Difference between revisions of "IHE Testing and Tools Committee Teleconference Minutes 2009-01-05"

From IHE Wiki
Jump to navigation Jump to search
Line 12: Line 12:
 
==Minutes==
 
==Minutes==
  
1. Connectathon Results Proposal - Charles Parisot/Geert Claeys
+
1. [ftp://ftp.ihe.net/Testing_and_Tools/ihe_testing_tools_xathon_results_reporting_2008-11-18%20-gc-CP-1.doc Connectathon Results Proposal] - Charles Parisot/Geert Claeys
 +
* Reviewed Geert Claeys' draft proposal for results reporting
 +
** Current draft would report failed results also
 +
*** Consensus of committee is that we should not report failed testing results
 +
** Current draft would distinguish prototype results from product results
 +
*** Consensus of the committee is that IHE is not able to verify this information for publication
 +
** Original intent was to distinguish Trial Implementation from Final Text
 +
*** Make that designation simply: Trial Implementation or Final Text; no way to convey Trial Implementation Profiles that are moved to Final Text without changes
 +
* '''Action Item:''' Geert will redraft simplified version of the proposal
 +
* '''Action Item:''' Committee will provide feedback to Eric's group on design of product registry and linkage to Connectathon results matrix
  
2. Connectathon Quality Control Rules - Cor Loef
+
2. [ftp://ftp.ihe.net/Testing_and_Tools/Quality_Assurance_IHE_Connectathon_v1.doc Connectathon Quality Assurance Guidelines] - Cor Loef
 +
* Cor Loef's draft address processes as they are currently carried out
 +
* Next draft should incorporate language about:
 +
** Bureaucratic rules around Connectathon (eg, must be national deployment committee)
 +
** Use of IHE tools
 +
** Training/qualification requirements for Connectathon project managers
 +
** Recognition of results reporting in main database
 +
* Action Item: Chris Carr will develop new draft incorporating these elements prior to next committee tcon
  
 
3. Committee Charter - Chris Carr
 
3. Committee Charter - Chris Carr
 +
* '''Action Item:''' Chris Carr will contact David Monteau offline to schedule a review of final document
  
 
4. Licensing Terms - Chris Carr/Steve Moore
 
4. Licensing Terms - Chris Carr/Steve Moore
 +
* '''Action Item:'''
  
 
5. Product Registry - Eric Poiseau
 
5. Product Registry - Eric Poiseau
Line 25: Line 43:
  
 
7. Use of Kudu by Malaysian Connectathon
 
7. Use of Kudu by Malaysian Connectathon
 +
* Incorporate formal rules for recognition of Connectathon
 +
* Set training dates for use of Kudu
 +
 +
8. Next Meeting:
 +
* Jan. 19 is a holiday in US; move next call to Monday, Jan. 26 and resume normal schedule on Monday, Feb. 2
 +
*
  
 
[[Testing and Tools Committee]]
 
[[Testing and Tools Committee]]
  
 
[[Category: Minutes]]
 
[[Category: Minutes]]

Revision as of 12:47, 5 January 2009

Attendees

  • Geert Claeys - Agfa
  • Didi Davis - HIMSS
  • Chris Lindop - GE
  • Cor Loef - Philips
  • Bill Majurski - NIST
  • Steve Moore - MIR
  • Eric Poiseau - INRIA
  • Nichole Drye-Mayo - RSNA
  • Chris Carr - RSNA

Minutes

1. Connectathon Results Proposal - Charles Parisot/Geert Claeys

  • Reviewed Geert Claeys' draft proposal for results reporting
    • Current draft would report failed results also
      • Consensus of committee is that we should not report failed testing results
    • Current draft would distinguish prototype results from product results
      • Consensus of the committee is that IHE is not able to verify this information for publication
    • Original intent was to distinguish Trial Implementation from Final Text
      • Make that designation simply: Trial Implementation or Final Text; no way to convey Trial Implementation Profiles that are moved to Final Text without changes
  • Action Item: Geert will redraft simplified version of the proposal
  • Action Item: Committee will provide feedback to Eric's group on design of product registry and linkage to Connectathon results matrix

2. Connectathon Quality Assurance Guidelines - Cor Loef

  • Cor Loef's draft address processes as they are currently carried out
  • Next draft should incorporate language about:
    • Bureaucratic rules around Connectathon (eg, must be national deployment committee)
    • Use of IHE tools
    • Training/qualification requirements for Connectathon project managers
    • Recognition of results reporting in main database
  • Action Item: Chris Carr will develop new draft incorporating these elements prior to next committee tcon

3. Committee Charter - Chris Carr

  • Action Item: Chris Carr will contact David Monteau offline to schedule a review of final document

4. Licensing Terms - Chris Carr/Steve Moore

  • Action Item:

5. Product Registry - Eric Poiseau

6. Cypress Project - Chris Carr/Steve Moore

7. Use of Kudu by Malaysian Connectathon

  • Incorporate formal rules for recognition of Connectathon
  • Set training dates for use of Kudu

8. Next Meeting:

  • Jan. 19 is a holiday in US; move next call to Monday, Jan. 26 and resume normal schedule on Monday, Feb. 2

Testing and Tools Committee