Line 110: Line 110:
  
 
ITI CP review calls are typically held every '''Thursday''' from '''10-11am Central US'''.  Additional sessions may be scheduled during ITI Tech F2F meetings.  Changes to the 'traditional' schedule for CP calls are announced on the ititech email list.
 
ITI CP review calls are typically held every '''Thursday''' from '''10-11am Central US'''.  Additional sessions may be scheduled during ITI Tech F2F meetings.  Changes to the 'traditional' schedule for CP calls are announced on the ititech email list.
 
== June 6, 2019 ==
 
 
'''Attendees:'''  Joe Lamy (Aegis/SSA), John Moehrke (By Light), Matt Blackmon (Sequoia), Spencer LaGesse (Epic), Oliver Egger (ahdis), Massimiliano Masi (Tiani-Spirit), Walco van Loon, Paul Lomayesva (Intersystems), Lynn Felhofer
 
 
'''The ITI CP tracking spreadsheet''' is [https://docs.google.com/spreadsheets/d/1gdr_Y8xZBvbb326J4z67cqprxOexFgtkPj_VlD3rB9E/edit#gid=0 here].
 
 
'''(1) Incoming CPs''' ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/
 
* '''CP-ITI-PDQM-clarifyFamilySearch.doc''' (Oliver) - accepted as CP 1174.  Approved as Completed and ready for future Ballot 54.
 
* The following CPs were deferred to a future call:
 
** CP-ITI-DEN-mismatch-SecurityConsiderations.doc
 
** CP-ITI-KB-fixBrokenLinksInAppxO.doc
 
*** also supplemental info in CP-ITI-KB-BrokenLinksVol2x.txt
 
** CP-ITI-KB-fixOWaspLinkAppxV.doc
 
 
'''(2) Assigned CPs for Review'''  ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/1_Assigned/
 
* '''CP-ITI-907 - IUA Maintenance and alignment with FHIR initiatives''' (Walco) - after some discussion, the group agreed that the best path forward Walco and Massi to draft a work item proposal for needed updates to XUA.  Next steps:
 
** John will send the work item proposal template to Walco.
 
** Walco and Massi will prepare a work item proposal to present to the ITI Planning Cmte at their next scheduled call on 18-June.  John advised that the work item proposal include information about the '''need''' for the update, as well as the planned scope of the update, so that the Planning Cmte can prioritize the work.  The
 
** Lynn will send Walco the Word version of the current-published IUA and look for any other open IUA CPs
 
** The soonest that the ITI Tech Committee can consider this work item (assuming it is approved) is at their F2F meeting at the end of July.
 
** In the interim, Walco and Massi can work on the proposed updates to the Supplement. 
 
** With the continuous development model, it is possible that IUA could be updated (re-published) by the end of 2019, but the preliminary steps above need to be completed before timing could be confirmed
 
** When/if the workitem is approved, this CP will be cancelled
 
* '''CP-ITI-897 - Clarify that rqmts in ITI-19 provide a baseline set, and are not mandated at all deployments''' (John) - discussed and approved as Completed and ready for future Ballot 54
 
* '''CP-ITI-1047 - Remove mandatory User Authentication from ITI-19''' (John) - discussed and approved as Completed and ready for future Ballot 54
 
* '''CP-ITI-1151 - ATNA Authenticate-Node clarity - Update options in Vol 1''' (John) - John has proposed a revamping of ATNA actors' options that relate to TLS (ITI-19). 
 
 
'''(3) Next in CPs'''
 
* If you plan to attend CP calls in the coming months, please indicate your availability using '''[https://docs.google.com/spreadsheets/d/1VQLLhH5gMPDvKB9eUgirE0WUW9pGX8NG6jMhwA-6DII/edit?usp=sharing this google doc]''' so we can make efficient use of our CP review time.
 
* CP integration is currently on-going.  Look for the '''Pub2019''' tab on the [https://docs.google.com/spreadsheets/d/1gdr_Y8xZBvbb326J4z67cqprxOexFgtkPj_VlD3rB9E/edit#gid=1259271186 CP tracking spreadsheet] to see editor assignments and schedule for CP integration & republishing updated ITI TF docs.
 
  
 
== June 13, 2019 ==
 
== June 13, 2019 ==

Revision as of 17:26, 6 June 2019

This page contains the details of Change Proposal (CP) processing in the ITI domain for the 2019-20 publication cycle.

The ITI Change Proposal process follows the general IHE CP process described on the Change Proposal process page. The following sections give more detail on the process for folks involved in the CP process in the ITI domain.

The ITI-specific CP Process

The following text explains what the process used by the ITI technical committee in processing submitted CPs. It is consistent with the general IHE CP process and is informative only.

