Difference between revisions of "ITI CPs 2019-20-Agenda and Minutes from past CP calls"

From IHE Wiki
Jump to navigation Jump to search
 
(13 intermediate revisions by the same user not shown)
Line 6: Line 6:
  
 
  __TOC__
 
  __TOC__
 +
 +
== Apr 9, 2020 - CP Ballot 56 resolution ==
 +
 +
'''Attendees:''' Dave Pyke, Luke Duncan, Steve Nichols, Martin Smock, Spencer LaGesse, Oliver Egger, Lynn Felhofer
 +
 +
'''The ITI CP tracking spreadsheet''' is [https://docs.google.com/spreadsheets/d/1gdr_Y8xZBvbb326J4z67cqprxOexFgtkPj_VlD3rB9E/edit#gid=0 here].
 +
 +
 +
'''(1) CP Ballot 56 comment resolution
 +
* CPs in the ballot are [ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/Ballots/2020/Ballot_56/ here]
 +
* Ballot comments/votes are [https://docs.google.com/spreadsheets/d/1IcAa2E4cIdEo1hSLwfKHGU3Pis-iqz0_JY1wRalYknQ/edit#gid=0  here]
 +
** All CPs were approved, some with minor updates to address comments  above.
 +
** All Final Text CPs are on the [http://ftp.ihe.net/ IHE FTP site] under IT_Infrastructure/TF_Maintenance/CPs/3_FinaText
 +
 +
'''(2) Next in CPs'''
 +
* Ballot 56 marks the end of the CP cycle for 2020 updates to the ITI TF and Supplements.  CP integration has started, and now will proceed with these ballot 56 CPs.  See the schedule on the '''Pub2020''' tab in the [https://docs.google.com/spreadsheets/d/1gdr_Y8xZBvbb326J4z67cqprxOexFgtkPj_VlD3rB9E/edit#gid=0 ITI CP tracking spreadsheet]
 +
* Next regular CP call is the 2nd Thurs in May -- May 14, 10:00 CDT.
 +
 +
== March 5, 2020 ==
 +
 +
'''Attendees:'''  Ben Levy (Lyniate), Luke Duncan (IntraHealth), John Moehrke (ByLight) Lynn Felhofer
 +
 +
'''The ITI CP tracking spreadsheet''' is [https://docs.google.com/spreadsheets/d/1gdr_Y8xZBvbb326J4z67cqprxOexFgtkPj_VlD3rB9E/edit#gid=0 here].
 +
 +
'''(1) Assigned CPs for discussion'''  IHE FTP SITE:  /IT_Infrastructure/TF_Maintenance/CPs/1_Assigned
 +
* '''CP-ITI-1200 - MHD support for author references not just contained -  New UnContain option''' (John).  This CP was discussed & slightly updated.  Completed and ready for Ballot 56.
 +
* '''CP-ITI-1182 - MHD: Misc fixes to MHD-->XDS mapping tables '''- changes approved.  CP is Completed and ready for Ballot 56.
 +
* '''CP-ITI-1188 - MHD Title and comments are mapped wrong '''- mappings are fixes.  CP is completed and ready for Ballot 56.
 +
* (if time) CP-ITI-1104 - Fix ATNA audit for ITI-43 - not discussed; deferred to a future call
 +
 +
'''(2) Incoming CPs''' IHE FTP SITE:  /IT_Infrastructure/TF_Maintenance/CPs/0_Incoming
 +
* '''CP-ITI-Editorial-FixXDSDocumentEntry....doc''' - this editorial CP was accepted as CP-ITI-1202 and approved for instant Final Text
 +
* '''CP-ITI-PMIR-Mgr-PIX-clarification''' - this CP was discussed and we agreed that further clarification is needed regarding the PMIR Manager not performing cross-referencing, and thus only responding to ITI-83 queries with a pointer to the golden record).  The CP is 1203-00 and is assigned to Luke; needs further discussion and updates.
 +
 +
'''(3) Next in CPs'''
 +
* Ballot 56 will be released on March 6.  For contents, see https://wiki.ihe.net/index.php/ITI_Change_Proposals_2019-20#Ballot_56
 +
* CP call on March is cancelled (this one replaced it)
 +
* Next regular CP call is April 9 10:00 CDT.  During that call we will resolve Ballot 56 comments.
  
