Difference between revisions of "IHE Testing and Tools Committee 2009-05-11 Teleconference Minutes"
Jump to navigation
Jump to search
Chrisdcarr (talk | contribs) |
Chrisdcarr (talk | contribs) |
||
Line 18: | Line 18: | ||
2) [http://docs.google.com/Doc?id=dcknbdz7_2cvkwjgfw Training] | 2) [http://docs.google.com/Doc?id=dcknbdz7_2cvkwjgfw Training] | ||
+ | * Planned as three-day training event | ||
* Location dependent on availability of venue and coordination with other meetings (eg, ITI) | * Location dependent on availability of venue and coordination with other meetings (eg, ITI) | ||
* Centralized location preferred (eg, Paris, Chicago, Wash DC) | * Centralized location preferred (eg, Paris, Chicago, Wash DC) | ||
* ITI Planning meeting in Oct (Chicago or Paris) may be event to coordinate training with | * ITI Planning meeting in Oct (Chicago or Paris) may be event to coordinate training with | ||
+ | :* Lisa to pressure ITI to set dates and venue | ||
3) Gazelle | 3) Gazelle |
Revision as of 10:33, 11 May 2009
Attendees
- Chris Carr
- Cor Loef
- Bill Majurski
- Joan McMillen
- Lisa Spellman
Minutes
- Group to review document prior to May 25 tcon
- Chris Carr will invite comments from China, Malaysia, Japan, Australia
- Goal is to present a document to Board for approval on its June 11 teleconference
2) Training
- Planned as three-day training event
- Location dependent on availability of venue and coordination with other meetings (eg, ITI)
- Centralized location preferred (eg, Paris, Chicago, Wash DC)
- ITI Planning meeting in Oct (Chicago or Paris) may be event to coordinate training with
- Lisa to pressure ITI to set dates and venue
3) Gazelle
4) Registry: http://product-registry.ihe.net/