Difference between revisions of "IHE Testing and Tools Committee Teleconference Minutes 2009-01-05"
Jump to navigation
Jump to search
Chrisdcarr (talk | contribs) |
Chrisdcarr (talk | contribs) |
||
Line 30: | Line 30: | ||
** Training/qualification requirements for Connectathon project managers | ** Training/qualification requirements for Connectathon project managers | ||
** Recognition of results reporting in main database | ** Recognition of results reporting in main database | ||
− | * Action Item: Chris Carr will develop new draft incorporating these elements prior to next committee tcon | + | * '''Action Item:''' Chris Carr will develop new draft incorporating these elements prior to next committee tcon |
3. [ftp://ftp.ihe.net/Testing_and_Tools/Testing%20and%20Tools%20Committee%20Charter_2008-10-05.doc Committee Charter - Chris Carr] | 3. [ftp://ftp.ihe.net/Testing_and_Tools/Testing%20and%20Tools%20Committee%20Charter_2008-10-05.doc Committee Charter - Chris Carr] | ||
Line 54: | Line 54: | ||
8. Next Meeting: | 8. Next Meeting: | ||
− | * Jan. 19 is a holiday in US; move next call to Monday, Jan. 26 and resume normal schedule on Monday, Feb. 2 | + | * Jan. 19 is a holiday in US; move '''next call to Monday, Jan. 26''' and resume normal schedule on Monday, Feb. 2 |
Revision as of 13:11, 5 January 2009
Attendees
- Geert Claeys - Agfa
- Didi Davis - HIMSS
- Chris Lindop - GE
- Cor Loef - Philips
- Bill Majurski - NIST
- Steve Moore - MIR
- Eric Poiseau - INRIA
- Nichole Drye-Mayo - RSNA
- Chris Carr - RSNA
Minutes
1. Connectathon Results Proposal - Charles Parisot/Geert Claeys
- Reviewed Geert Claeys' draft proposal for results reporting
- Current draft would report failed results also
- Consensus of committee is that we should not report failed testing results
- Current draft would distinguish prototype results from product results
- Consensus of the committee is that IHE is not able to verify this information for publication
- Original intent was to distinguish Trial Implementation from Final Text
- Make that designation simply: Trial Implementation or Final Text; no way to convey Trial Implementation Profiles that are moved to Final Text without changes
- Current draft would report failed results also
- Action Item: Geert will redraft simplified version of the proposal
- Action Item: Committee will provide feedback to Eric's group on design of product registry and linkage to Connectathon results matrix
2. Connectathon Quality Assurance Guidelines - Cor Loef
- Cor Loef's draft address processes as they are currently carried out
- Next draft should incorporate language about:
- Bureaucratic rules around Connectathon (eg, must be national deployment committee)
- Use of IHE tools
- Training/qualification requirements for Connectathon project managers
- Recognition of results reporting in main database
- Action Item: Chris Carr will develop new draft incorporating these elements prior to next committee tcon
3. Committee Charter - Chris Carr
- Action Item: Chris Carr will contact David Monteau offline to schedule a review of final document
4. Licensing Terms - Chris Carr/Steve Moore
- Washington University contracting office has objected to changes from the Apache license made in developing IHE license and contributor agreements.
- Action Item: Chris Carr will arrange teleconference with Erin Brosnahan at Washington University to discuss changes from the Apache contributors agreeement
5. Product Registry - Eric Poiseau
- Eric to provide update on next teleconference
6. Cypress Project - Chris Carr/Steve Moore
- Resume schedule of teleconferences beginning with Jan. 20 teleconference
- Steve Moore will confer with Rob Snelick (of NIST) about agenda for that teleconference.
- Chris Carr to send out message to group about resuming calls
7. Use of Kudu by Malaysian Connectathon
- Didi Davis and Chris Carr to send organizers of Malaysian Connectathon a response detailing the formal requirements for recognition of a Connectathon and suggest they consider their event demo preparation and proof of concept
- Didi Davis and Chris Carr will inform organizers that no support is available for use of tool
- Chris Lindop will steer organizers and participants away from using Kudu for demo preparation event
- Chris Carr will work with Eric Poiseau and Steve Moore to set 2009 training dates for use of Kudu
8. Next Meeting:
- Jan. 19 is a holiday in US; move next call to Monday, Jan. 26 and resume normal schedule on Monday, Feb. 2