list / resolution, status, etc.  
+
:* Dec. 10: (Manny) Created Wiki page for "virtual connectathon" on Connectathon '09 page. Will eventually include, partners, issues list / resolution, status, etc.  
:* Dec. 3: (All) Identify overarching message (e.g., patient safety. Note that Ray presented the stakeholder survey which showed
+
:* Dec. 10: (All) Identify overarching message (e.g., patient safety. Note that Ray presented the stakeholder survey which showed
 
::* Survey Slide #17, "Improved Patient Care and Safety" was by far the greatest "incentives for IHE integration"; #2 was "Long term cost reduction"; #3 was improved workflow  
 
::* Survey Slide #17, "Improved Patient Care and Safety" was by far the greatest "incentives for IHE integration"; #2 was "Long term cost reduction"; #3 was improved workflow  
 
::* Workshop discussion suggested we focus on these, with 5 rights, remote alarm communication among the specifics
 
::* Workshop discussion suggested we focus on these, with 5 rights, remote alarm communication among the specifics
:* Dec. 3: (Bikram, Jim Higgins) Identify the devices to be connected to middleware
+
:* Dec. 10: (Bikram, Rita/Jim Higgins) Identify the devices to be connected to middleware
 
:* Dec. 18: (Moved) (Manny) Coordinate ADT testing (Virtual and Connectathon) with Bill Klaver, coordinate with Steve Moore, John Donnelly, seek a backup system.
 
:* Dec. 18: (Moved) (Manny) Coordinate ADT testing (Virtual and Connectathon) with Bill Klaver, coordinate with Steve Moore, John Donnelly, seek a backup system.
 
:* Dec. 18:(Brett) Update name for alarm product
 
:* Dec. 18:(Brett) Update name for alarm product
Line 28: Line 27:
 
:* ? Steve Moore needs MAC addresses
 
:* ? Steve Moore needs MAC addresses
 
:* Dec. 18:(Emergin, LiveData) Schedule Connectathon on site testing with Polycom
 
:* Dec. 18:(Emergin, LiveData) Schedule Connectathon on site testing with Polycom
 +
:* Jan. 6: Define contents of fourth wall
 
:* Jan. 6:(Manny) Business card for Showcase w/ all companies listed + Booth numbers
 
:* Jan. 6:(Manny) Business card for Showcase w/ all companies listed + Booth numbers
 
:* Jan. 6?: (Manny) Set PCD Docent training WebEx / on site (and run through at Connectathon)
 
:* Jan. 6?: (Manny) Set PCD Docent training WebEx / on site (and run through at Connectathon)
 
:* Jan. 6?(All) Webex run through of draft Scenario
 
:* Jan. 6?(All) Webex run through of draft Scenario
 +
:* Jan. 19-30: Virtual Connectathon (tentative deadline for completion; partners may test anytime before this)
  
 
== Agenda ==
 
== Agenda ==

Revision as of 10:07, 10 December 2008

PCD Connectathon/Showcase WG


Action Items

Due Dates and Item:

