Difference between revisions of "ITI Change Proposals 2016"

From IHE Wiki
Jump to navigation Jump to search
Line 338: Line 338:
 
=== Minutes ===
 
=== Minutes ===
  
'''Attendees:'''
+
'''Attendees: Ken M, Gila P, Rob H, Tarik I, Manuel M, John M, Elliott L, Karen W.'''
  
 
'''(1) Assigned CP outcomes'''
 
'''(1) Assigned CP outcomes'''
* CP-ITI-914-02 -  
+
* CP-ITI-914-02 - Elliott L presented his CP for discussion. Elliott will send it to Bill for review to verify correctness.
* CP-ITI-910-01 -  
+
* CP-ITI-910-01 - Could not review as Dick Donkers was unable to attend.
* CP-ITI-902-01 -  
+
* CP-ITI-902-01 - John M is proposing to add the words "some regions also required conformance to ISO 17090, which includes additional certificate issuing, content, and validation rules" to section 5.5.2. Gila will email IHE-J to see what they think. If they require more than that, we will work with them to create volume 4 national extension content.
* CP-ITI-902-02 -  
+
* CP-ITI-909-02 - (Typo -- was incorrectly listed on the agenda as 902-02) Karen W reviewed the proposal to restrict ITI-41 or ITI-42 from carrying On Demand Documents. Karen will finish the editorial work based on the extensive discussion, and will update the explanations and then it is ready for ballot!
 
 
  
 
'''(2) Incoming CP outcomes'''
 
'''(2) Incoming CP outcomes'''
* CP-ITI-BM-Redoc-aggressive-validationCP.doc -  
+
* CP-ITI-BM-Redoc-aggressive-validationCP.doc - Accepted and assigned CP number 923-00 and assigned to Ken Meyer. CP pertains to first round of volume 3 redocumentation.
* CP-ITI-LF-FixTFRefInXCDR.doc -  
+
* CP-ITI-LF-FixTFRefInXCDR.doc - Accepted, and identified as part of this year's redocumentation effort and assigned to Karen Witting to find the correct reference in the new text. Assigned number 924-00
* CP-ITI-NC-UTC-offset-DTM.doc -  
+
* CP-ITI-NC-UTC-offset-DTM.doc - Group discussed concerns that this is a breaking change.
 +
**Rob said that the value is explicitly UTC, so the offset is always zero
 +
**Elliott L suggested that a single offset value is inadequate, because the offset changes as the location crosses a DST boundary.
 +
** Accepted the CP and assigned it to Nader C to work on with support from Rob Horn. CP ID number 925-00
  
 
'''(3) Next in CPs'''
 
'''(3) Next in CPs'''

Revision as of 17:45, 8 April 2016

Introduction

This page contains the details of Change Proposal (CP) processing in the ITI domain for the 2015-2016 publication cycle.

The ITI Change Proposal process follows the general IHE CP process described on the Change Proposal process page. The following sections give more detail on the process for folks involved in the CP process in the ITI domain.

The ITI-specific CP Process

The following text explains what the process used by the ITI technical committee in processing submitted CPs. It is consistent with the general IHE CP process and is informative only.

  1. Write a change proposal. Here is IHE's Change Proposal Template
  2. Submit into the Incoming directory. This is typically done by directly updating the directory if you have access; otherwise send it an email to the ITI Technical Committee members in charge of CPs (currently Lynn Felhofer).
  3. The new CPs are considered by the committee at periodic CP review calls. If CP is accepted it is given a CP #, assigned an editor, renamed to CP-ITI-xxx-00.doc and placed in Assigned. If CP is rejected it is moved to Rejected and submitter is informed of explanation for rejection. Likely reasons for rejection are: duplicate, merged, withdrawn or not enough information to understand the request. Rejected CPs can be resubmitted with more information for reconsideration.
  4. Committee works with editor to draft the CP. Versions are kept in Assigned directory and numbered -00, -01, -02, etc.
  5. Committee decides CP is ready for ballot. Latest version of CP is moved to Completed diretory and old versions are moved to old_versions.
  6. Co-chair collects Completed CPs into a ballot. The Ballot directory will be used for this.
  7. Ballot is released to the general community for voting
  8. Votes and comments are collected. All yes votes means the CP passed ballot and moved to FinalText. No votes are resolved by the committee. Sometimes CP is withdrawn, sometimes NO voter changes to yes vote after explanations. CP may be updated in this process. If updates are insignificant (clarification only) the CP is considered passed. If updates are significant the CP is submitted for another ballot.
  9. CP approved in ballot are put in FinalText and scheduled to be integrated into the Technical Framework or Supplement.

Directory Structure

As CPs are processed through various statuses they move from one directory to another. The directories involved are:

Incoming
contains CPs which have been submitted but have not been assigned a CP number or an editor. This is the place that new incoming CPs are placed prior to the first stage of processing by the committee.
Assigned
contains CPs that have been assigned an editor and are being actively worked on by the committee, i.e. Assigned status
Completed
contains the last version of a CP that is in Completed status. It is waiting to be put in a ballot
FinalText
contains the last version of a CP that is in FinalText status. It is has been approved by ballot and is waiting to be integrated into the TF.
Integrated
contains the version of the CP that was integrated into the TF.
Rejected
CPs that have been submitted by rejected by the committee
Canceled
contains CPs that have been canceled, i.e. Canceled status
Ballots
contains Ballots that have been released for voting by the general community
Status
contains spreadsheets describing the status of CPs.

