Difference between revisions of "IHE Testing and Tools Committee 2010-07-19 Teleconference Minutes"
Jump to navigation
Jump to search
Chrisdcarr (talk | contribs) |
Chrisdcarr (talk | contribs) |
||
(5 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
==Attendees== | ==Attendees== | ||
− | * | + | * Chris Carr |
− | * | + | * Todd Cooper |
− | * | + | * Didi Davis |
− | * | + | * Chris Lindop |
− | * | + | * Cor Loef |
− | * | + | * Flora Lum |
− | * | + | * Bill Majurski |
− | * Joan | + | * Joan McMillen |
− | * | + | * Steve Moore |
− | * | + | * Charles Parisot |
==Minutes== | ==Minutes== | ||
Line 15: | Line 15: | ||
1) September Connectathon Manager Training Event Update | 1) September Connectathon Manager Training Event Update | ||
+ | * No registrants yet | ||
+ | * '''Action Item:''' Chris Carr to send specific invitation to national groups and others managing Connectathons | ||
2) Gazelle Status | 2) Gazelle Status | ||
* [https://spreadsheets.google.com/ccc?key=0Aof7yn6v1b9gdG9lUUk1Zm4wX1FSbjlXZTZvb3F2X1E&hl=en&pli=1#gid=0 Simulator Development Priority List] | * [https://spreadsheets.google.com/ccc?key=0Aof7yn6v1b9gdG9lUUk1Zm4wX1FSbjlXZTZvb3F2X1E&hl=en&pli=1#gid=0 Simulator Development Priority List] | ||
+ | :* Charles Parisot provided input on development priorities of epSOS project testing | ||
+ | ::* epSOS testing will require some modifications of NIST XD* toolkit. These changes may be relatively minor updates. | ||
+ | ::* Is it necessary to integrate (all or parts of) toolkit in advance of Sept. epSOS testing? This could be a substantially larger piece of work. | ||
+ | ::* epSOS will test system-to-system connectivity across 10 national systems: exchange of medical summaries and prescriptions for tourist patient using variant of XCA (combining query and retrieve; fully coded CDAs or XDS-SD (CDA header + pdf) | ||
+ | :::* Profiles used: XCPD, ATNA, XUA, XDR, PCC templates combined into a variant of XPHR (adding prescription info - will be fed back into PCC) | ||
+ | :::* IHE E will oversee training, testing and "projectathon"; INRIA team has added two developers to manage project | ||
+ | :::* Eric has started developing schematrons for validating documents to epSOS spec; How do these relate to the tools developed by NIST? Level and nature of support requested from NIST needs to be clarified | ||
+ | :::* Goal is to have a tool available in August based on NIST tool (ie, not integrated with Gazelle); toolkit based on Tiani implementation | ||
+ | :::* Needs support for XCPD testing, which is not currently developed | ||
+ | :::* Aug-Oct countries do pre-Projectathon testing; event to be held in Bratislava in November | ||
+ | :::* Tools need to be integrated into Gazelle for countries to use in October | ||
+ | ::* Bill Majurski is re-architecting the XD* validation toolkit to separate simulator components to give better feedback; first piece is more detailed message validation; needs guidance on which of the new components are required for epSOS and where it can use existing components | ||
+ | ::* Will epSOS Projectathon require simulators? Probably so, to plug performance gaps in participating systems | ||
+ | * '''Action Item:''' Charles will confer with Karima Bourquard regarding any requests to be made to Bill Majurski before he leaves for vacation Wednesday (7/28) | ||
+ | * '''Action Item:''' For August 16, bring together technical contributors to testing tools to discuss coordination of development work; need to have Gazelle API documented in order to develop scope of work and timelines; invite representatives from NIST: Rob Snelick, Andrew McCaffery, Mary Laminan | ||
+ | * '''Action Item:''' Tcon next Monday, July 26 to plan for Aug. 16 tcon: Bill, Eric and Karima in addition to rest of Testing and Tools Committee | ||
− | 3) | + | 3) [http://docs.google.com/Doc?docid=0AfSvbmWRIsFQZGNrbmJkejdfMWRzN2M5NWhk&hl=en Connectathon Guidelines] Update |
+ | * Chris Carr added section about referencing product names in Connectathon results | ||
+ | :* '''Action Item:''' Chris Carr to complete revising proposal on publishing results and linking to product integration statements in guidelines document | ||
− | |||
− | |||
[[Testing and Tools Committee]] | [[Testing and Tools Committee]] | ||
[[Category: Minutes]] | [[Category: Minutes]] |
Latest revision as of 15:56, 20 July 2010
Attendees
- Chris Carr
- Todd Cooper
- Didi Davis
- Chris Lindop
- Cor Loef
- Flora Lum
- Bill Majurski
- Joan McMillen
- Steve Moore
- Charles Parisot
Minutes
1) September Connectathon Manager Training Event Update
- No registrants yet
- Action Item: Chris Carr to send specific invitation to national groups and others managing Connectathons
2) Gazelle Status
- Charles Parisot provided input on development priorities of epSOS project testing
- epSOS testing will require some modifications of NIST XD* toolkit. These changes may be relatively minor updates.
- Is it necessary to integrate (all or parts of) toolkit in advance of Sept. epSOS testing? This could be a substantially larger piece of work.
- epSOS will test system-to-system connectivity across 10 national systems: exchange of medical summaries and prescriptions for tourist patient using variant of XCA (combining query and retrieve; fully coded CDAs or XDS-SD (CDA header + pdf)
- Profiles used: XCPD, ATNA, XUA, XDR, PCC templates combined into a variant of XPHR (adding prescription info - will be fed back into PCC)
- IHE E will oversee training, testing and "projectathon"; INRIA team has added two developers to manage project
- Eric has started developing schematrons for validating documents to epSOS spec; How do these relate to the tools developed by NIST? Level and nature of support requested from NIST needs to be clarified
- Goal is to have a tool available in August based on NIST tool (ie, not integrated with Gazelle); toolkit based on Tiani implementation
- Needs support for XCPD testing, which is not currently developed
- Aug-Oct countries do pre-Projectathon testing; event to be held in Bratislava in November
- Tools need to be integrated into Gazelle for countries to use in October
- Bill Majurski is re-architecting the XD* validation toolkit to separate simulator components to give better feedback; first piece is more detailed message validation; needs guidance on which of the new components are required for epSOS and where it can use existing components
- Will epSOS Projectathon require simulators? Probably so, to plug performance gaps in participating systems
- Action Item: Charles will confer with Karima Bourquard regarding any requests to be made to Bill Majurski before he leaves for vacation Wednesday (7/28)
- Action Item: For August 16, bring together technical contributors to testing tools to discuss coordination of development work; need to have Gazelle API documented in order to develop scope of work and timelines; invite representatives from NIST: Rob Snelick, Andrew McCaffery, Mary Laminan
- Action Item: Tcon next Monday, July 26 to plan for Aug. 16 tcon: Bill, Eric and Karima in addition to rest of Testing and Tools Committee
3) Connectathon Guidelines Update
- Chris Carr added section about referencing product names in Connectathon results
- Action Item: Chris Carr to complete revising proposal on publishing results and linking to product integration statements in guidelines document