Difference between revisions of "IHE Testing and Tools Committee Teleconference Minutes 2007-11-13"
Jump to navigation
Jump to search
Chrisdcarr (talk | contribs) |
Chrisdcarr (talk | contribs) |
||
Line 13: | Line 13: | ||
===2. Gazelle development status=== | ===2. Gazelle development status=== | ||
+ | a. Steve Moore reported that the Gazelle development group is moving forward with a combination of volunteer contributors and Technical Management Group members. The architecture and platform for the tools have been chosen and work has begun on the core control layer for Gazelle. | ||
===3. Product Registry=== | ===3. Product Registry=== |
Revision as of 17:17, 6 December 2007
Attendees
- Chris Carr, RSNA
- Geert Claeys, Agfa
- Joan McMillen, RSNA
- Steve Moore, MIR
- Mike Nusbaum, IHE-Canada
Minutes
1. TnT Committee Governance and Leadership
a. Discussion deferred to next call; with additional detail on this item to include:
- How to define committee membership: Should members submit form declaring their intent to contribute to project? Should their contributions and status of membership be evaluated periodically by the Testing Management Group?
2. Gazelle development status
a. Steve Moore reported that the Gazelle development group is moving forward with a combination of volunteer contributors and Technical Management Group members. The architecture and platform for the tools have been chosen and work has begun on the core control layer for Gazelle.