Difference between revisions of "IHE Testing and Tools Committee Teleconference Minutes 2011-05-23"
Jump to navigation
Jump to search
Chrisdcarr (talk | contribs) |
Chrisdcarr (talk | contribs) |
||
Line 25: | Line 25: | ||
::* Documents for review and discussion: | ::* Documents for review and discussion: | ||
:::* [https://spreadsheets.google.com/ccc?key=0Aof7yn6v1b9gdG9lUUk1Zm4wX1FSbjlXZTZvb3F2X1E&hl=en&authkey=CMyqjrUO Tool Inventory and development status] | :::* [https://spreadsheets.google.com/ccc?key=0Aof7yn6v1b9gdG9lUUk1Zm4wX1FSbjlXZTZvb3F2X1E&hl=en&authkey=CMyqjrUO Tool Inventory and development status] | ||
+ | :::* Near-term development plans for each of the development teams | ||
+ | ::::* Development status of existing tools, capabilities, gaps that need to be addressed; links needed between tools | ||
:::* List of known testing events (Connectathons, etc.) | :::* List of known testing events (Connectathons, etc.) | ||
− | + | ||
::* Discussion Topics | ::* Discussion Topics | ||
:::* Gazelle: Eric P/IHE-E | :::* Gazelle: Eric P/IHE-E | ||
Line 42: | Line 44: | ||
:::* US "meaningful use" testing and certification support | :::* US "meaningful use" testing and certification support | ||
:::* Other projects and testing opportunities | :::* Other projects and testing opportunities | ||
+ | ::* Deliverables | ||
+ | :::* Diagram of existing tools showing their interactions | ||
::* Connectathon Manager Training and Credentialing | ::* Connectathon Manager Training and Credentialing | ||
Revision as of 10:28, 23 May 2011
Attendees
- Karima Bourquard
- Chris Carr
- Bruce Curran
- Chris Lindop
- Cor Loef
- Flora Lum
- Steve Moore
- Eric Poiseau
- Rob Snelick
- Lisa Spellman
Minutes
- June 7-8 Meeting Planning
- NIST HQ Logistics
- Wyndham Gardens in Gaithersburg is preferred hotel
- Meeting will take place in division conference room, Building 222 A314
- Bill will send instructions to group
- Dial-in needed?
- Yes. Chris Carr will set up Webex and distribute dial-in info
- Meeting agenda:
- Start time 9am on June 7
- Documents for review and discussion:
- Tool Inventory and development status
- Near-term development plans for each of the development teams
- Development status of existing tools, capabilities, gaps that need to be addressed; links needed between tools
- List of known testing events (Connectathons, etc.)
- Discussion Topics
- Gazelle: Eric P/IHE-E
- Test descriptions and test scripts: Steve Moore/IHE-NA
- Validation Tools: NIST
- Domain-by-domain, profile-by-profile tooling inventory
- Identify status and gaps
- Adapt tooling to updated infrastructure
- Development Planning
- Support of new domains and profiles
- New test management capabilities
- Integration of test management, test definitions, validation tools
- Support of non-Connectathon testing
- European project support
- US "meaningful use" testing and certification support
- Other projects and testing opportunities
- Deliverables
- Diagram of existing tools showing their interactions
- Connectathon Manager Training and Credentialing