Difference between revisions of "ITI CPs 2020-21-Agenda and Minutes from past CP calls"

From IHE Wiki
Jump to navigation Jump to search
(Created page with "ITI domain CPs for 2020-21 are managed here: ITI Change Proposals 2020-21 This page contains the minutes from past CP review calls during the 2020-21 publication cycle....")
 
Line 9: Line 9:
 
== May 14, 2020 ==
 
== May 14, 2020 ==
  
'''Attendees:'''
+
'''Attendees:''' Martin Smock, Oliver Egger, Luke Duncan, Spencer LaGesse, Lynn Felhofer
 +
 
 +
'''The ITI CP tracking spreadsheet''' is [https://docs.google.com/spreadsheets/d/1gdr_Y8xZBvbb326J4z67cqprxOexFgtkPj_VlD3rB9E/edit#gid=0 here].
 +
 
 +
'''(1) Process Incoming CPs
 +
 
 +
* CP-ITI-PRIM-RelatedPersonClarification - reviewed as assigned to Luke as '''CP-ITI-1207:  PMIR clarification - use of RelatedPerson'''
 +
* CP-ITI-MO-AddFormatCodeAPPC.doc
 +
* CP-ITI-LF-NewLTSoptionsfor2021.doc
 +
* CP-ITI-PDQV3_DiagramedConstraintNotEnumerated...docx - reviewed and assigned to Spencer as '''CP-ITI-1208:  PDQV3 Diagramed Constraint Not Enumerated for PRPA_RM201310UV02'''.  Spencer will consult with Vassil.
 +
 
 +
'''(2) Assigned CPs for discussion'''
 +
* 875-01 - XDS BPPC Enforcement option details moved from Vol 2 to Vol 1 (Lynn)
 +
* more TBD
 +
 
 +
'''(3) Next in CPs'''
 +
* Affect of IHE FTP shutdown on ITI CP processing after June 1, 2020
 +
** Starting approx June-1, management of ITI CPs will move to the IHE Google Drive under:  [https://drive.google.com/drive/folders/1T-dXZIJDgWvwKwQsui0H5bmvkmmo0rX3 IHE Documents > IT_Infrastructure > TF_Maintenance > CPs]
 +
** Note that the IHE Google Drive was first populated, via migration from the FTP site, back in February.  The contents will be re-synchronized prior to the IHE FTP site being taken down.
 +
** As ITI document publication management continues its move toward Github, we will consider moving away from Google Drive for CP management, but not yet.
 +
* CP Integration status
 +
** See the '''Pub2020''' tab on the [https://docs.google.com/spreadsheets/d/1gdr_Y8xZBvbb326J4z67cqprxOexFgtkPj_VlD3rB9E/edit#gid=604491466 ITI CP Tracking Spreadsheet]
 +
* Next regular CP call is the 2nd Thurs in June:  June 11, 10:00 CDT.

Revision as of 11:10, 19 May 2020

ITI domain CPs for 2020-21 are managed here: ITI Change Proposals 2020-21

This page contains the minutes from past CP review calls during the 2020-21 publication cycle.

Current ITI CP status spreadsheet is here

May 14, 2020

Attendees: Martin Smock, Oliver Egger, Luke Duncan, Spencer LaGesse, Lynn Felhofer

The ITI CP tracking spreadsheet is here.

(1) Process Incoming CPs

  • CP-ITI-PRIM-RelatedPersonClarification - reviewed as assigned to Luke as CP-ITI-1207: PMIR clarification - use of RelatedPerson
  • CP-ITI-MO-AddFormatCodeAPPC.doc
  • CP-ITI-LF-NewLTSoptionsfor2021.doc
  • CP-ITI-PDQV3_DiagramedConstraintNotEnumerated...docx - reviewed and assigned to Spencer as CP-ITI-1208: PDQV3 Diagramed Constraint Not Enumerated for PRPA_RM201310UV02. Spencer will consult with Vassil.

(2) Assigned CPs for discussion

  • 875-01 - XDS BPPC Enforcement option details moved from Vol 2 to Vol 1 (Lynn)
  • more TBD

(3) Next in CPs

  • Affect of IHE FTP shutdown on ITI CP processing after June 1, 2020
    • Starting approx June-1, management of ITI CPs will move to the IHE Google Drive under: IHE Documents > IT_Infrastructure > TF_Maintenance > CPs
    • Note that the IHE Google Drive was first populated, via migration from the FTP site, back in February. The contents will be re-synchronized prior to the IHE FTP site being taken down.
    • As ITI document publication management continues its move toward Github, we will consider moving away from Google Drive for CP management, but not yet.
  • CP Integration status
  • Next regular CP call is the 2nd Thurs in June: June 11, 10:00 CDT.