Change Proposal pages from previous years

Ongoing work on CPs is placed on the current year CP page. Prior years work can be accessed at:

ITI CP Tracking

Location of CPs, and CP status

All Change Proposal management is done on the IHE ftp site here.

Since March 2015, the ITI tracks status of its Change Proposals on the "CPs tracking" tab in this google doc: https://docs.google.com/spreadsheets/d/1gdr_Y8xZBvbb326J4z67cqprxOexFgtkPj_VlD3rB9E/edit?usp=sharing

Approved CPs to be integrated in 2016

CPs that have passed ballot in this cycle, and that will be integrated into Version 12.0 of the Technical Framework and the 2016 version of Supplements in September 2016 are listed on the "Ballot Log" tab of the tracking spreadsheet.

In Aug 2016, CPs will be integrated & checked following this process (currently draft): ITI CP Integration Process

Ballots

Ballot 29

Out for ballot: Aug 13 - Sep 16 2015

Ballot 29 CPs, comments, and votes are archived here: ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance-2016/CPs/Ballots/ballot_29/

CPs approved in this ballot are here: ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance-2016/CPs/3_FinalText/from_Ballot_29/

Comments/votes were reviewed on the Sep 24 & 25 CP calls. Resolution is in the table below.

CP-ITI Title Ballot Result
559-02 MPQ profiles queries vs. Metadata Update option Approved
801-04 Update Vol 1 references to RFC 3881 Approved w/ updates
872-05 Add ATNA Repository Forwarding and re-doc ITI-20 transaction Approved w/ updates


Ballot 30

Out for ballot: Nov 23 - Dec 1, 2015

Ballot 30 CPs, comments, and votes are archived here: ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance-2016/CPs/Ballots/ballot_30/

CPs approved in this ballot will be posted here: ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance-2016/CPs/3_FinalText/from_Ballot_30/

Comments/votes will be reviewed on the CP call on December 4, 2015

CP-ITI- Title Ballot Result
771-04 Clarify hash validation rules in Volume 3 Approved w/ updates
797-07 Definition of Document Approved
814-06 Remove ambiguity about “Registry Enforcement” of display name in coded attributes Failed; back to assigned
857-03 Clarify/update the use of homeCommunityID in XCA Failed; back to assigned
870-02 Repository behavior on ITI-42 failure Approved w/ updates
879-01 mACM - Fix inaccurate Field and Section references plus typos Approved
890-02 mACM – Clarify resources included in ITI-84 and ITI-85 response Approved w/ updates


Ballot 31

Out for ballot: Dec 4, 2015 - Jan 6, 2016

Ballot 31 CPs, comments, and votes are archived here: ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance-2016/CPs/Ballots/ballot_31/

CPs approved in this ballot are posted here: ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance-2016/CPs/3_FinalText/from_Ballot_31/

Comments/votes were reviewed on the CP call on January 8, 2016

CP-ITI- Title Ballot Result
814-08 Remove ambiguity about “Registry Enforcement” of display name in coded attributes Approved w/ updates
858-03 Fix ITI-39 error reporting requirements Approved w/ updates
889-03 Clarify Error Code used for ‘RPLC’ or ‘XFRM_RPLC’ Association Validation Failed; updates made require reballoting
893-00 mACM – clarify actor requirements for create & read Approved
896-00 referenceIdList Clarification Failed; back to assigned
898-01 Update to MetadataLevel Parameter Approved w/ updates
899-00 Typo in XCPD Query transaction Approved
900-00 mACM – fix PCD-06 mapping for alert text Approved
903-01 Add encounterID to referenceIdList Approved w/ updates
904-00 Fix ASTM signature purpose vocabulary Approved


Ballot 32

Out for ballot: Feb 24 - Mar 15, 2016.

The ballot announcement is here.

The ITI Technical Committee will review comments/votes on these dates:

  • Thu March 17, 2016, 9-11am CDT - MHD and Appendix Z comments
  • Fri March 18, 9-11am CDT' - PIXm and PDQm comments
  • Thu March 24, 8-11am CDT - MHD, Appx Z and PIXm comments
  • Wed Apr 6, 8-10am - finish open review items

Ballot 32 CPs are archived here: ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance-2016/CPs/Ballots/ballot_32/

Ballot 32 consolidated comments & votes are here.

CPs approved in this ballot will be stored here: ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance-2016/CPs/3_FinalText/from_Ballot_32/


CP-ITI Title Ballot Result
884-00 PIXm changes for DSTU2
885-00 PDQm changes for DSTU2
886-00 MHD changes for DSTU2
919-00 Split FHIR-specific Appendix Z out of PDQm supplement & update for DSTU2


Ballot 33

Out for ballot: March 21 - April 20, 2016

Ballot 33 CPs are archived here: ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance-2016/CPs/Ballots/ballot_33/

Ballot 33 consolidated comments and votes are here.

