Difference between revisions of "IHE Testing and Tools Committee 2010-04-26 Teleconference Minutes"
Jump to navigation
Jump to search
Chrisdcarr (talk | contribs) |
Chrisdcarr (talk | contribs) |
||
Line 13: | Line 13: | ||
1) IHE Korea Connectathon | 1) IHE Korea Connectathon | ||
− | * Todd Cooper and Dr. Sungkee Lee presented IHE Korea's request to have its planned testing event recognized as an IHE Connectathon | + | * Todd Cooper and Dr. Sungkee Lee presented [http://docs.google.com/fileview?id=0B1A2kOz33tdvNzhjOTFlNDQtNGUxMy00Yzk0LWFkNTktMDk5ZGIzOTczNGM5&hl=en IHE Korea's request to have its planned testing event]recognized as an IHE Connectathon |
* Scope of testing limited to a single PCD profile, DEC, showing new Web services communication layer | * Scope of testing limited to a single PCD profile, DEC, showing new Web services communication layer | ||
* Joint effort with Continua | * Joint effort with Continua |
Revision as of 15:54, 26 April 2010
Attendees
- Chris Carr - RSNA
- Todd Cooper - IEEE
- Bruce Curran - ASTRO
- Didi Davis - Serendipity Consulting
- Sungkee Lee - Kyungpook University
- Joan McMillen - RSNA
- Steve Moore - Mallinckrodt
- Eric Poiseau - INRIA
- Lisa Spellman - HIMSS
Minutes
1) IHE Korea Connectathon
- Todd Cooper and Dr. Sungkee Lee presented IHE Korea's request to have its planned testing eventrecognized as an IHE Connectathon
- Scope of testing limited to a single PCD profile, DEC, showing new Web services communication layer
- Joint effort with Continua
- Preparation for Demonstration at Asia-Pac meeting
2) IHE RO Connectathon
3) Connectathon Manager Training Events
- June 7-9 Training event in Paris
- Bill Majurski, Steve Moore and Eric Poiseau planned faculty
- Need 3 organizations participating to go ahead
- May 7 as registration drop dead date: need to allow time to cancel international air fare
- Registration will be through direct connection with coordinator
- Eric Poiseau forwarded announcement with contact information
- <Action Item>: Chris Carr to send annct to ihenews
- Oct. training event in US
- Dates: Sept. 29-Oct. 1
- <Action Item>: Chris Carr will confirm availability of RSNA HQ facility
4) Gazelle Status
- Eric developing priority list of simulator actors to be added over the next several months
5) IHE Europe Connectathon Outcomes