Difference between revisions of "IHE Testing and Tools Committee 2009-03-30 Teleconference Minutes"
Jump to navigation
Jump to search
Chrisdcarr (talk | contribs) |
Chrisdcarr (talk | contribs) |
||
Line 1: | Line 1: | ||
==Attendees== | ==Attendees== | ||
− | + | * Steve Moore | |
+ | * Eric Poiseau | ||
+ | * Joan McMillen | ||
* Chris Carr, RSNA | * Chris Carr, RSNA | ||
− | |||
==Minutes== | ==Minutes== |
Revision as of 10:08, 30 March 2009
Attendees
- Steve Moore
- Eric Poiseau
- Joan McMillen
- Chris Carr, RSNA
Minutes
1) Tools Development Planning with NIST
- Gazelle Plans
- NIST Plans
- CCHIT and Cypress
2) Connectathon Process Guidelines
- Review updated draft of Connectathon QC guidelines and Sponsor requirements
3) Product Registry Development and Rollout
- Vendor input pilot
- User review pilot
4) Connectathon Monitor/Project Manager Training Event
- Date
- Location
- Cost
- Target Audience