  1. Write a change proposal. Here is IHE's Change Proposal Template
  2. Submit into the Incoming directory. This is typically done by directly updating the directory if you have access; otherwise send it an email to the ITI Technical Committee members in charge of CPs (currently Lynn Felhofer).
  3. The new CPs are considered by the committee at periodic CP review calls. If CP is accepted it is given a CP #, assigned an editor, renamed to CP-ITI-xxx-00.doc and placed in Assigned. If CP is rejected it is moved to Rejected and submitter is informed of explanation for rejection. Likely reasons for rejection are: duplicate, merged, withdrawn or not enough information to understand the request. Rejected CPs can be resubmitted with more information for reconsideration.
  4. Committee works with editor to draft the CP. Versions are kept in Assigned directory and numbered -00, -01, -02, etc.
  5. Committee decides CP is ready for ballot. Latest version of CP is moved to Completed diretory and old versions are moved to old_versions.
  6. ITI Tech co-chair or CP manager collects Completed CPs into a ballot. The Ballot directory will be used for this.
  7. Ballot is released to the general community for voting for 4 weeks
  8. Votes and comments are collected. All yes votes means the CP passed ballot and moved to Final Text. No votes are resolved by the committee. Sometimes CP is withdrawn, sometimes NO voter changes to yes vote after explanations. CP may be updated in this process. If updates are insignificant (clarification only) the CP is considered passed. If updates are significant the CP is submitted for another ballot.
  9. CP approved in ballot are put in Final Text status and scheduled to be integrated into the Technical Framework or Supplement.
  10. CP status and ballots are tracked here

Change Proposal pages from previous years

Prior years work can be accessed at:

ITI CP Tracking

Location of CPs

All Change Proposal management is done on the IHE ftp site here.

As CPs are processed through various statuses they move from one directory to another. The directories involved are:

Incoming
contains CPs which have been submitted but have not been assigned a CP number or an editor. This is the place that new incoming CPs are placed prior to the first stage of processing by the committee.
Assigned
contains CPs that have been assigned an editor and are being actively worked on by the committee, i.e. Assigned status
Completed
contains the last version of a CP that is in Completed status. Its contents are approved by the Technical Committee and the CP is waiting to be put in a ballot.
FinalText
contains the last version of a CP that is in FinalText status. It is has been approved by ballot and is waiting to be integrated into the TF in the upcoming publication cycle.
Integrated
contains the version of the CP that was integrated into the TF, organized by year.
Rejected
CPs that have been submitted but rejected by the committee
Cancelled
contains CPs that were once assigned but have been cancelled, i.e. Cancelled status
Ballots
contains Ballots that have been released for voting by the general community, organized by year.

CP status

ITI tracks status of its Change Proposals in this google doc: https://docs.google.com/spreadsheets/d/1gdr_Y8xZBvbb326J4z67cqprxOexFgtkPj_VlD3rB9E/edit?usp=sharing The Active CPs tab contains those that are Assigned, Completed, or Final Text in this cycle. There are also archive tabs for prior years.

Approved CPs integrated into the ITI Technical Framework

CPs that have passed ballot in since 2015, and that have been, or will be, integrated into the ITI Technical Framework are listed on this Log of Approved CPs.

CPs that have already been integrated into the Technical Framework are stored here: ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/4_Integrated/

The ITI Technical Committee integrates CPs into Technical Framework documents following this process : ITI CP Integration Process

Ballots

Ballot (future)

Out for ballot: tbd - tbd, 2019. Comments/votes resolved on the xxx yy, 2019 CP review call.

Ballot xx CPs are here:

Comments, votes & resolution are <tbd>

CP-ITI Title Ballot Result


Assigned CPs

For a list of CPs that are currently assigned see the 'Active CPs' tab in the CP status google doc.

Assigned CPs are stored here: ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/1_Assigned/

Strategies for smarter CP processing (from Jul-17 F2F)

We often have CPs that need a lot of rework after ballot:

  • There is not enough review prior to ballot
  • Perhaps too much effort on specificity vs remaining silent
  • Look for opportunities to suggest that a small subset take a time-consuming or editorial problem offline and come back to the group with an updated change.

Gateway questions prior to accepting a CP (or finishing work on an existing CP):

  • Is solving the problem necessary for interoperability?
  • Has an implementer reported this problem, or should they, or... is this theoretical?
  • Is the text inconsistent? If so, are we over-specifying, i.e. can we delete the inconsistency?
  • Strongly suggest that a submitter propose a solution.
  • Is this a problem that needs to be fixed?

Upcoming CP discussions

ITI CP review calls are typically held every Thursday from 10-11am Central US. Additional sessions may be scheduled during ITI Tech F2F meetings. Changes to the 'traditional' schedule for CP calls are announced on the ititech email list.

June 13, 2019

Time: 10:00 - 11:00 CDT

Webex link: https://himss.webex.com/himss/j.php?MTID=m0c4797d303b0ef85bc37ae2f1e30ee61

Meeting: 926 847 156

Password: Meeting1

Attendees:

The ITI CP tracking spreadsheet is here.

(1) Assigned CPs for Review ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/1_Assigned/

  • CP-ITI-1151-01 - ATNA Authenticate-Node clarity – Update options in Vol 1 (John)
    • Refer to Final Text CP-ITI-1145 (Add three options affecting [ITI-19] Authenticate Node) to see current options for ATNA actors


(2) (if time) Incoming CPs ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/

  • CP-ITI-DEN-mismatch-SecurityConsiderations.doc
  • CP-ITI-KB-fixBrokenLinksInAppxO.doc
    • also supplemental info in CP-ITI-KB-BrokenLinksVol2x.txt
  • CP-ITI-KB-fixOWaspLinkAppxV.doc

(3) Next in CPs

  • CP integration is currently on-going. Look for the Pub2019 tab on the CP tracking spreadsheet to see editor assignments and schedule for CP integration & republishing updated ITI TF docs.

Minutes from past CP calls

See ITI CPs 2018-19-Agenda and Minutes from past CP calls