IHE Testing and Tools Committee 2010-06-07 Teleconference Minutes

From IHE Wiki
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Attendees

  • Karima Bourquard
  • Todd Cooper
  • Bruce Curran, RO
  • Didi Davis
  • Nichole Drye-Mayo
  • Cor Loef
  • Bill Majurski
  • Steve Moore
  • Charles Parisot
  • Eric Poiseau

Minutes

1. Product Registry

  • Eric Poiseau took the group through the new instructions page of the Registry and submission process
  • Instructions page has been added to describe submission process
  • Removed advance checking requirement from publication process; statements are now published and confirmed after the fact
  • Content and usage statistics (number of entries, number of searches) will be added to the main page in near future
  • Currently there is not shared single sign-on with Gazelle; will be added at some in future
  • Companies are encouraged to add integration statements
  • Action Item: Committee members to go through submission process and add comments to issue tracker; test submission url is http://sumo-test.irisa.fr, add to page as "sandbox"
  • Action Item: Chris Carr to add announcement about opening of Registry in IHE News blast

2. Gazelle Development

  • JIRA bug tracking and release management tool at gazelle.ihe.net is used to track development efforts
  • Gazelle Master Model: first version released last week: module with test data will be entered; all instances of Gazelle (for specific testing events) will be "slaves" of this master model
  • January NA event will be run as a separate instance and updates will be added after the fact
  • External Validation Services, Demographic Service and Simulator modules updated; PDS Simulator completed, XDR and XCP are next profile simulators being developed
  • Entering test assertions; so far no GUI for entering them; Committees need to be instructed to identify and specifically format test assertions; each test will be associated with one or more specific assertions in Technical Frameworks; initial testing of BPEL expression of assertions will take place in Pisa next year
  • Domain Coordination Committee asked to designate profiles (perhaps two or three) to develop test assertions; need to compare processes and try to establish common practices across domains
  • DICOM test objects are available in centralized archive; Eric plans to make available to Connectathon participants
  • Bill Majurski working on toolkit to validate any messages and elements of messages in XDS, XDS, XDS, XCA (and Metadata Update); working bottom up on detailed validation; need to find point of convergence with Gazelle test assertions
  • NIST looking for testing use case that requires them to validate content of documents in PCC Profiles with ITI transactions

3. Manager Training Event

  • Sept. 14-16 in Oak Brook, IL; Aug. 1 registration deadline date

4. Next Meeting: June 21, 10-11 CT

  • Review tasks needed to support NA Connectathon in Jan. 2011
  • Regional Deployment Projects: NHIN Direct (Didi), EPSOS Projectathon (Karima)
  • XD* Toolkit


Testing and Tools Committee