Difference between revisions of "IHE Testing and Tools Committee 2009-03-30 Teleconference Minutes"

From IHE Wiki
Jump to navigation Jump to search
Line 1: Line 1:
 
==Attendees==
 
==Attendees==
 +
* Lisa Carnahan
 
* Steve Moore
 
* Steve Moore
 +
* Charles Parisot
 
* Eric Poiseau
 
* Eric Poiseau
 +
* Rob Snelick
 
* Joan McMillen
 
* Joan McMillen
 
 
 
* Chris Carr, RSNA
 
* Chris Carr, RSNA
  

Revision as of 10:18, 30 March 2009

Attendees

  • Lisa Carnahan
  • Steve Moore
  • Charles Parisot
  • Eric Poiseau
  • Rob Snelick
  • Joan McMillen
  • Chris Carr, RSNA

Minutes

1) Tools Development Planning with NIST

  • January 2010 Connectathon to use Gazelle
  • Eric's group (INRIA) to devote focused attention to test engine over the next few months
  • MIR has two engineer FTEs working on Gazelle (also performs Connectathon management and domain committee work/test plan development)
  • INRIA has three FTEs working on Gazelle
  • Delays have made it difficult for NIST to link up its simulation tools
  • NIST Plans
  • CCHIT and Cypress

2) Connectathon Process Guidelines

  • Review updated draft of Connectathon QC guidelines and Sponsor requirements

3) Product Registry Development and Rollout

  • Vendor input pilot
  • User review pilot

4) Connectathon Monitor/Project Manager Training Event

  • Date
  • Location
  • Cost
  • Target Audience


Testing and Tools Committee