CPs approved in this ballot will be stored here:

Comments/votes will be reviewed during the April ITI Tech F2F. Date/time TBD.

CP-ITI Title Ballot Result
582-04 Metadata Update correction for associations in GetAllQuery
799-01 SubmissionSets are immutable
857-04 Clarify/update the use of homeCommunityId in XCA
880-02 Add new value for Study Instance UID in CXi.5 (Identifier Type Codes)
888-03 ProducerReference in ITI-53 and ITI-54 – fix unclear usage
889-07 Clarify Error Code used for ‘RPLC’ or ‘XFRM_RPLC’ Association Validation
895-03 Clarify/update the use of homeCommunityID in XCPD
896-03 referenceIdList Clarification
901-02 On-Demand Document Source options
905-00 ITI-8 PID field Optionality
906-00 ITI-8 MSH message structure - Revert changes introduced in CP-ITI-786
908-00 Table 4.3.1.1-3: on-demand repositoryUniqueId should be required
918-00 Fix workflowInstanceId specification in Vol 3 CXi datatype definition


Assigned CPs

For a list of CPs that are currently assigned see the 'CP tracking' tab in the CP status google doc. Assigned CPs are stored here: ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance-2016/CPs/1_Assigned/

Upcoming CP discussions

ITI CP review calls are typically held the 1st Friday and 3rd Thursday of each month from 9-11am Central US. Additional sessions may be scheduled during ITI Tech F2F meetings. Changes to the 'traditional' schedule for CP calls is announced on the ititech email list.


April-8-2016

Fri, 9-11am CDT

Agenda

The current CP status spreadsheet is here

(1) Assigned CPs for discussion ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance-2016/CPs/1_Assigned/

  • CP-ITI-914-02 - Value of Content-Type HTTP header action parameter (Elliott L)
  • CP-ITI-910-01 - HPD - Updates to ITI-58 – Provider Information Query (Dick D)
  • CP-ITI-902-01 - DSG conformity with ISO 17090-4 (John M)
  • CP-ITI-902-02 - On Demand Doc option (Karen W)

(2) Incoming CP processing ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance-2016/CPs/0_Incoming/

  • CP-ITI-BM-Redoc-aggressive-validationCP.doc
  • CP-ITI-LF-FixTFRefInXCDR.doc
  • CP-ITI-NC-UTC-offset-DTM.doc

(3) Next in CPs

  • Wed Apr 20 - Ballot 33 comments due
  • Thu Apr 21, 9-11 CDT - we will resolve ballot 33 comments during this regular 3rd Thurs CP call

Minutes

Attendees: Ken M, Gila P, Rob H, Tarik I, Manuel M, John M, Elliott L, Karen W.

(1) Assigned CP outcomes

  • CP-ITI-914-02 - Elliott L presented his CP for discussion. Elliott will send it to Bill for review to verify correctness.
  • CP-ITI-910-01 - Could not review as Dick Donkers was unable to attend.
  • CP-ITI-902-01 - John M is proposing to add the words "some regions also required conformance to ISO 17090, which includes additional certificate issuing, content, and validation rules" to section 5.5.2. Gila will email IHE-J to see what they think. If they require more than that, we will work with them to create volume 4 national extension content.
  • CP-ITI-909-02 - (Typo -- was incorrectly listed on the agenda as 902-02) Karen W reviewed the proposal to restrict ITI-41 or ITI-42 from carrying On Demand Documents. Karen will finish the editorial work based on the extensive discussion, and will update the explanations and then it is ready for ballot!

(2) Incoming CP outcomes

  • CP-ITI-BM-Redoc-aggressive-validationCP.doc - Accepted and assigned CP number 923-00 and assigned to Ken Meyer. CP pertains to first round of volume 3 redocumentation.
  • CP-ITI-LF-FixTFRefInXCDR.doc - Accepted, and identified as part of this year's redocumentation effort and assigned to Karen Witting to find the correct reference in the new text. Assigned number 924-00
  • CP-ITI-NC-UTC-offset-DTM.doc - Group discussed concerns that this is a breaking change.
    • Rob said that the value is explicitly UTC, so the offset is always zero
    • Elliott L suggested that a single offset value is inadequate, because the offset changes as the location crosses a DST boundary.
    • Accepted the CP and assigned it to Nader C to work on with support from Rob Horn. CP ID number 925-00

(3) Next in CPs

  • Wed Apr 20 - Ballot 33 comments due
  • Thu Apr 21, 9-11 CDT - we will resolve ballot 33 comments during this regular 3rd Thurs CP call

April-21-2016

Thu, 9-11am CDT

  • Webex link:
  • Meeting number:
  • Password: Meeting1

Agenda

(1) CP Resolve Ballot 33 comments

(2) Next in CPs

  • We will blitz again during the ITI F2F starting April 25

Agenda and Minutes from past CP calls

For 2015-16, they are collected here: ITI CPs 2015-16-Agenda and Minutes from past CP calls