Difference between revisions of "IHE Testing and Tools Committee Teleconference Minutes 2008-06-30"
Jump to navigation
Jump to search
Chrisdcarr (talk | contribs) (New page: ==Attendees== * Eric * Steve * Cor * Karima * Didi * Joan * Chris Carr ==Minutes== # Contributor Agreement Update # Process for Outside Contributions to Gazelle Project # Committee Charte...) |
Chrisdcarr (talk | contribs) |
||
(6 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
==Attendees== | ==Attendees== | ||
− | * Eric | + | * Eric Poiseau, INRIA |
− | * Steve | + | * Steve Moore, Mallinckrodt |
− | * Cor | + | * Cor Loef, Philips |
− | * Karima | + | * Karima Bourquard, GMSIH |
− | * Didi | + | * Didi Davis, HIMSS |
− | * Joan | + | * Joan McMillen, RSNA |
− | * Chris Carr | + | * Chris Carr, RSNA |
==Minutes== | ==Minutes== | ||
# Contributor Agreement Update | # Contributor Agreement Update | ||
+ | ## Completed, awaiting Board approval | ||
# Process for Outside Contributions to Gazelle Project | # Process for Outside Contributions to Gazelle Project | ||
+ | ## Eric and Steve drafting; will provide draft for next tcon | ||
# Committee Charter | # Committee Charter | ||
+ | ## Referred to draft document under development by Chris Carr | ||
+ | ## Desire to keep application process as clear and simple as possible | ||
+ | ## Chris Carr will develop refined draft, along with simple instructions for becoming sponsor, contributor, committee member, etc. | ||
# Gazelle Roadmap Update | # Gazelle Roadmap Update | ||
− | ## Referred to the | + | ## Referred to the [[http://spreadsheets.google.com/ccc?key=pWfKxFAQxm-xgKw5sEPkWDw&inv=ihe-testing-and-tools-committee@googlegroups.com&t=9030418778120829483&guest Roadmap document developed by Eric and Steve]] |
## Registration and management of Connectathon for 2009 North American Connectathon will be performed through Gazelle | ## Registration and management of Connectathon for 2009 North American Connectathon will be performed through Gazelle | ||
− | ## | + | ## Tests themselves will be run through a mixture of Gazelle, external validation services and Kudu |
+ | ## Pre-Connectathon testing for February 2009 will still be done using MESA tools | ||
+ | ## Working on GUI to access external validation services (including NIST CDA validation tools); | ||
+ | ## Working to coordinate NIST schematron rules with user interface development by Laika | ||
+ | ## Project Management Group conducts weekly update meetings to coordinate work on Gazelle | ||
+ | ## Pilot of Test Engine Implementation: current plan is to include PIX, Rad SWF and Lab SWF; concern about implementing two sets of HL7 registration and patient ID messages in Rad vs. Lab SWF | ||
+ | ### Project Management Group will support both profiles; when PAM version of Rad SWFII is created, they will also create a test plan | ||
# Outcomes of NIST Meeting | # Outcomes of NIST Meeting | ||
+ | ## Attendees included representatives from NIST and from IHE-Japan (Ozeki, Takebayashi, Aoshima, Yoshimura) | ||
+ | ## Reviewed existing architecture | ||
+ | ## IHE-J group currently focusing on developing for Kudu platform; trying to support October testing event (switched from February) | ||
+ | ## IHE-J 2008 Connectathon: 109 systems from 44 companies; Awaiting full results to include in database | ||
# Next Steps | # Next Steps | ||
+ | ## Reschedule '''next call to Friday, July 18''' (to avoid conflict with French national holiday) | ||
+ | ## Chris Carr will provide updated charter documents | ||
+ | ## Eric and Steve will provide draft of contribution process | ||
+ | |||
+ | [[Testing and Tools Committee]] | ||
+ | |||
+ | [[Category: Minutes]] |
Latest revision as of 10:07, 30 June 2008
Attendees
- Eric Poiseau, INRIA
- Steve Moore, Mallinckrodt
- Cor Loef, Philips
- Karima Bourquard, GMSIH
- Didi Davis, HIMSS
- Joan McMillen, RSNA
- Chris Carr, RSNA
Minutes
- Contributor Agreement Update
- Completed, awaiting Board approval
- Process for Outside Contributions to Gazelle Project
- Eric and Steve drafting; will provide draft for next tcon
- Committee Charter
- Referred to draft document under development by Chris Carr
- Desire to keep application process as clear and simple as possible
- Chris Carr will develop refined draft, along with simple instructions for becoming sponsor, contributor, committee member, etc.
- Gazelle Roadmap Update
- Referred to the [Roadmap document developed by Eric and Steve]
- Registration and management of Connectathon for 2009 North American Connectathon will be performed through Gazelle
- Tests themselves will be run through a mixture of Gazelle, external validation services and Kudu
- Pre-Connectathon testing for February 2009 will still be done using MESA tools
- Working on GUI to access external validation services (including NIST CDA validation tools);
- Working to coordinate NIST schematron rules with user interface development by Laika
- Project Management Group conducts weekly update meetings to coordinate work on Gazelle
- Pilot of Test Engine Implementation: current plan is to include PIX, Rad SWF and Lab SWF; concern about implementing two sets of HL7 registration and patient ID messages in Rad vs. Lab SWF
- Project Management Group will support both profiles; when PAM version of Rad SWFII is created, they will also create a test plan
- Outcomes of NIST Meeting
- Attendees included representatives from NIST and from IHE-Japan (Ozeki, Takebayashi, Aoshima, Yoshimura)
- Reviewed existing architecture
- IHE-J group currently focusing on developing for Kudu platform; trying to support October testing event (switched from February)
- IHE-J 2008 Connectathon: 109 systems from 44 companies; Awaiting full results to include in database
- Next Steps
- Reschedule next call to Friday, July 18 (to avoid conflict with French national holiday)
- Chris Carr will provide updated charter documents
- Eric and Steve will provide draft of contribution process