 
== February 2020 ITI Tech Face-to-Face ==
 
== February 2020 ITI Tech Face-to-Face ==
  
 
* '''CPs reviewed and approved for future Ballot 56:'''
 
* '''CPs reviewed and approved for future Ballot 56:'''
**
 
 
** CP-ITI-1168 - PDQm: Error with Search Parameters
 
** CP-ITI-1168 - PDQm: Error with Search Parameters
 
** CP-ITI-1169 - PDQm: Error with Code on OperationOutcome
 
** CP-ITI-1169 - PDQm: Error with Code on OperationOutcome
 
** CP-ITI-1184 - PDQm: date not time
 
** CP-ITI-1184 - PDQm: date not time
 +
** CP-ITI-1197 - PMIR – Update to Message Semantics for ITI-93 Mobile Patient Identity Feed
 
** CP-ITI-1198 - PMIR – Clarify Patient Identity Manager return in merge/delete case
 
** CP-ITI-1198 - PMIR – Clarify Patient Identity Manager return in merge/delete case
 
** CP-ITI-1201 - Add auditing requirements to Appendix Z
 
** CP-ITI-1201 - Add auditing requirements to Appendix Z
 +
 +
* ''' Future CPs targeted for Ballot 56'''
 +
** New MHD CP to add the "UnContain" option in support of MHDS.  This is CP-ITI-1200 and details are pending from John Moehrke.
  
 
* '''Timing of Ballot 56'''
 
* '''Timing of Ballot 56'''
** Mar XX - Ballot 56 distributed/announced
+
** Note this is the last ballot for CPs to be integrated into the ITI Tech Framework and TI Supplements in 2020
** Apr XX - Votes/Comments due
+
** Mar 6 - Ballot 56 distributed/announced
 +
** Apr 9 - Votes/Comments due
 
** Apr 9, 10:00 am - Ballot 56 comment resolution call
 
** Apr 9, 10:00 am - Ballot 56 comment resolution call
  
Line 29: Line 71:
 
** CP-ITI-1170 - PDQm: Correct Typo in Table 38.1-1  (editorial)
 
** CP-ITI-1170 - PDQm: Correct Typo in Table 38.1-1  (editorial)
  
* '''These TI Supplements are candidates to move to Final Text'''
+
* '''These TI Supplements are candidates to move to Final Text in 202'''
 
