Difference between revisions of "IHE Testing and Tools Committee 2010-04-26 Teleconference Minutes"

From IHE Wiki
Jump to navigation Jump to search
Line 17: Line 17:
 
* Joint effort with Continua
 
* Joint effort with Continua
 
* Preparation for Demonstration at Asia-Pac meeting (Oct.)
 
* Preparation for Demonstration at Asia-Pac meeting (Oct.)
* Testing dates: Sept. 20-24
+
* Testing dates:  
 
* Call for participants to go out by May 1
 
* Call for participants to go out by May 1
 
* Estimate 12-15 participants
 
* Estimate 12-15 participants

Revision as of 16:05, 26 April 2010

Attendees

  • Chris Carr - RSNA
  • Todd Cooper - IEEE
  • Bruce Curran - ASTRO
  • Didi Davis - Serendipity Consulting
  • Sungkee Lee - Kyungpook University
  • Joan McMillen - RSNA
  • Steve Moore - Mallinckrodt
  • Eric Poiseau - INRIA
  • Lisa Spellman - HIMSS

Minutes

1) IHE Korea Connectathon

  • Todd Cooper and Dr. Sungkee Lee presented IHE Korea's request to have its planned testing eventrecognized as an IHE Connectathon
  • Scope of testing limited to a single PCD profile, DEC, showing new Web services communication layer
  • Joint effort with Continua
  • Preparation for Demonstration at Asia-Pac meeting (Oct.)
  • Testing dates:
  • Call for participants to go out by May 1
  • Estimate 12-15 participants


2) IHE RO Connectathon

  • Connectathon Sponsor: ASTRO

Connectathon Dates: September 20 – 24, 2010

Connectathon Location: ASTRO HQ, Fairfax, VA


Connectathon Manager: Bruce Curran / Sunita Ranjitar

Technical Project Manager: Bruce Curran

Connectathon Monitors: Bruce Curran (co-chair, Rhode Island Hospital)

Walter Bosch (Advanced Technology Consortium, WashU of StL)

Prabhakar Tripuranemi (Scripps Clinic)

Lakshmi Santanam (Washington University of St. Louis)

Julio Almansa (Spanish Association of Medical Physicists)

Others TBD


Profiles to be tested: Basic RT Objects Interoperability (IHE-RO 2007)

                                                           Multi-modality Registration for RT (IHE-RO 2008)
                                                           Advanced RT Objects Interoperability (IHE-RO 2009)
                                                           Dose Compositing (IHE-RO 2010)
                                                           Treatment Delivery Workflow (IHE-RO 2010)


This will be the 4th IHE-RO Connectathon, previous ones having been held in 2007, 2008, and 2009. IHE-RO Connectathons generally have 10–15 vendors present testing 12–20 products. Bruce Curran has been the Connectathon and Technical Project Manager for all previous IHE-RO Connectathons as well as coordinator of the monitors. Walter Bosch and Prabhakar Tripuranemi have been monitors at all previous Connectathons, while Lakshmi Santanam and Julio Almansa participated as monitors at the 2009 Connectathon.


Test results are reviewed by the monitors at the end of each day and at the completion of the Connectathon. Results are presented to and approved by the IHE-RO Technical Committee following the Connectathon.


3) Connectathon Manager Training Events

  • June 7-9 Training event in Paris
  • Bill Majurski, Steve Moore and Eric Poiseau planned faculty
  • Need 3 organizations participating to go ahead
  • May 7 as registration drop dead date: need to allow time to cancel international air fare
  • Registration will be through direct connection with coordinator
  • Eric Poiseau forwarded announcement with contact information
  • <Action Item>: Chris Carr to send annct to ihenews
  • Fall training event in US
  • Dates: Sept. 29-Oct. 1
  • <Action Item>: Chris Carr will confirm availability of RSNA HQ facility

4) Gazelle Status

  • Eric developing priority list of simulator actors to be added over the next several months

5) IHE Europe Connectathon Outcomes


Testing and Tools Committee