==Minutes== | ==Minutes== | ||
− | 1. Connectathon Results Proposal - Charles Parisot/Geert Claeys | + | '''1. [ftp://ftp.ihe.net/Testing_and_Tools/ihe_testing_tools_xathon_results_reporting_2008-11-18%20-gc-CP-1.doc Connectathon Results Proposal]''' - Charles Parisot/Geert Claeys |
+ | * Reviewed Geert Claeys' draft proposal for results reporting | ||
+ | ** Current draft would report failed results also | ||
+ | *** Consensus of committee is that we should not report failed testing results | ||
+ | ** Current draft would distinguish prototype results from product results | ||
+ | *** Consensus of the committee is that IHE is not able to verify this information for publication | ||
+ | ** Original intent was to distinguish Trial Implementation from Final Text | ||
+ | *** Make that designation simply: Trial Implementation or Final Text; no way to convey Trial Implementation Profiles that are moved to Final Text without changes | ||
+ | * '''Action Item:''' Geert will redraft simplified version of the proposal by next committee teleconference | ||
+ | * '''Action Item:''' Committee will provide feedback to Eric's group on design of product registry and linkage to Connectathon results matrix | ||
− | 2. Connectathon Quality | + | '''2. [ftp://ftp.ihe.net/Testing_and_Tools/Quality_Assurance_IHE_Connectathon_v1.doc Connectathon Quality Assurance Guidelines]''' - Cor Loef |
+ | * Cor Loef's draft address processes as they are currently carried out | ||
+ | * Next draft should incorporate language about: | ||
+ | ** Bureaucratic rules around Connectathon (eg, must be national deployment committee) | ||
+ | ** Use of IHE tools | ||
+ | ** Training/qualification requirements for Connectathon project managers | ||
+ | ** Recognition of results reporting in main database | ||
+ | * '''Action Item:''' Chris Carr will develop new draft incorporating these elements prior to next committee tcon | ||
− | 3. Committee Charter - Chris Carr | + | '''3. [ftp://ftp.ihe.net/Testing_and_Tools/Testing%20and%20Tools%20Committee%20Charter_2008-10-05.doc Committee Charter]''' - Chris Carr |
+ | * '''Action Item:''' Chris Carr will contact David Monteau offline to schedule a review of final document | ||
− | 4. Licensing Terms - Chris Carr/Steve Moore | + | '''4. Licensing Terms''' - Chris Carr/Steve Moore |
+ | * Washington University contracting office has objected to changes from the Apache license made in developing IHE license and contributor agreements. | ||
+ | * '''Action Item:''' Chris Carr will arrange teleconference with Erin Brosnahan at Washington University to discuss changes from the Apache contributors agreeement | ||
− | 5. Product Registry - Eric Poiseau | + | '''5. Product Registry''' - Eric Poiseau |
+ | * Eric to provide update on next teleconference | ||
− | 6. Cypress Project - Chris Carr/Steve Moore | + | '''6. Cypress Project''' - Chris Carr/Steve Moore |
+ | * Resume schedule of teleconferences beginning with Jan. 20 teleconference | ||
+ | * Steve Moore will confer with Rob Snelick (of NIST) about agenda for that teleconference. | ||
+ | * Chris Carr to send out message to group about resuming calls | ||
+ | |||
+ | '''7. Use of Kudu by Malaysian Connectathon''' | ||
+ | * Didi Davis and Chris Carr to send organizers of Malaysian Connectathon a response detailing the formal requirements for recognition of a Connectathon and suggest they consider their event demo preparation and proof of concept | ||
+ | * Didi Davis and Chris Carr will inform organizers that no support is available for use of tool | ||
+ | * Chris Lindop will steer organizers and participants away from using Kudu for demo preparation event | ||
+ | * Chris Carr will work with Eric Poiseau and Steve Moore to set 2009 training dates for use of Kudu | ||
+ | |||
+ | '''8. Next Meeting:''' | ||
+ | * Jan. 19 is a holiday in US; move '''next call to Monday, Jan. 26''' and resume normal schedule on Monday, Feb. 2 | ||
− | |||
[[Testing and Tools Committee]] | [[Testing and Tools Committee]] | ||
[[Category: Minutes]] | [[Category: Minutes]] |
Latest revision as of 13:13, 5 January 2009
Attendees
- Geert Claeys - Agfa
- Didi Davis - HIMSS
- Chris Lindop - GE
- Cor Loef - Philips
- Bill Majurski - NIST
- Steve Moore - MIR
- Eric Poiseau - INRIA
- Nichole Drye-Mayo - RSNA
- Chris Carr - RSNA
Minutes
1. Connectathon Results Proposal - Charles Parisot/Geert Claeys
- Reviewed Geert Claeys' draft proposal for results reporting
- Current draft would report failed results also
- Consensus of committee is that we should not report failed testing results
- Current draft would distinguish prototype results from product results
- Consensus of the committee is that IHE is not able to verify this information for publication
- Original intent was to distinguish Trial Implementation from Final Text
- Make that designation simply: Trial Implementation or Final Text; no way to convey Trial Implementation Profiles that are moved to Final Text without changes
- Current draft would report failed results also
- Action Item: Geert will redraft simplified version of the proposal by next committee teleconference
- Action Item: Committee will provide feedback to Eric's group on design of product registry and linkage to Connectathon results matrix
2. Connectathon Quality Assurance Guidelines - Cor Loef
- Cor Loef's draft address processes as they are currently carried out
- Next draft should incorporate language about:
- Bureaucratic rules around Connectathon (eg, must be national deployment committee)
- Use of IHE tools
- Training/qualification requirements for Connectathon project managers
- Recognition of results reporting in main database
- Action Item: Chris Carr will develop new draft incorporating these elements prior to next committee tcon
3. Committee Charter - Chris Carr
- Action Item: Chris Carr will contact David Monteau offline to schedule a review of final document
4. Licensing Terms - Chris Carr/Steve Moore
- Washington University contracting office has objected to changes from the Apache license made in developing IHE license and contributor agreements.
- Action Item: Chris Carr will arrange teleconference with Erin Brosnahan at Washington University to discuss changes from the Apache contributors agreeement
5. Product Registry - Eric Poiseau
- Eric to provide update on next teleconference
6. Cypress Project - Chris Carr/Steve Moore
- Resume schedule of teleconferences beginning with Jan. 20 teleconference
- Steve Moore will confer with Rob Snelick (of NIST) about agenda for that teleconference.
- Chris Carr to send out message to group about resuming calls
7. Use of Kudu by Malaysian Connectathon
- Didi Davis and Chris Carr to send organizers of Malaysian Connectathon a response detailing the formal requirements for recognition of a Connectathon and suggest they consider their event demo preparation and proof of concept
- Didi Davis and Chris Carr will inform organizers that no support is available for use of tool
- Chris Lindop will steer organizers and participants away from using Kudu for demo preparation event
- Chris Carr will work with Eric Poiseau and Steve Moore to set 2009 training dates for use of Kudu
8. Next Meeting:
- Jan. 19 is a holiday in US; move next call to Monday, Jan. 26 and resume normal schedule on Monday, Feb. 2