** Timing -- Advocates to finish evaluation in order to be discussed at Planning Decision meeting on April 21.
 
** Timing -- Advocates to finish evaluation in order to be discussed at Planning Decision meeting on April 21.
 
** HPD -- advocates are Oliver, Alexander, and Martin
 
** HPD -- advocates are Oliver, Alexander, and Martin
 
** DEN -- advocate is Massimiliano Masi
 
** DEN -- advocate is Massimiliano Masi
 
** XPID -- needs an advocate
 
** XPID -- needs an advocate
 +
 +
* ''' Final Text CP integration planning'''
 +
** We began planning for CP integration for 2020 by scoping the CPs to integrate, the committee members to integrate CPs and review integration, and initial dates.  To see the plan-in-progress, see the '''Pub2020''' tab on the [https://docs.google.com/spreadsheets/d/1gdr_Y8xZBvbb326J4z67cqprxOexFgtkPj_VlD3rB9E/edit#gid=1302581677 ITI CP Tracking google spreadsheet]
 +
 +
== Feb 13, 2019 ==
 +
 +
'''Attendees:'''  Martin Smock, Oliver Egger (IHE-Suisse), Spencer LaGesse (Epic), Joe Lamy (SSA/Aegis), Ben Levy (Lyniate (previously Corepoint), Luke Duncan (IntraHealth), Lynn Felhofer
 +
 +
'''The ITI CP tracking spreadsheet''' is [https://docs.google.com/spreadsheets/d/1gdr_Y8xZBvbb326J4z67cqprxOexFgtkPj_VlD3rB9E/edit#gid=0 here].
 +
 +
'''(1) CP Ballot 55 comment resolution
 +
* A '''summary''' of Ballot 55 results is here:  https://wiki.ihe.net/index.php/ITI_Change_Proposals_2019-20#Ballot_55
 +
* '''Details ''' including votes, comments, and resolution are [https://docs.google.com/spreadsheets/d/1GZrETRFgVEN_HTCk1prNNOkWxouDjEzxOISItj1-bcs/edit#gid=0 here].
 +
* CPs approved in this ballot are now Final Text and will be incorporated into ITI Final Text volumes and TI Supplements in early May/June 2020.  They are stored on the IHE FTP site under /IT_Infrastructure/TF_Maintenance/CPs/3_FinalText.  The IHE FTP site is currently accessible via Filezilla.
 +
 +
'''(2) Next in ITI CPs'''
 +
* Ballot 56 is under construction and will be released in early March.  Contents and timing details are here:  https://wiki.ihe.net/index.php/ITI_Change_Proposals_2019-20#Ballot_56_.28future.29
 +
** This is the last ballot for the 2019-2020 publication  cycle
 +
* Next ITI CP call is the 2nd Thus of March -- 12-Mar, 10-11am CDT
  
 
== Jan 9, 2020 ==
 
== Jan 9, 2020 ==

Latest revision as of 10:52, 15 April 2020

ITI domain CPs for 2019-20 are managed here: ITI Change Proposals 2019-20

This page contains the minutes from past CP review calls during the 2019-20 publication cycle.

Current ITI CP status spreadsheet is here

Apr 9, 2020 - CP Ballot 56 resolution

Attendees: Dave Pyke, Luke Duncan, Steve Nichols, Martin Smock, Spencer LaGesse, Oliver Egger, Lynn Felhofer

The ITI CP tracking spreadsheet is here.


(1) CP Ballot 56 comment resolution

  • CPs in the ballot are here
  • Ballot comments/votes are here
    • All CPs were approved, some with minor updates to address comments above.
    • All Final Text CPs are on the IHE FTP site under IT_Infrastructure/TF_Maintenance/CPs/3_FinaText

(2) Next in CPs

  • Ballot 56 marks the end of the CP cycle for 2020 updates to the ITI TF and Supplements. CP integration has started, and now will proceed with these ballot 56 CPs. See the schedule on the Pub2020 tab in the ITI CP tracking spreadsheet
  • Next regular CP call is the 2nd Thurs in May -- May 14, 10:00 CDT.

March 5, 2020

Attendees: Ben Levy (Lyniate), Luke Duncan (IntraHealth), John Moehrke (ByLight) Lynn Felhofer

The ITI CP tracking spreadsheet is here.

(1) Assigned CPs for discussion IHE FTP SITE: /IT_Infrastructure/TF_Maintenance/CPs/1_Assigned

  • CP-ITI-1200 - MHD support for author references not just contained - New UnContain option (John). This CP was discussed & slightly updated. Completed and ready for Ballot 56.
  • CP-ITI-1182 - MHD: Misc fixes to MHD-->XDS mapping tables - changes approved. CP is Completed and ready for Ballot 56.
  • CP-ITI-1188 - MHD Title and comments are mapped wrong - mappings are fixes. CP is completed and ready for Ballot 56.
  • (if time) CP-ITI-1104 - Fix ATNA audit for ITI-43 - not discussed; deferred to a future call

(2) Incoming CPs IHE FTP SITE: /IT_Infrastructure/TF_Maintenance/CPs/0_Incoming

  • CP-ITI-Editorial-FixXDSDocumentEntry....doc - this editorial CP was accepted as CP-ITI-1202 and approved for instant Final Text
  • CP-ITI-PMIR-Mgr-PIX-clarification - this CP was discussed and we agreed that further clarification is needed regarding the PMIR Manager not performing cross-referencing, and thus only responding to ITI-83 queries with a pointer to the golden record). The CP is 1203-00 and is assigned to Luke; needs further discussion and updates.

