Difference between revisions of "IHE Testing and Tools Committee 2010-05-24 Teleconference Minutes"

From IHE Wiki
Jump to navigation Jump to search
(New page: ==Attendees== ==Minutes== 1. Connectathon Manager Training Event 2. IHE Korea Connectathon 3. Gazelle Development Plan Testing and Tools Committee Category: Minutes)
 
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
==Attendees==
 
==Attendees==
 
+
* Cor Loef
 
+
* Didi Davis
 
+
* Joan McMillen
 +
* Steve Moore
 +
* Lisa Spellman
  
 
==Minutes==
 
==Minutes==
Line 9: Line 11:
  
 
2. IHE Korea Connectathon
 
2. IHE Korea Connectathon
 +
* Lisa Spellman provided updated announcement from Dr. Lee
 +
:* Action Item: Chris Carr to send to ihenews list
  
 
3. Gazelle Development Plan  
 
3. Gazelle Development Plan  
 +
* Geneva registration tool: XDS.b support
 +
:* Steve Moore has implemented support; no further work required from outside contractor
 +
* Registry: instructions, policies
 +
:* Instruction text needs to be expanded and improved: propose that Eric Poiseau take a pass at improving and present to Testing and Tools Cmte
 +
 +
4. NHIN Direct
 +
* Spinning off testing group in July
 +
* Investigate synergies on tools use/development
 +
 +
5. Next call: June 7
 +
* Product Registry: review documentation and publication process; examine policy requiring link to self-published integration statement
 +
  
 
[[Testing and Tools Committee]]
 
[[Testing and Tools Committee]]
  
 
[[Category: Minutes]]
 
[[Category: Minutes]]

Latest revision as of 10:34, 24 May 2010

Attendees

  • Cor Loef
  • Didi Davis
  • Joan McMillen
  • Steve Moore
  • Lisa Spellman

Minutes

1. Connectathon Manager Training Event

2. IHE Korea Connectathon

  • Lisa Spellman provided updated announcement from Dr. Lee
  • Action Item: Chris Carr to send to ihenews list

3. Gazelle Development Plan

  • Geneva registration tool: XDS.b support
  • Steve Moore has implemented support; no further work required from outside contractor
  • Registry: instructions, policies
  • Instruction text needs to be expanded and improved: propose that Eric Poiseau take a pass at improving and present to Testing and Tools Cmte

4. NHIN Direct

  • Spinning off testing group in July
  • Investigate synergies on tools use/development

5. Next call: June 7

  • Product Registry: review documentation and publication process; examine policy requiring link to self-published integration statement


Testing and Tools Committee