Difference between revisions of "IHE Testing and Tools Committee 2009-03-30 Teleconference Minutes"
Jump to navigation
Jump to search
Chrisdcarr (talk | contribs) |
Chrisdcarr (talk | contribs) |
||
Line 13: | Line 13: | ||
::* January 2010 Connectathon to use Gazelle | ::* January 2010 Connectathon to use Gazelle | ||
::* Eric's group (INRIA) to devote focused attention to test engine over the next few months | ::* Eric's group (INRIA) to devote focused attention to test engine over the next few months | ||
+ | ::* MIR has two engineer FTEs working on Gazelle (also performs Connectathon management and domain committee work/test plan development) | ||
+ | ::* INRIA has three FTEs working on Gazelle | ||
::* Delays have made it difficult for NIST to link up its simulation tools | ::* Delays have made it difficult for NIST to link up its simulation tools | ||
:* NIST Plans | :* NIST Plans |
Revision as of 10:17, 30 March 2009
Attendees
- Steve Moore
- Eric Poiseau
- Joan McMillen
- Chris Carr, RSNA
Minutes
1) Tools Development Planning with NIST
-
- January 2010 Connectathon to use Gazelle
- Eric's group (INRIA) to devote focused attention to test engine over the next few months
- MIR has two engineer FTEs working on Gazelle (also performs Connectathon management and domain committee work/test plan development)
- INRIA has three FTEs working on Gazelle
- Delays have made it difficult for NIST to link up its simulation tools
- NIST Plans
- CCHIT and Cypress
2) Connectathon Process Guidelines
- Review updated draft of Connectathon QC guidelines and Sponsor requirements
3) Product Registry Development and Rollout
- Vendor input pilot
- User review pilot
4) Connectathon Monitor/Project Manager Training Event
- Date
- Location
- Cost
- Target Audience