(3) Next in CPs

February 2020 ITI Tech Face-to-Face

  • CPs reviewed and approved for future Ballot 56:
    • CP-ITI-1168 - PDQm: Error with Search Parameters
    • CP-ITI-1169 - PDQm: Error with Code on OperationOutcome
    • CP-ITI-1184 - PDQm: date not time
    • CP-ITI-1197 - PMIR – Update to Message Semantics for ITI-93 Mobile Patient Identity Feed
    • CP-ITI-1198 - PMIR – Clarify Patient Identity Manager return in merge/delete case
    • CP-ITI-1201 - Add auditing requirements to Appendix Z
  • Future CPs targeted for Ballot 56
    • New MHD CP to add the "UnContain" option in support of MHDS. This is CP-ITI-1200 and details are pending from John Moehrke.
  • Timing of Ballot 56
    • Note this is the last ballot for CPs to be integrated into the ITI Tech Framework and TI Supplements in 2020
    • Mar 6 - Ballot 56 distributed/announced
    • Apr 9 - Votes/Comments due
    • Apr 9, 10:00 am - Ballot 56 comment resolution call
  • CPs reviewed and cancelled with rationale:
    • CP-ITI-1193 - New ATNA STX options & updates to old dependencies / mandatory groupings
    • CP-ITI-1171 - Restriction of HTTP Verbs for Query
  • CPs moved to Final Text
    • CP-ITI-1170 - PDQm: Correct Typo in Table 38.1-1 (editorial)
  • These TI Supplements are candidates to move to Final Text in 202
    • Timing -- Advocates to finish evaluation in order to be discussed at Planning Decision meeting on April 21.
    • HPD -- advocates are Oliver, Alexander, and Martin
    • DEN -- advocate is Massimiliano Masi
    • XPID -- needs an advocate
  • Final Text CP integration planning
    • We began planning for CP integration for 2020 by scoping the CPs to integrate, the committee members to integrate CPs and review integration, and initial dates. To see the plan-in-progress, see the Pub2020 tab on the ITI CP Tracking google spreadsheet

Feb 13, 2019

Attendees: Martin Smock, Oliver Egger (IHE-Suisse), Spencer LaGesse (Epic), Joe Lamy (SSA/Aegis), Ben Levy (Lyniate (previously Corepoint), Luke Duncan (IntraHealth), Lynn Felhofer

The ITI CP tracking spreadsheet is here.

(1) CP Ballot 55 comment resolution

  • A summary of Ballot 55 results is here: https://wiki.ihe.net/index.php/ITI_Change_Proposals_2019-20#Ballot_55
  • Details including votes, comments, and resolution are here.
  • CPs approved in this ballot are now Final Text and will be incorporated into ITI Final Text volumes and TI Supplements in early May/June 2020. They are stored on the IHE FTP site under /IT_Infrastructure/TF_Maintenance/CPs/3_FinalText. The IHE FTP site is currently accessible via Filezilla.

(2) Next in ITI CPs

Jan 9, 2020

Attendees: Steve Nichols (GE), Spencer LaGesse (Epic), Matt Blackmon (Sequoia), Oliver Egger (adhis), Joe Lamy (Aegis/SSA), David Pyke (Ready Computing), Ben Levy (Corepoint), Lynn Felhofer

The ITI CP tracking spreadsheet is here.


