Difference between revisions of "IHE Testing and Tools Committee Teleconference Minutes 2011-05-23"
Jump to navigation
Jump to search
Chrisdcarr (talk | contribs) |
Chrisdcarr (talk | contribs) |
||
(10 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
==Attendees== | ==Attendees== | ||
+ | * Karima Bourquard | ||
* Chris Carr | * Chris Carr | ||
* Bruce Curran | * Bruce Curran | ||
+ | * Chris Lindop | ||
* Cor Loef | * Cor Loef | ||
+ | * Flora Lum | ||
+ | * Steve Moore | ||
+ | * Eric Poiseau | ||
* Rob Snelick | * Rob Snelick | ||
* Lisa Spellman | * Lisa Spellman | ||
Line 11: | Line 16: | ||
* June 7-8 Meeting Planning | * June 7-8 Meeting Planning | ||
:* NIST HQ Logistics | :* NIST HQ Logistics | ||
+ | ::* Wyndham Gardens in Gaithersburg is preferred hotel | ||
+ | ::* Meeting will take place in division conference room, Building 222 A314 | ||
+ | ::* Bill will send instructions to group | ||
::* Dial-in needed? | ::* Dial-in needed? | ||
+ | :::* Yes. Chris Carr will set up Webex and distribute dial-in info | ||
:* Meeting agenda: | :* Meeting agenda: | ||
− | ::* [https://spreadsheets.google.com/ccc?key=0Aof7yn6v1b9gdG9lUUk1Zm4wX1FSbjlXZTZvb3F2X1E&hl=en&authkey=CMyqjrUO Tool Inventory and development status] | + | ::* Start time 9am on June 7 |
− | :::* Gazelle: Eric P/IHE-E | + | ::* Documents for review and discussion: |
− | :::* Test descriptions and test scripts: Steve Moore/IHE-NA | + | :::* [https://spreadsheets.google.com/ccc?key=0Aof7yn6v1b9gdG9lUUk1Zm4wX1FSbjlXZTZvb3F2X1E&hl=en&authkey=CMyqjrUO Tool Inventory and development status] |
− | :::* Validation Tools: NIST | + | :::* Near-term development plans for each of the development teams: Eric, Steve and NIST teams will be prepared to give brief overviews |
+ | ::::* Development status of existing tools, capabilities, gaps that need to be addressed; links needed between tools | ||
+ | :::* List of known testing events (Connectathons, etc.) - Chris Carr will develop draft list of known events, dates, scope, etc. | ||
+ | |||
+ | ::* Discussion Topics | ||
+ | :::* June 7 | ||
+ | ::::* Two hour high-level overview of current development activities | ||
+ | :::::* Gazelle: Eric P/IHE-E | ||
+ | :::::* Test descriptions and test scripts: Steve Moore/IHE-NA | ||
+ | :::::* Validation Tools: NIST teams (Rob, Bill, John, Andrew) | ||
+ | |||
+ | ::* Development Planning | ||
:::* Domain-by-domain, profile-by-profile tooling inventory | :::* Domain-by-domain, profile-by-profile tooling inventory | ||
− | ::::* | + | ::::* Refine inventory and status of existing tool |
− | ::::* | + | ::::* Identify gaps |
− | |||
:::* Support of new domains and profiles | :::* Support of new domains and profiles | ||
:::* New test management capabilities | :::* New test management capabilities | ||
Line 28: | Line 47: | ||
:::* US "meaningful use" testing and certification support | :::* US "meaningful use" testing and certification support | ||
:::* Other projects and testing opportunities | :::* Other projects and testing opportunities | ||
+ | :::::* Review needs for test tools at Connectathons; other uses of tools | ||
+ | :::::* Identify gaps in existing tool set | ||
+ | :::::* Test case authoring and management tools | ||
+ | :::::* Implementation Guide authoring tools; potential use for managing profile authoring process | ||
+ | :::::* Quality management for testing process | ||
+ | :::::* Identify shared priorities for development and integration of tools into Gazelle | ||
+ | ::::* Detailed architecture discussion: current tools and processes | ||
+ | ::::* Development tracking and reporting process | ||
+ | |||
+ | |||
+ | ::* Deliverables | ||
+ | :::* Diagram of existing tools showing their interactions | ||
+ | :::* Development reporting process and documentation tools | ||
+ | :::* Next steps; ongoing discussion; future meetings | ||
+ | |||
::* Connectathon Manager Training and Credentialing | ::* Connectathon Manager Training and Credentialing | ||
+ | |||
+ | :* Next Tcon | ||
+ | ::* June 20 | ||
[[Testing and Tools Committee]] | [[Testing and Tools Committee]] | ||
[[Category: Minutes]] | [[Category: Minutes]] |
Latest revision as of 11:20, 23 May 2011
Attendees
- Karima Bourquard
- Chris Carr
- Bruce Curran
- Chris Lindop
- Cor Loef
- Flora Lum
- Steve Moore
- Eric Poiseau
- Rob Snelick
- Lisa Spellman
Minutes
- June 7-8 Meeting Planning
- NIST HQ Logistics
- Wyndham Gardens in Gaithersburg is preferred hotel
- Meeting will take place in division conference room, Building 222 A314
- Bill will send instructions to group
- Dial-in needed?
- Yes. Chris Carr will set up Webex and distribute dial-in info
- Meeting agenda:
- Start time 9am on June 7
- Documents for review and discussion:
- Tool Inventory and development status
- Near-term development plans for each of the development teams: Eric, Steve and NIST teams will be prepared to give brief overviews
- Development status of existing tools, capabilities, gaps that need to be addressed; links needed between tools
- List of known testing events (Connectathons, etc.) - Chris Carr will develop draft list of known events, dates, scope, etc.
- Discussion Topics
- June 7
- Two hour high-level overview of current development activities
- Gazelle: Eric P/IHE-E
- Test descriptions and test scripts: Steve Moore/IHE-NA
- Validation Tools: NIST teams (Rob, Bill, John, Andrew)
- Development Planning
- Domain-by-domain, profile-by-profile tooling inventory
- Refine inventory and status of existing tool
- Identify gaps
- Support of new domains and profiles
- New test management capabilities
- Integration of test management, test definitions, validation tools
- Support of non-Connectathon testing
- European project support
- US "meaningful use" testing and certification support
- Other projects and testing opportunities
- Review needs for test tools at Connectathons; other uses of tools
- Identify gaps in existing tool set
- Test case authoring and management tools
- Implementation Guide authoring tools; potential use for managing profile authoring process
- Quality management for testing process
- Identify shared priorities for development and integration of tools into Gazelle
- Detailed architecture discussion: current tools and processes
- Development tracking and reporting process
- Deliverables
- Diagram of existing tools showing their interactions
- Development reporting process and documentation tools
- Next steps; ongoing discussion; future meetings
- Connectathon Manager Training and Credentialing
- Next Tcon
- June 20