Difference between revisions of "IHE Testing and Tools Committee 2009-05-11 Teleconference Minutes"
Jump to navigation
Jump to search
Chrisdcarr (talk | contribs) |
Chrisdcarr (talk | contribs) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 15: | Line 15: | ||
* Group to review document prior to May 25 tcon | * Group to review document prior to May 25 tcon | ||
* Chris Carr will invite comments from China, Malaysia, Japan, Australia | * Chris Carr will invite comments from China, Malaysia, Japan, Australia | ||
+ | * Incorporate results reporting criteria (trial implementation vs. final text results, etc.) | ||
:* Goal is to present a document to Board for approval on its June 11 teleconference | :* Goal is to present a document to Board for approval on its June 11 teleconference | ||
2) [http://docs.google.com/Doc?id=dcknbdz7_2cvkwjgfw Training] | 2) [http://docs.google.com/Doc?id=dcknbdz7_2cvkwjgfw Training] | ||
+ | * Planned as three-day training event | ||
* Location dependent on availability of venue and coordination with other meetings (eg, ITI) | * Location dependent on availability of venue and coordination with other meetings (eg, ITI) | ||
* Centralized location preferred (eg, Paris, Chicago, Wash DC) | * Centralized location preferred (eg, Paris, Chicago, Wash DC) | ||
* ITI Planning meeting in Oct (Chicago or Paris) may be event to coordinate training with | * ITI Planning meeting in Oct (Chicago or Paris) may be event to coordinate training with | ||
+ | :* Lisa to pressure ITI to set dates and venue | ||
3) Gazelle | 3) Gazelle | ||
+ | * Test engine prototype due at the end of May | ||
4) Registry: [http://product-registry.ihe.net/ http://product-registry.ihe.net/] | 4) Registry: [http://product-registry.ihe.net/ http://product-registry.ihe.net/] | ||
+ | * Small-scale testing by vendors is ongoing | ||
+ | * Need clearance from Eric Poiseau before expanding pilot project | ||
+ | 5) Next Tcon: | ||
+ | * Regularly scheduled day (May 25) is US holiday: move meeting to Tuesday, May 26, 11am CT | ||
Latest revision as of 10:44, 11 May 2009
Attendees
- Chris Carr
- Cor Loef
- Bill Majurski
- Joan McMillen
- Lisa Spellman
Minutes
- Group to review document prior to May 25 tcon
- Chris Carr will invite comments from China, Malaysia, Japan, Australia
- Incorporate results reporting criteria (trial implementation vs. final text results, etc.)
- Goal is to present a document to Board for approval on its June 11 teleconference
2) Training
- Planned as three-day training event
- Location dependent on availability of venue and coordination with other meetings (eg, ITI)
- Centralized location preferred (eg, Paris, Chicago, Wash DC)
- ITI Planning meeting in Oct (Chicago or Paris) may be event to coordinate training with
- Lisa to pressure ITI to set dates and venue
3) Gazelle
- Test engine prototype due at the end of May
4) Registry: http://product-registry.ihe.net/
- Small-scale testing by vendors is ongoing
- Need clearance from Eric Poiseau before expanding pilot project
5) Next Tcon:
- Regularly scheduled day (May 25) is US holiday: move meeting to Tuesday, May 26, 11am CT