  • Open Date: Monitor registrations for various actors.
  • Dec. 10: (Robert will check with Ruth) Does GE Enterprise include the 5-rights data entry?
  • Dec. 10: Special meeting to address ADT, other ID. Al had provided information about PAM, the need for A04 which is in ITI-31, not ITI-30, will be part of patient ID issue
  • Dec. 10: (Colin FX/ Ruth) - summarize patient ID/registration requirements / issues from discussion. Group will review and discuss in a subsequent WebEx session.
  • Dec. 10: (Bikram) Now unlikely to have bidirectional distributed demo - pushing data in from their booth to the demo.
  • Dec. 10: (All) Provide material for the Scenario (outline or brief description) to be followed by Manny compiling a single view.
  • Dec. 10: Datamax and Zebra have been approached. Zebra appears willing. Manny to talk with them about bar code printers again after today's meetings.
  • Dec. 10 (John Garguilo): Determine how RTM will be tested in Pre-Connectathon, Virtual Connectathon, and Connectathon.
  • Dec. 10: (Manny) Learn if HIMSS Convention Registration will include an MRN barcode, what the barcode standard will be
  • (Pump Vendors, Enterprise Systems) Establish bar coding for drugs, infusions, patients
  • (All) Patient IDs, ADT/PIB issues, device and caregiver ID
  • Dec. 10: (Manny) Created Wiki page for "virtual connectathon" on Connectathon '09 page. Will eventually include, partners, issues list / resolution, status, etc.
  • Dec. 10: (All) Identify overarching message (e.g., patient safety. Note that Ray presented the stakeholder survey which showed
  • Survey Slide #17, "Improved Patient Care and Safety" was by far the greatest "incentives for IHE integration"; #2 was "Long term cost reduction"; #3 was improved workflow
  • Workshop discussion suggested we focus on these, with 5 rights, remote alarm communication among the specifics
  • Dec. 10: (Bikram, Rita/Jim Higgins) Identify the devices to be connected to middleware
  • Dec. 18: (Moved) (Manny) Coordinate ADT testing (Virtual and Connectathon) with Bill Klaver, coordinate with Steve Moore, John Donnelly, seek a backup system.
  • Dec. 18:(Brett) Update name for alarm product
  • Dec. 18: (Manny, pump vendors, any others) Wireless spectrum management. Didi is not supportive of addressing this throughout the convention hall, recommends approaching John Donnelly. Manny will contact John.
  • ? Steve Moore needs MAC addresses
  • Dec. 18:(Emergin, LiveData) Schedule Connectathon on site testing with Polycom
  • Jan. 6: Define contents of fourth wall
  • Jan. 6:(Manny) Business card for Showcase w/ all companies listed + Booth numbers
  • Jan. 6?: (Manny) Set PCD Docent training WebEx / on site (and run through at Connectathon)
  • Jan. 6?(All) Webex run through of draft Scenario
  • Jan. 19-30: Virtual Connectathon (tentative deadline for completion; partners may test anytime before this)

Agenda

Action Items (see above, this page)
Issues and questions about:
  • The Trial Implementation version of any profiles
  • Registration update; PIV registrations of DEC as option or full listing
  • The MWB
  • HL7
- Version 2.6 vs 2.5
  • Kudu, Installation Test, CT and PAM, PDQ
- PAM, PDQ for PCD alone - see the DOR tests; for complete PAM, PDQ see MESA tests
  • Visitor/patient, caregiver, device ID; follow up to earlier special meeting if necessary
Connectathon and Showcase Planning
  • Welcome to Surgical Information Systems
  • Scenario update
- Wiki page for Scripts
  • Showcase Structure
- Drawings, only minor changes are required
- Utilities (electric, network, wireless)
- Physical requirements (size, mounts if larger, etc)
- Logos - one per company - which sides?
  • Status report on Test Case development for Pre-Connectathon, Virtual Connectathon, Connectathon
- DEC - revised 2008 version out for review for Pre-Connectathon, Connectathon tests
Decision on which tests to use for Virtual Connectathon will follow
- ACM - concept out for review
- PIV - concept has been reviewed, request drug information
- RTM - NIST
  • Will be entered into Kudu ASAP for Pre-Connectathon and Connectathon testing
- Virtual Connectathon testing is separate from these

Participants

Dan Bowling, Rita Brahmbhatt, Anupriyo Chakravarti, Bikram Day, Al Engelbert, Robert Flanders, Brian Fors, John Garguilo, Karen Jimenez, Brad Lunde, Gary Meyer, Monroe Pattillo, John Rhoads, Khalid Zubaidi, Manny Furst

Discussion

Review of Meeting Notes: Corrections should be made to the Wiki; significant issues placed on agenda of the next meeting

Item Topic Discussion
1 Introductions & Agenda Review
- Manny
Status/Discussion:

Decisions/Issues:

Action(s):

2 Action Items
- Manny
Status/Discussion:

The following were updated:

Decisions/Issues:

Action(s):

3 Issues and Questions
- Manny
Status/Discussion:

Decisions/Issues:

Action(s):

4 Connectathon Planning
- Manny
Status/Discussion:

Status Report on Test Case Development

  • DEC:
  • ACM:
  • PIV:
  • RTM:

Virtual Connectathon

Decisions/Issues:

Action(s):

5 Showcase Planning
- Manny
Status/Discussion:

Structure

Scenario Script

Decisions/Issues:

Action(s):


Return to main WG page which has links to individual meeting pages

Return to main PCD Connectathon/Showcase WG page: PCD_Connectathon&Showcase_WG_2008-9