(1) Assigned CPs for Review ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/1_Assigned/

  • CP-ITI-1189-02 - The requestID has to be mandatory within the HPD Query if it is mandatory for the HPD response (Oliver) - changes proposed by Oliver and Tarik were reviewed and slightly updated. Version -03 of this CP is approved as Completed and ready for future ballot 56.

(2) Incoming CPs ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/

  • CP-ITI-RMU-DupSectionNo.doc - this editorial CP fixes duplicate section numbers in the RMU supplement. It is CP-ITI-1196 and approved for instant Final Text.

(3) Next in CPs

Dec 12, 2019

Attendees: Oliver Egger (ahdis), David Pyke (Ready Computing), Mick Talley (Univ Bank), John Moehrke (ByLight), Joe Lamy (SSA/Aegis), Martin Smock, Lynn Felhofer

The ITI CP tracking spreadsheet is here.

(1) Assigned CPs for Review ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/1_Assigned/

  • CP-ITI-1190-01 - RMU update of document entries in status Deprecated (Oliver and Martin) -
    • Reviewed and approved as Completed and ready for Ballot 55.
  • CP-ITI-1189-01 - The requestID has to be mandatory within the HPD Query if it is mandatory for the HPD response (Oliver) -
    • Not reviewed today. Oliver agreed to update the CP to propose changes based on Tarik's input (that input is now included in the Rationale of the CP).
  • CP-ITI-1136-03 - Inconsistent audit of homeCommunityId (Lynn) -
    • We reviewed this CP at the Aug 8 CP call. We determined that the proposed change introduced consistency, but was a 'breaking change'. Subsequently, the CP submitter (James Bourette) agreed.
    • We agreed to cancel this CP rather than sprinkle notes in the text identifying that the text is inconsistent in a way that is acknowledged by ITI Tech.
  • CP-ITI-1193-00 - New ATNA STX options & updates to old dependencies / mandatory groupings
    • To quantify issue, see this google doc
    • We agreed that a top priority is to clarify requirements for the XCA, XCPD, and XDS profiles. General consensus was to add guidance thatXDS/XCA/XCPD actor should support STX TLS 1.2 BCP 195 and ATX TLS Syslog. To support legacy environments, the actors may support STX TLS 1.0 w/ AES. Plus a add reference to the new options sections.
    • Lynn will draft sentences based on this guidance, and find a home for it, and we can refine it during the next CP call.

(2) Incoming CPs ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/

  • CP-ITI-audit-message-for-ITI-86.doc - reviewed and agreed that it is Completed and ready for ballot 55. CP-ITI-1194.
  • CP-ITI-mCSDclarifications.doc - reviewed and agreed that it is Completed and ready for ballot 55. CP-ITI-1195.

(3) Next CP Ballot

(4) Next in CPs

  • Next CP call is on Thu, Jan 9, 2020, 10-11am CST

Oct 24, 2019

Attendees: David Pyke (Ready Computing), Martin Smock (IHE-Switzerland), Matt Blackmon (Sequoia), Ben Levy (Corepoint Health), Joe Lamy (Aegis), Oliver Egger (ahdis), Spencer LaGesse (Epic), John Moehrke (ByLight), Lynn Felhofer

The ITI CP tracking spreadsheet is here.

(1) Incoming CPs ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/

  • CP-ITI-OE-HPD-requestID (Oliver Egger) - accepted as CP-ITI-1189. Tarik is the current HPD expert on ITI Tech. Lynn will send this CP to Tarik for his opinion -- add requestId to the query, or remove the requirement that it be present in the response.
  • CP-ITI-OE-RMU-deprecated (Oliver Egger) - accepted as CP-ITI-1190 and assigned to Oliver. He will work on proposed changes to the text for review at a future CP call.
  • CP-ITI-XCA-FixContradictoryHCIDRequirement (Spencer LaGesse) - accepted as CP-ITI-1191. Completed and ready for future ballot 55 after Lynn adds surrounding text for context during CP ballot review.
  • CP-ITI-LF-FixLinkInITI-19 (Lynn) - accepted as CP-ITI-1192; Instant Final Text due to editorial-only fix.
  • CP-ITI-old_ATNA-grouping-clarity (Lynn) - accepted as CP-ITI-1193. Lynn volunteered to take the next step and propose a method for determining which profile needs updating and how the TF will be affected.

