Difference between revisions of "IHE Testing and Tools Committee Teleconference Minutes 2011-05-23"

From IHE Wiki
Jump to navigation Jump to search
Line 25: Line 25:
 
::* Documents for review and discussion:
 
::* Documents for review and discussion:
 
:::* [https://spreadsheets.google.com/ccc?key=0Aof7yn6v1b9gdG9lUUk1Zm4wX1FSbjlXZTZvb3F2X1E&hl=en&authkey=CMyqjrUO Tool Inventory and development status]
 
:::* [https://spreadsheets.google.com/ccc?key=0Aof7yn6v1b9gdG9lUUk1Zm4wX1FSbjlXZTZvb3F2X1E&hl=en&authkey=CMyqjrUO Tool Inventory and development status]
:::* Near-term development plans for each of the development teams
+
:::* Near-term development plans for each of the development teams: Eric, Steve and NIST teams will be prepared to give brief overviews
 
::::* Development status of existing tools, capabilities, gaps that need to be addressed; links needed between tools
 
::::* Development status of existing tools, capabilities, gaps that need to be addressed; links needed between tools
:::* List of known testing events (Connectathons, etc.)
+
:::* List of known testing events (Connectathons, etc.) - Chris Carr will develop draft list of known events, dates, scope, etc.
  
 
::* Discussion Topics
 
::* Discussion Topics

Revision as of 10:43, 23 May 2011

Attendees

  • Karima Bourquard
  • Chris Carr
  • Bruce Curran
  • Chris Lindop
  • Cor Loef
  • Flora Lum
  • Steve Moore
  • Eric Poiseau
  • Rob Snelick
  • Lisa Spellman

Minutes

  • June 7-8 Meeting Planning
  • NIST HQ Logistics
  • Wyndham Gardens in Gaithersburg is preferred hotel
  • Meeting will take place in division conference room, Building 222 A314
  • Bill will send instructions to group
  • Dial-in needed?
  • Yes. Chris Carr will set up Webex and distribute dial-in info
  • Meeting agenda:
  • Start time 9am on June 7
  • Documents for review and discussion:
  • Development status of existing tools, capabilities, gaps that need to be addressed; links needed between tools
  • List of known testing events (Connectathons, etc.) - Chris Carr will develop draft list of known events, dates, scope, etc.
  • Discussion Topics
  • Gazelle: Eric P/IHE-E
  • Test descriptions and test scripts: Steve Moore/IHE-NA
  • Validation Tools: NIST
  • Domain-by-domain, profile-by-profile tooling inventory
  • Identify status and gaps
  • Adapt tooling to updated infrastructure
  • Development Planning
  • Support of new domains and profiles
  • New test management capabilities
  • Integration of test management, test definitions, validation tools
  • Support of non-Connectathon testing
  • European project support
  • US "meaningful use" testing and certification support
  • Other projects and testing opportunities
  • Deliverables
  • Diagram of existing tools showing their interactions
  • Connectathon Manager Training and Credentialing

Testing and Tools Committee