IHE Testing and Tools Committee Teleconference Minutes 2008-06-30
Attendees
- Eric Poiseau, INRIA
- Steve Moore, Mallinckrodt
- Cor Loef, Philips
- Karima Bourquard, GMSIH
- Didi Davis, HIMSS
- Joan McMillen, RSNA
- Chris Carr, RSNA
Minutes
- Contributor Agreement Update
- Process for Outside Contributions to Gazelle Project
- Committee Charter
- Referred to draft document under development by Chris Carr
- Desire to keep application process as clear and simple as possible
- Chris Carr will develop refined draft, along with simple instructions for becoming sponsor, contributor, committee member, etc.
- Gazelle Roadmap Update
- Referred to the [Roadmap document developed by Eric and Steve]
- Registration and management of Connectathon for 2009 North American Connectathon will be performed through Gazelle
- Tests themselves will be run through a mixture of Gazelle, external validation services and Kudu
- Pre-Connectathon testing for February 2009 will still be done using MESA tools
- Working on GUI to access external validation services (including NIST CDA validation tools);
- Working to coordinate NIST schematron rules with user interface development by Laika
- Project Management Group conducts weekly update meetings to coordinate work on Gazelle
- Pilot of Test Engine Implementation: current plan is to include PIX, Rad SWF and Lab SWF; concern about implementing two sets of HL7 registration and patient ID messages in Rad vs. Lab SWF
- Project Management Group will support both profiles; when PAM version of Rad SWFII is created, they will also create a test plan
- Outcomes of NIST Meeting
- Next Steps
- Chris Carr will provide updated charter documents