Aug - Sep, 2019 - no calls - Summer CP hiatus

Aug 8, 2019

Attendees: Joe Lamy (SSA/Aegis), John Moehrke (ByLight), Oliver Egger (ahdis), Spencer LaGesse (Epic), Victor Costa, Lynn Felhofer

The ITI CP tracking spreadsheet is here.

(0) Finish Ballot 54 resolution -- PDQm CP 1174

(1) Incoming CPs ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/

  • ITI-CP-AppxW-AddGithubPointer.doc - accepted as CP 1185. Completed and ready for future Ballot 55.
  • ITI-CP-JM-AppZSecurityConsiderations.doc - accepted as CP 1186. Completed and ready for future Ballot 55.
  • ITI-CP-JM-RefStandardsConsistency.doc - accepted as CP 1187. Assigned to John M. This CP will remain Assigned and 'in the queue', to be applied to FHIR-based supplements when they are updated for FHIR R5.

(2) Assigned CPs for Review ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/1_Assigned/

  • CP-ITI-1136 - Inconsistent audit of homeCommunityId (Lynn) - the proposed change was reviewed. John asked whether fixing this to make the audit consistent across transactions would be a breaking change. After the meeting, Lynn followed up with James Bourette (CP submitter) and he acknowledged that it would. Lynn updated the CP accordingly. We will add review of the latest update to the agenda for the next CP call.

(3) Next in CPs

  • Aug 15 and 22 calls are cancelled -- summer CP hiatus
  • Next CP call is Thursday, Aug 29.
  • Timing of CP Ballot 55? -- None of the currently "completed" CPs "must have", so we will defer releasing Ballot 55 until we have more compelling content.

Aug 1 2019 - Ballot 54 Resolution

Attendees: Matt Blackmon (Sequoia), Dave Pyke (ReadyComputing), John Moehrke (ByLight), Spencer LaGesse (Epic), Walco van Loon (WalkIT), Ben Levy (CorePoint), Lynn Felhofer

The ITI CP tracking spreadsheet is here.

(1) CP Ballot 54 Resolution - 3 ATNA-related CPs

  • We resolved comments on the 3 ATNA CPs (897, 1047, 1151). Based on ballot comments, we updated the Rationale section of 1047, and made clarifying updates to text in 1151. (Thanks to Elliott for his review & comments). All three of these CPs are now Final Text. Find a pointer to the newly approved CPs on the "Log of Approved ITI CPs" here.
  • Note: comments on the PDQm CP-ITI-1174 "PDQm – clarify search parameter behaviour" will be resolved on the Aug-8 call when Oliver will be available to participate.

(2) Next in CPs

  • Regular Thurs ITI CP calls resume next week - Aug 8

July 18 and 25 2019 - No CP call

July 11 2019

Attendees: Dave Pyke (Ready Computing), Spencer LaGesse (Epic), Joe Lamy (Aegis/SSA), Lynn Felhofer

The ITI CP tracking spreadsheet is here.

(1) Incoming CPs ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/

  • CP-ITI-LAD-mCSD-LocationConstrainTableFixes.doc (Luke) - reviewed and accepted as CP-ITI-1183. Completed and ready for future ballot 55.
  • CP-ITI-PDQm-birth-time.doc (John) - reviewed and assigned to John M as CP-ITI-1184. Attendees thought that the CP should be discussed before balloting it -- at a future call when we have broader attendance. Perhaps the issue of PDQm having only date (vs date-time in PDQ & PDQv3) -- and the affect (if any) on pediatric demographics or other use cases -- should at least be documented in a Closed or Open issues. CP rationale is updated accordingly.

