Difference between revisions of "IHE Testing and Tools Committee 2009-05-11 Teleconference Minutes"

From IHE Wiki
Jump to navigation Jump to search
 
(One intermediate revision by the same user not shown)
Line 15: Line 15:
 
* Group to review document prior to May 25 tcon
 
* Group to review document prior to May 25 tcon
 
* Chris Carr will invite comments from China, Malaysia, Japan, Australia
 
* Chris Carr will invite comments from China, Malaysia, Japan, Australia
 +
* Incorporate results reporting criteria (trial implementation vs. final text results, etc.)
 
:* Goal is to present a document to Board for approval on its June 11 teleconference
 
:* Goal is to present a document to Board for approval on its June 11 teleconference
  
Line 25: Line 26:
  
 
3) Gazelle
 
3) Gazelle
 +
* Test engine prototype due at the end of May
  
 
4) Registry: [http://product-registry.ihe.net/ http://product-registry.ihe.net/]
 
4) Registry: [http://product-registry.ihe.net/ http://product-registry.ihe.net/]
 +
* Small-scale testing by vendors is ongoing
 +
* Need clearance from Eric Poiseau before expanding pilot project
  
 +
5) Next Tcon:
 +
* Regularly scheduled day (May 25) is US holiday: move meeting to Tuesday, May 26, 11am CT
  
  

Latest revision as of 10:44, 11 May 2009

Attendees

  • Chris Carr
  • Cor Loef
  • Bill Majurski
  • Joan McMillen
  • Lisa Spellman


Minutes

1) Connectathon Guidelines

  • Group to review document prior to May 25 tcon
  • Chris Carr will invite comments from China, Malaysia, Japan, Australia
  • Incorporate results reporting criteria (trial implementation vs. final text results, etc.)
  • Goal is to present a document to Board for approval on its June 11 teleconference

2) Training

  • Planned as three-day training event
  • Location dependent on availability of venue and coordination with other meetings (eg, ITI)
  • Centralized location preferred (eg, Paris, Chicago, Wash DC)
  • ITI Planning meeting in Oct (Chicago or Paris) may be event to coordinate training with
  • Lisa to pressure ITI to set dates and venue

3) Gazelle

  • Test engine prototype due at the end of May

4) Registry: http://product-registry.ihe.net/

  • Small-scale testing by vendors is ongoing
  • Need clearance from Eric Poiseau before expanding pilot project

5) Next Tcon:

  • Regularly scheduled day (May 25) is US holiday: move meeting to Tuesday, May 26, 11am CT


Testing and Tools Committee