Difference between revisions of "IHE Testing and Tools Committee 2010-05-24 Teleconference Minutes"
Jump to navigation
Jump to search
Chrisdcarr (talk | contribs) |
Chrisdcarr (talk | contribs) |
||
Line 10: | Line 10: | ||
2. IHE Korea Connectathon | 2. IHE Korea Connectathon | ||
+ | * Lisa Spellman provided updated announcement from Dr. Lee | ||
+ | :* Action Item: Chris Carr to send to ihenews list | ||
3. Gazelle Development Plan | 3. Gazelle Development Plan | ||
− | * Geneva: XDS.b support | + | * Geneva registration tool: XDS.b support |
+ | :* Steve Moore has implemented support; no further work required from outside contractor | ||
* Registry: instructions, policies | * Registry: instructions, policies | ||
+ | :* Instruction text needs to be expanded and improved: propose that Eric Poiseau take a pass at improving and present to Testing and Tools Cmte | ||
+ | |||
+ | 4. NHIN Direct | ||
+ | * Spinning off testing group in July | ||
+ | * Investigate synergies on tools use/development | ||
+ | |||
+ | 5. Next call: June 7 | ||
+ | * Product Registry: review documentation and publication process; examine policy requiring link to self-published integration statement | ||
+ | |||
[[Testing and Tools Committee]] | [[Testing and Tools Committee]] | ||
[[Category: Minutes]] | [[Category: Minutes]] |
Revision as of 10:34, 24 May 2010
Attendees
- Cor Loef
- Didi Davis
- Joan McMillen
- Lisa Spellman
Minutes
1. Connectathon Manager Training Event
2. IHE Korea Connectathon
- Lisa Spellman provided updated announcement from Dr. Lee
- Action Item: Chris Carr to send to ihenews list
3. Gazelle Development Plan
- Geneva registration tool: XDS.b support
- Steve Moore has implemented support; no further work required from outside contractor
- Registry: instructions, policies
- Instruction text needs to be expanded and improved: propose that Eric Poiseau take a pass at improving and present to Testing and Tools Cmte
4. NHIN Direct
- Spinning off testing group in July
- Investigate synergies on tools use/development
5. Next call: June 7
- Product Registry: review documentation and publication process; examine policy requiring link to self-published integration statement