Difference between revisions of "MarComm Cmte Teleconference Minutes 2013-10-02"
Jump to navigation
Jump to search
Chrisdcarr (talk | contribs) |
|||
Line 26: | Line 26: | ||
* October email blast | * October email blast | ||
:* Content for messaging: North America Connectathon selling points, timeline, reg details; IHE Europe Connectathon press release; RO Connectathon (April/May 2014) | :* Content for messaging: North America Connectathon selling points, timeline, reg details; IHE Europe Connectathon press release; RO Connectathon (April/May 2014) | ||
+ | :**possibly move up the blast date from its original 10/15 date since connectathon registration ends on 10/18 | ||
* Orientation Materials | * Orientation Materials |
Revision as of 10:10, 2 October 2013
Attendees
- Lapo Bertini
- Chris Carr
- John Donnelly
- Nichole Drye-Mayo
- La Shawn Edwards
- Adrianne Glowski
- Chris Lindop
- Joan McMillen
- Nancy Ramirez
- Celina Roth
- Erin Sparnon
Minutes
- Update World Summit
- Event planned for Feb. 20-21 (preceding HIMSS meeting) in Orlando, FL
- Global Deployment Coordination Committee (GDC)
- Looking at new dates to hold open GDC meeting for attendees attending HIMSS conference as well as the World Summit
- Two people are putting together two development tracks as well as development panel.
- Input will be sought from the Mar Comm committee as to who and how to Market the event.
- USA-EU Collaboration
- October email blast
- Content for messaging: North America Connectathon selling points, timeline, reg details; IHE Europe Connectathon press release; RO Connectathon (April/May 2014)
- possibly move up the blast date from its original 10/15 date since connectathon registration ends on 10/18
- Content for messaging: North America Connectathon selling points, timeline, reg details; IHE Europe Connectathon press release; RO Connectathon (April/May 2014)
- Orientation Materials
- Updates to participation page
- Automated message to Google Group registrants
- Social Media Update
- Channels in use
- Messages for posting
- Photos/videos
- Marketing plan. Review areas that need updating Marketing Plan - Discussion deferred.