1. Connectathon Results Proposal - Charles Parisot/Geert Claeys
- Reviewed Geert Claeys' draft proposal for results reporting
- Current draft would report failed results also
- Consensus of committee is that we should not report failed testing results
- Current draft would distinguish prototype results from product results
- Consensus of the committee is that IHE is not able to verify this information for publication
- Original intent was to distinguish Trial Implementation from Final Text
- Make that designation simply: Trial Implementation or Final Text; no way to convey Trial Implementation Profiles that are moved to Final Text without changes
- Current draft would report failed results also
- Action Item: Geert will redraft simplified version of the proposal
- Action Item: Committee will provide feedback to Eric's group on design of product registry and linkage to Connectathon results matrix
2. Connectathon Quality Assurance Guidelines - Cor Loef
- Cor Loef's draft address processes as they are currently carried out
- Next draft should incorporate language about:
- Bureaucratic rules around Connectathon (eg, must be national deployment committee)
- Use of IHE tools
- Training/qualification requirements for Connectathon project managers
- Recognition of results reporting in main database
- Action Item: Chris Carr will develop new draft incorporating these elements prior to next committee tcon
3. Committee Charter - Chris Carr
- Action Item: Chris Carr will contact David Monteau offline to schedule a review of final document
4. Licensing Terms - Chris Carr/Steve Moore
- Action Item:
5. Product Registry - Eric Poiseau
6. Cypress Project - Chris Carr/Steve Moore
7. Use of Kudu by Malaysian Connectathon
- Incorporate formal rules for recognition of Connectathon
- Set training dates for use of Kudu
8. Next Meeting:
- Jan. 19 is a holiday in US; move next call to Monday, Jan. 26 and resume normal schedule on Monday, Feb. 2