(2) Next in CPs

  • July 17 -- Ballot 54 votes/comments are due. See details here.
  • July 18 -- No CP call
  • July 25 -- No CP call due to the ITI Tech face-to-face meeting that week.
  • Aug 1 -- Ballot 52 resolution call.
  • Aug 8 -- regular Thur CP review call.

July 4 -- No CP call

June 27, 2019

Attendees: James Bourette (Intersystems), Spencer LaGesse (Epic), Joe Lamy (SSA/Aegis), Gregorio Canal (Arsenàl.IT), Ben Levy (Corepoint Health), Matt Blackmon (Sequoia), Tarik Idris (InterComponentWare), Luke Duncan, (IntraHealth), Lynn Felhofer

The ITI CP tracking spreadsheet is here.

(1) Assigned CPs for Review ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/1_Assigned/

  • CP-ITI-1178-01 - XDS: misalignment between example and description for localizedString (Gregorio) - The latest update to this CP was approved. This CP is Completed and ready for future ballot 55.

(2) Incoming CPs ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/

  • CP-ITI-TI-hcIdentifier_capitalization_HPD.DOC (Tarik) - this HPD CP is assigned to Tarik as CP-ITI-1181. There are a few more capitalization fixes needed in the HPD tables in ITI-58, so Tarik will bring this back with additional updates.
  • CP-ITI-LF-MHD-mappingTableFixes (Lynn) - this MHD CP is assigned to John M as CP-ITI-1182.

(3) Next in CPs

  • The July 4 ITI CP call is cancelled due to U.S. holiday. ITI CP calls resume on July 11.
  • Ballot 54 is released. Votes/comments are due July 17. See details here.
  • ITI Tech's editors and reviewers have finished their work on CP integration, and the updated documents are being processed by Mary. We expect them to be published on ihe.net by mid-July.

June 20, 2019

Attendees: Oliver Egger (ahdis), James Bourette (Intersystems), Spencer LaGesse (Epic), Joe Lamy (SSA/Aegis), Gregorio Canal (Arsenal.IT), Walco van Loon (WalkIT), John Moehrke (ByLight), Ben Levy (Corepoint Health), Lynn Felhofer

The ITI CP tracking spreadsheet is here.

(1) Incoming CPs ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/

  • XDS: CP-ITI-GC-misalignment_between_example_and_description_for_localizedString.doc (Gregorio) - this CP was broadly discussed. Notes from that discussion were added to the rationale of the CP. This is now CP 1178, assigned to Gregorio. Rather than updating the examples alone, the committee identified other areas of Vol 3 to clarify with regard to use of localizedString, especially with regard to Registries not validating the content.
  • MHD: CP-ITI-GC-Clarify_use_of_outcome_in_ITI-65.doc (Gregorio) - this CP was discussed and modified. CP 1179 is Completed and ready for future ballot 55.
  • XDM: CP-ITI-XDM-email (John) - accepted as CP 1180. Completed and ready for a future ballot. This CP contains a reference to the new S/MIME option in ATNA, so balloting this CP depends on CP 1151 (with the new options) in Ballot 54 being declared Final Text.

(2) Next in CPs

  • Ballot 54 is released. Votes/comments are due July 17. See details here.
  • 3 ITI TI Supps are out for public comment. Comments due Mon Jul 24.
  • Next CP call is June 27; no CP call on July 4.

June 13, 2019

Attendees: Steve Nichols (GE), Joe Lamy (SSA/Aegis), Ben Levy, (Corepoint Health), John Moehrke (ByLight), Spencer LaGesse (Epic), Matt Blackmon (Sequoia), Lynn Felhofer

The ITI CP tracking spreadsheet is here.

