Difference between revisions of "ITI Change Proposals 2020-21"

From IHE Wiki
Jump to navigation Jump to search
Line 150: Line 150:
  
 
'''The ITI CP tracking spreadsheet''' is [https://docs.google.com/spreadsheets/d/1gdr_Y8xZBvbb326J4z67cqprxOexFgtkPj_VlD3rB9E/edit#gid=0 here].
 
'''The ITI CP tracking spreadsheet''' is [https://docs.google.com/spreadsheets/d/1gdr_Y8xZBvbb326J4z67cqprxOexFgtkPj_VlD3rB9E/edit#gid=0 here].
 +
 +
'''(0) Sarah's new role in CP processing support'''
  
 
'''(1) [https://drive.google.com/drive/folders/1T-dXZIJDgWvwKwQsui0H5bmvkmmo0rX3 Assigned CPs]  ready for discussion'''  
 
'''(1) [https://drive.google.com/drive/folders/1T-dXZIJDgWvwKwQsui0H5bmvkmmo0rX3 Assigned CPs]  ready for discussion'''  

Revision as of 09:12, 13 August 2020

This page contains the details of Change Proposal (CP) processing in the ITI domain for the 2020-21 publication cycle.

The ITI Change Proposal process follows the general IHE CP process described on the Change Proposal process page. The following sections give more detail on the process for folks involved in the CP process in the ITI domain.

The ITI-specific CP Process

The following text explains what the process used by the ITI technical committee in processing submitted CPs. It is consistent with the general IHE CP process and is informative only.

  1. Write a change proposal. Here is IHE's Change Proposal Template.
  2. Submit into the Incoming folder on the IHE Google Drive. This is typically done by directly uploading the CP into the folder (if you have access); otherwise, send it an email to the ITI Technical Committee members in charge of CPs (currently Lynn Felhofer or to an ITI Technical Committee co-chair).
  3. The new CPs are considered by the committee at periodic CP review calls. If CP is accepted it is given a CP #, assigned an editor, renamed to CP-ITI-xxx-00.doc and placed in the Assigned folder. If CP is rejected it is moved to the Rejected folder and the submitter is informed of explanation for rejection. Likely reasons for rejection are: duplicate, merged, withdrawn or not enough information to understand the request. Rejected CPs can be resubmitted with more information for reconsideration.
  4. Committee works with editor to draft the CP. Versions are kept in Assigned directory and numbered -00, -01, -02, etc.
  5. Committee decides CP is ready for ballot. Latest version of CP is moved to the Completed folder and old versions are moved to old_versions.
  6. ITI Tech co-chair or CP manager collects Completed CPs into a ballot. The Ballots folder will be used for this.
  7. Ballot is released to the general community for voting for 4 weeks
  8. Votes and comments are collected. All yes votes means the CP passed ballot and moved to Final Text. No votes are resolved by the committee. Sometimes CP is withdrawn, sometimes NO voter changes to yes vote after explanations. CP may be updated in this process. If updates are insignificant (clarification only) the CP is considered passed. If updates are significant the CP is submitted for another ballot.
  9. CP approved in ballot are put in Final Text status and scheduled to be integrated into the Technical Framework or Supplement.
  1. CP status and ballots are tracked here

Change Proposal pages from previous years

Prior years work can be accessed at:

ITI CP Tracking

Location of CPs

All Change Proposal management is done on the IHE Documents on Google Drive here.

As CPs are processed through various statuses they move from one folder to another. The directories involved are:

Incoming
contains CPs which have been submitted but have not been assigned a CP number or an editor. This is the place that new incoming CPs are placed prior to the first stage of processing by the committee.
Assigned
contains CPs that have been assigned an editor and are being actively worked on by the committee, i.e. Assigned status
Completed
contains the last version of a CP that is in Completed status. Its contents are approved by the Technical Committee and the CP is waiting to be put in a ballot.
Final Text
contains the last version of a CP that is in FinalText status. It is has been approved by ballot and is waiting to be integrated into the TF in the upcoming publication cycle.
Integrated
contains the version of the CP that was integrated into the TF, organized by year.
Rejected
CPs that have been submitted but rejected by the committee
Cancelled
contains CPs that were once assigned but have been cancelled, i.e. Cancelled status
Ballots
contains Ballots that have been released for voting by the general community, organized by year.

