IHE Testing and Tools Committee 2010-06-21 Teleconference Minutes
Jump to navigation
Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
Attendees
- Karima Bourquard
- Bruce Curran
- Didi Davis
- Flora Lum
- Steve Moore
- Bill Majurski
- Charles Parisot
- Eric Poiseau
- Lisa Spellman
- Chris Carr
Minutes
Calendar Updates
- RO Connectathon taking place at ASTRO HQ the week of Sept. 20-24
- Connectathon Manager Training: Sept. 14-20 at RSNA HQ in Oak Brook
- Bill Majurski, Steve Moore, Eric Poiseau are faculty members
- Include material to address the needs of HIEs based on XDS profiles?
- Need to develop list of HIEs
- Include state HIE coordinators: Lisa Joe Jenkins a point of contact for this group (being coordinated by Deloitte)
- Criteria and RFPs for Authorized Temporary Certification Bodies (ATCB) have just been published by ONC; submissions due in July
- Action Item: Chris Carr to send announcement to ihenews list assuming main target prospective Connectathon managers
Gazelle Development
- Reviewed the Inventory and priority list for Simulators
- XD* profiles are listed as a priority level 4; NIST tools currently work independently at Connectathons
- epSOS needs slight modifications to these tools
- Changing the interface of these tools to work with Gazelle is a larger body of work
- Bill Majurski will communicate with Eric Poiseau about potential to link tools to Gazelle interface
- Interface for Gazelle needs to be documented so that other developers (NIST, MIR) can contribute simulators
- PIX/PDQ work has proceeded on three tracks: NIST and INRIA have both developed tools to replace the original MIR scripts
- Need to identify the relative priority of proxies versus simulators
- Proxies are an important Connectathon tool: eg, HL7 v2 or Web Services proxies
- Action Item: Karima Bourquard will develop list of proxies to be developed
- Action Item: Steve Moore to add status column and designations
- Action Item: Eric Poiseau, Steve Moore and Bill Majurski to work out schedule for simulator development based on priorities
Connectathon Guidelines
- Introduce product information to Connectathon registration and results reporting
- Action Item: Chris Carr to add paragraph to Connectathon rules on providing and publishing product names with Connectathon results
Next Meeting
- Scheduled for July 5, which is a US holiday
- Rescheduled to July 6, 10:30-11:30 CT