Difference between revisions of "IHE Testing and Tools Committee 2009-03-30 Teleconference Minutes"
Jump to navigation
Jump to search
Chrisdcarr (talk | contribs) |
Chrisdcarr (talk | contribs) |
||
Line 11: | Line 11: | ||
1) Tools Development Planning with NIST | 1) Tools Development Planning with NIST | ||
:* [ftp://ftp.ihe.net/Testing_and_Tools/Gazelle_2009_schedule.doc Gazelle Plans] | :* [ftp://ftp.ihe.net/Testing_and_Tools/Gazelle_2009_schedule.doc Gazelle Plans] | ||
+ | ::* January 2010 Connectathon to use Gazelle | ||
+ | ::* Eric's group (INRIA) to devote focused attention to test engine over the next few months | ||
+ | ::* Delays have made it difficult for NIST to link up its simulation tools | ||
:* NIST Plans | :* NIST Plans | ||
:* CCHIT and Cypress | :* CCHIT and Cypress |
Revision as of 10:13, 30 March 2009
Attendees
- Steve Moore
- Eric Poiseau
- Joan McMillen
- Chris Carr, RSNA
Minutes
1) Tools Development Planning with NIST
-
- January 2010 Connectathon to use Gazelle
- Eric's group (INRIA) to devote focused attention to test engine over the next few months
- Delays have made it difficult for NIST to link up its simulation tools
- NIST Plans
- CCHIT and Cypress
2) Connectathon Process Guidelines
- Review updated draft of Connectathon QC guidelines and Sponsor requirements
3) Product Registry Development and Rollout
- Vendor input pilot
- User review pilot
4) Connectathon Monitor/Project Manager Training Event
- Date
- Location
- Cost
- Target Audience