CP status

ITI tracks status of its Change Proposals in this google doc: https://docs.google.com/spreadsheets/d/1gdr_Y8xZBvbb326J4z67cqprxOexFgtkPj_VlD3rB9E/edit?usp=sharing The Active CPs tab contains those that are Assigned, Completed, or Final Text in this cycle. There are also archive tabs for prior years.

Approved CPs integrated into the ITI Technical Framework

CPs that have passed ballot in since 2015, and that have been, or will be, integrated into the ITI Technical Framework are listed on this Log of Approved CPs.

CPs that have already been integrated into the Technical Framework are stored here.

The ITI Technical Committee integrates CPs into Technical Framework documents following this process : ITI CP Integration Process

Ballots

Ballot 57

Out for ballot: tbd 2020. Comments/votes resolved on the xxx yy,2020 CP review call.

Ballot 57 CPs are on Google Drive under IHE Documents here.

Comments, votes & resolution are here.

CP-ITI Title Ballot Result
1207-01 PMIR clarification - use of RelatedPerson
1209-02 Add Add formatCode XACML information to APPC
1212-00 XCPD Examples Include Error In detectedIssueEvent.code
1214-00 PIXm: Error with Code on OperationOutcome
1215-00 PIXm examples fix
1216-00 RMD: Fix error in audit specification for ITI-62 for the Registry
1217-00 XDS MU and RMU – update on error reporting
...


Assigned CPs

For a list of CPs that are currently assigned see the 'Active CPs' tab in the CP status google doc.

Assigned CPs are stored here.

Strategies for smarter CP processing (from Jul-17 F2F)

We often have CPs that need a lot of rework after ballot:

  • There is not enough review prior to ballot
  • Perhaps too much effort on specificity vs remaining silent
  • Look for opportunities to suggest that a small subset take a time-consuming or editorial problem offline and come back to the group with an updated change.

Gateway questions prior to accepting a CP (or finishing work on an existing CP):

  • Is solving the problem necessary for interoperability?
  • Has an implementer reported this problem, or should they, or... is this theoretical?
  • Is the text inconsistent? If so, are we over-specifying, i.e. can we delete the inconsistency?
  • Strongly suggest that a submitter propose a solution.
  • Is this a problem that needs to be fixed?

Upcoming CP discussions

ITI CP review calls are typically held the second Thursday of each month from 10-11am Central US. Additional sessions will be scheduled on Tues & Thurs of ITI Tech F2F meetings. Changes to the 'traditional' schedule for CP calls are announced on the ititech email list.

August 13, 2020

Time: 10:00 - 11:00 CDT

Webex link:https://himss.zoom.us/j/91798770528?pwd=NlYrYlhUL1B3eFhFVVlPZnZIRW5Mdz09

Meeting: 917 9877 0528

Password: Meeting1

Attendees:

The ITI CP tracking spreadsheet is here.

(0) Sarah's new role in CP processing support

(1) Assigned CPs ready for discussion

  • CP-ITI-1213-01: XCPD Revoke – Add Additional Context Information (Spencer)
  • CP-ITI-1203-07: PMIR: clarify management of Patient Master Identity (Lynn)

(2) Process Incoming CPs

  • CP-ITI-addFeedTransactionToPIXm.docx
  • CP-ITI-JB-RMD-auditError.doc
  • CP-ITI-LF-addATNAoptionNote.docx
  • CP-ITI-JML_XCDRClarifyChangePatientIDOptionality.doc
  • CP-ITI-JML_XCDRClarifyErrorHandling.doc
  • CP-ITI-JML_XDRClarifyPatientIdPopulationHandling.doc

(3) Next in CPs

  • Confirm Ballot 57 timing
    • Aug 14 - Ballot released
    • Sep 11 - Votes/comments due
    • Sep ?? - Ballot 57 resolution call
  • Next regular CP call is the 2nd Thurs in Sept: Sep 10, 10:00-11:00 CDT.

September 10, 2020

Time: 10:00 - 11:00 CDT

Zoom link:https://himss.zoom.us/j/91798770528?pwd=NlYrYlhUL1B3eFhFVVlPZnZIRW5Mdz09

Meeting: 917 9877 0528

Password: Meeting1

Attendees:

The ITI CP tracking spreadsheet is here.

(1) Assigned CPs ready for discussion

  • ...


(2) Process Incoming CPs

  • ...

(3) Next in CPs

  • ...
  • Next regular CP call is the 2nd Thurs in Oct: Oct 8, 10:00-11:00 CDT.

Minutes from past CP calls

See ITI CPs 2020-21-Agenda and Minutes from past CP calls