(1) Assigned CPs for Review ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/1_Assigned/

  • CP-ITI-1151-01 - ATNA Authenticate-Node clarity – Update options in Vol 1 (John) - this CP was discussed and slightly update during the call version -02 is approved as Completed and ready for Ballot 54.
    • Refer to Final Text CP-ITI-1145 (Add three options affecting [ITI-19] Authenticate Node) to see current options for ATNA actors

(2) Incoming CPs ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/

  • CP-ITI-DEN-mismatch-SecurityConsiderations.doc -- accepted as (editorial) CP 1175, assigned to Lynn
  • CP-ITI-KB-fixBrokenLinksInAppxO.doc -- accepted as (editorial) CP 1176; assigned to Matt Blackmon who will determine if anything can be done with reasonable effort (thanks, Matt)
    • also supplemental info in CP-ITI-KB-BrokenLinksVol2x.txt
  • CP-ITI-KB-fixOWaspLinkAppxV.doc -- accepted as (editorial) CP 1177; it is Completed but will be held for future Ballot 55 so that it could potentially be balloted with 1176 above

(3) Next in CPs

June 6, 2019

Attendees: Joe Lamy (Aegis/SSA), John Moehrke (By Light), Matt Blackmon (Sequoia), Spencer LaGesse (Epic), Oliver Egger (ahdis), Massimiliano Masi (Tiani-Spirit), Walco van Loon (WalkIT - guest), Paul Lomayesva (Intersystems), Lynn Felhofer

The ITI CP tracking spreadsheet is here.

(1) Incoming CPs ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/

  • CP-ITI-PDQM-clarifyFamilySearch.doc (Oliver) - accepted as CP 1174. Approved as Completed and ready for future Ballot 54.
  • The following CPs were deferred to a future call:
    • CP-ITI-DEN-mismatch-SecurityConsiderations.doc
    • CP-ITI-KB-fixBrokenLinksInAppxO.doc
      • also supplemental info in CP-ITI-KB-BrokenLinksVol2x.txt
    • CP-ITI-KB-fixOWaspLinkAppxV.doc

(2) Assigned CPs for Review ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/1_Assigned/

  • CP-ITI-907 - IUA Maintenance and alignment with FHIR initiatives (Walco) - after some discussion, the group agreed that the best path forward is for Walco and Massi to draft a work item proposal for needed updates to IUA. Next steps:
    • John will send the work item proposal template to Walco.
    • Walco and Massi will prepare a work item proposal to present to the ITI Planning Cmte at their next scheduled call on 18-June. John advised that the work item proposal include information about the need for the update, as well as the planned scope of the update, so that the Planning Cmte can prioritize the work.
    • Lynn will send Walco the Word version of the current-published IUA and look for any other open IUA CPs
    • The soonest that the ITI Tech Committee can consider this work item (assuming it is approved) is at their F2F meeting at the end of July.
    • In the interim, Walco and Massi can work on the proposed updates to the Supplement.
    • With the continuous development model, it is possible that IUA could be updated (re-published) by the end of 2019, but the preliminary steps above need to be completed before timing could be confirmed
    • When/if the workitem is approved, this CP will be cancelled
  • CP-ITI-897 - Clarify that rqmts in ITI-19 provide a baseline set, and are not mandated at all deployments (John) - discussed and approved as Completed and ready for future Ballot 54
  • CP-ITI-1047 - Remove mandatory User Authentication from ITI-19 (John) - discussed and approved as Completed and ready for future Ballot 54
  • CP-ITI-1151 - ATNA Authenticate-Node clarity - Update options in Vol 1 (John) - John has proposed a revamping of ATNA actors' options that relate to TLS (ITI-19).
    • This CP is ready for committee review. We will devote the June 13 call to reviewing this CP, with the goal of approving it for ballot. Lynn will send out this CP to the ititech mailing list, along with CP 1145, the Final Text CP that added the FQDN server cert validation and BCP195 options.

(3) Next in CPs

  • If you plan to attend CP calls in the coming months, please indicate your availability using this google doc so we can make efficient use of our CP review time.
  • CP integration is currently on-going. Look for the Pub2019 tab on the CP tracking spreadsheet to see editor assignments and schedule for CP integration & republishing updated ITI TF docs.